Road junction
Jane Byrne Interchange | |
---|---|
Circle Interchange | |
View of the interchange from the BMO Tower in October 2022 | |
Location | |
Chicago, Illinois | |
Coordinates | 41°52′32″N 87°38′44″W / 41.87556°N 87.64556°W / 41.87556; -87.64556 |
Roads at junction | I-90 IL 110 (CKC) |
Construction | |
Opened | 1960s; 63 years ago (1960s) |
Maintained by | IDOT |
The Jane Byrne Interchange (until 2014, Circle Interchange) is a major freeway interchange near downtown Chicago, Illinois. It is the junction between the Dan Ryan, Kennedy and Eisenhower Expressways (I-90/I-94 and I-290), and Ida B. Wells Drive. In a dedication ceremony held on August 29, 2014, the interchange was renamed in honor of former Chicago mayor Jane M. Byrne (1979–1983).
First developed in the late 1950s and 1960s, over time the interchange in its original configuration became notorious for traffic jams. In 2004, it was rated as the country's third-worst traffic bottleneck, with approximately 400,000 vehicles using it per day. In a 2010 study of freight congestion (truck speed and travel time), the U.S. Department of Transportation ranked this section of I-290 as having the worst congestion in the United States. This led to an $800 million reconfiguration begun in 2013 and completed in December 2022.
Design
This interchange as originally built was an asymmetrical turbine interchange, with each of the four mainlines having a single entrance and exit serving both directions of the crossing highway. It did not use the quadruple-decker architecture commonly associated with stack interchanges. Instead, it had a flattened layout, using the long, curving ramps to circumnavigate the crossing of the mainlines. This resulted in fewer tall bridges and gave the interchange its distinctive "circle" appearance. Since 2016, it has had a three-level stack in the center due to the realignment of the north-to-west ramp.
Both I-90/I-94 and I-290/Ida B. Wells Drive have four lanes in each direction at this interchange (three lanes prior to December 2022). Most of the ramps leading to and from the freeways are one lane wide, except for the ramps from eastbound I-290 to I-90/94 in both directions and the ramp from I-90/94 westbound/Dan Ryan Expressway to I-290; these ramps are two lanes wide.
This interchange centers on Ida B. Wells Drive (the east–west surface street that is the continuation of the Eisenhower Expressway beyond its terminus several blocks east of the interchange) and extends roughly from Halsted Street on the west to Jefferson Street on the east.
The tracks of the Chicago Transit Authority Blue Line 'L' train pass directly underneath the center of the interchange, running in an east–west direction, as they transition from surface operation in the median of the Eisenhower Expressway, to a subway to the east of the Interchange. This complicates where support columns could be located in any future construction at this interchange.
History
Originally known as the Congress Interchange and changed to Circle Interchange in 1964, it was built in the late 1950s and early 1960s, at the same time as the construction of the Kennedy Expressway.
The University of Illinois at Chicago is to the southwest of the interchange. When the campus opened in 1965, it was called the University of Illinois at Chicago Circle, making it the only university in the world known to be named after a freeway interchange.
Due to its congestion, the May 2008 issue of Popular Mechanics listed this interchange among their list of the 10 Pieces of U.S. Infrastructure We Must Fix Now.
In a dedication ceremony held on August 29, 2014, this interchange, formerly called the Circle Interchange, was renamed the Jane Byrne Interchange in honor of former Chicago Mayor Jane M. Byrne (1979–1983). The market's radio and television traffic reporting services immediately instituted the interchange's new name, although many went with a dual reference of the "Jane Byrne–Circle Interchange" during a transition period until the services updated their maps and road signage was changed to reflect the new name, to avert confusion.
Reconstruction project
In August 2012, the Illinois Department of Transportation (IDOT) began the planning and design phases for the potential rehabilitation of this interchange. It has established a project web site, which is being used to schedule public meetings.
On April 3, 2013, the Chicago Tribune featured a front-page article on the estimated $420 million project, which was slated to take four years. The project began in late 2013. The interchange, as well as a series of overpasses surrounding it, would receive a complete overhaul, including the addition of a flyover ramp from northbound I-90/I-94 to westbound I-290. It also sought to move the Taylor Street exit (from eastbound I-90/I-94 traffic) north.
The northwest flyover of the Jane Byrne Interchange opened on December 4, 2016, after which the old ramp was closed and demolished. Several more ramps, as well as the expressways themselves, were rebuilt during the course of the project. One ramp that connects from northbound Dan Ryan to eastbound Ida B. Wells was closed from the spring of 2014 to September 7, 2019. On the same day, the second lane of the flyover ramp, as well as the Morgan Street off-ramp, opened.
Delays and increasing costs led to a final completion date of December 16, 2022, at which time all lanes and ramps were opened to motorists. The estimated final cost of the reconstruction was $804.6 million. IDOT stated they expected a 50% reduction in traffic delays as a result of the project's conclusion.
See also
References
- Neil Steinberg (May 23, 2023). "Honor Jane Byrne on her 90th birthday by taking the train". Chicago Sun-Times. Archived from the original on June 19, 2023. Retrieved June 18, 2023.
- ^ "Circle Interchange to Be Renamed for Jane Byrne Today". Chicago Tribune. Archived from the original on August 29, 2014. Retrieved August 29, 2014.
- ^ Sofge, Erik (April 7, 2008). "10 Pieces of U.S. Infrastructure We Must Fix Now—Brooklyn Bridge, Chicago, New Orleans—Rebuilding America". Popular Mechanics. Archived from the original on April 14, 2022. Retrieved August 29, 2015.
- "Chapter 3". Traffic Congestion and Reliability: Trends and Advanced Strategies for Congestion Mitigation. Federal Highway Administration. Archived from the original on August 13, 2022. Retrieved August 7, 2007.
- "Table 3-9. Top 25 Freight Highway Locations by Freight Congestion Index Rating: 2010". Federal Highway Administration. 2011. Archived from the original on June 6, 2013. Retrieved July 26, 2013.
- Dudek, Mitch (December 14, 2022). "After nearly 10 years, Jane Byrne Interchange 'substantially complete,' expected to cut congestion in half". Chicago Sun-Times. Archived from the original on December 15, 2022. Retrieved December 15, 2022.
- "Benefits - Jane Byrne Interchange". www.janebyrneinterchange.org. Archived from the original on February 1, 2023. Retrieved December 16, 2022.
- http://www.circleinterchange.org/pdf/document_library/circle%20cdr_vol%201%20of%203.pdf
- Young, David M. (2005). "Spaghetti Bowl". Encyclopedia of Chicago. Chicago Historical Society. Retrieved January 26, 2008.
- UIC Historian (2006). "Chicago Circle Campus Construction". Board of Trustees of the University of Illinois. Archived from the original on December 24, 2007. Retrieved February 1, 2008.
- "Interchanging Identities". UIC School of Architecture. Archived from the original on February 13, 2012. Retrieved February 2, 2008.
- ^ "Circle Interchange". Illinois Department of Transportation. Archived from the original on September 4, 2012. Retrieved August 27, 2012.
- "Public Meetings / Hearings". Illinois Department of Transportation. Archived from the original on April 9, 2013. Retrieved February 22, 2013.
- "Chicago Tribune: Chicago news, sports, weather, entertainment". Chicago Tribune. Archived from the original on April 3, 2013. Retrieved October 30, 2020.
- Hilkevitch, Jon. "IDOT finalizing plan to unsnarl Circle Interchange". Chicago Tribune. Archived from the original on December 19, 2020. Retrieved October 30, 2020.
- "About | Jane Byrne Interchange". www.janebyrneinterchange.org. Archived from the original on August 28, 2022. Retrieved October 30, 2020.
- Ward, Joe (November 30, 2016). "Long Awaited Outbound Eisenhower Ramp From Inbound Dan Ryan Opens Soon". DNAinfo Chicago. Archived from the original on November 14, 2017. Retrieved June 11, 2022.
- "Circle Interchange–Completed Projects". www.janebyrneinterchange.org. Archived from the original on August 11, 2019. Retrieved August 11, 2019.
- Jindra, Sarah; Dwyer, Meghan (September 6, 2019). "Relief on the way for drivers at the Jane Byrne Interchange". WGN-TV. Retrieved April 7, 2022.
- Varon, Roz (February 8, 2022). "Chicago construction on Jane Byrne Interchange to wrap up this year, IDOT says". ABC7 Chicago. Archived from the original on April 7, 2022. Retrieved April 7, 2022.
- "Byrne interchange construction will continue through 2022 | Gazette Chicago". gazettechicago.com. Archived from the original on December 2, 2020. Retrieved October 30, 2020.
- "Jane Byrne Interchange officially opens; overnight closures still expected". www.cbsnews.com. December 16, 2022. Archived from the original on December 17, 2022. Retrieved December 17, 2022.
External links
- Official website
- The Chicago Sun-Times Chicagopedia