Misplaced Pages

Jarun Bridge

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Planned bridge in Croatia
Jarun Bridge
Coordinates45°46′54″N 15°54′05″E / 45.7817°N 15.9014°E / 45.7817; 15.9014
CrossesSava River
Localesouthwest Zagreb, Croatia
Official nameJarunski most
Characteristics
Total length625 m (2,051 ft)
Width42 m (138 ft)
Longest span150 m (492 ft)
History
Construction cost€40 million (est.)
Location

Jarun Bridge (Croatian: Jarunski most) is a planned bridge that will cross the Sava River in Zagreb, the capital of Croatia. The bridge will be located in the western part of the city, Trešnjevka near Lake Jarun.

The city of Zagreb organized a tender for the design of the Jarun Bridge in 2006, and accepted the project in 2007. Building permits were issued in 2011, but the construction, originally estimated to cost around €40 million, did not start due to a lack of funds. As of 2013, the city was considering a pedestrian-and-cycle design as a cheaper alternative. In early 2020, the process of acquiring the building permits was reinitiated.

References

  1. "Uz idealne okolnosti, gradnja Jarunskog mosta tehnički moguća već ovoga ljeta". Vjesnik. 2008-02-19. Retrieved 2011-01-18.
  2. ^ "Most za bicikliste i pješake spojit će Lanište i Jarun". Večernji list (in Croatian). 24 October 2013. Retrieved 26 March 2015.
  3. "Grad je nakon devet godina ponovo zatražio lokacijsku za Jarunski most". www.vecernji.hr (in Croatian). Retrieved 2021-06-15.
Road bridges in Zagreb

45°46′54″N 15°54′5″E / 45.78167°N 15.90139°E / 45.78167; 15.90139


Stub icon

This City of Zagreb geography article is a stub. You can help Misplaced Pages by expanding it.

Stub icon 1 Stub icon 2

This article about a bridge in Croatia is a stub. You can help Misplaced Pages by expanding it.

Categories: