Bridge in Oakmont, Pennsylvania
Jonathon Hulton Bridge | |
---|---|
Coordinates | 40°31′42″N 79°50′48″W / 40.5283°N 79.8466°W / 40.5283; -79.8466 |
Carries | 2 lanes of Allegheny County SR 2082 |
Crosses | Allegheny River |
Locale | Oakmont, Pennsylvania |
Official name | Jonathon Hulton Bridge |
Other name(s) | Hulton Bridge |
Maintained by | PennDOT |
Characteristics | |
Design | subdivided Parker Pratt through truss |
Material | Steel |
Total length | 470.6 metres (1,544 ft) |
Longest span | 140.2 metres (460 ft) |
No. of spans | 5 |
Piers in water | 3 |
Clearance below | 15.2 metres (50 ft) |
History | |
Opened | Spring of 1910 |
Closed | October 5, 2015 (demolished January 26, 2016) |
Statistics | |
Daily traffic | 22,312 |
Location | |
The Jonathon Hulton Bridge, built in 1908, was the first major bridge designed by Allegheny County, Pennsylvania. Spanning the Allegheny River, it connected the eastern Pittsburgh suburbs of Oakmont and Harmarville, Pennsylvania.
History
The bridge was a Parker Pratt through Truss bridge. These bridges were common in the early 20th century for car and rail traffic. The bridge was named for Jonathon Hulton, one of the first landowners in the Oakmont area. The Hulton family also operated a ferry across the Allegheny River near the current bridge location until its construction.
In 1989 the PA Legislature approved the renaming of the bridge in honor of the late Pennsylvania Representative Joseph F. Bonetto. Plaques were unceremoniously attached to the bridge, and three days later they were removed and never seen again. New larger plaques were put in their place confirming that it was indeed the Jonathon Hulton Bridge. Prior to its implosion, the Hulton Bridge was painted a lavender color, a byproduct of the 1991 refurbishment of the bridge. The last reported crossing of the bridge was by Andy Galata and Jerry Lyons in a BMW Convertible. There is a video record of this titled Memory on the Raidervision Youtube Page.
Replacement project
Construction of a 1,600-foot (490 m)-long steel multi-girder replacement bridge just upstream of the original bridge began in September 2013. The new bridge, which opened to traffic on October 20, 2015, has four 11-foot (3.4 m)-wide traffic lanes (2 in each direction), one 4-foot (1.2 m)-wide median, one 4-foot (1.2 m)-wide shoulder on each side of the roadway, and a 5-foot (1.5 m)-wide ADA-compliant sidewalk on the bridge's southern side.
Aside from the new bridge itself, the scope of the $65 million replacement project also included realignment and reconstruction of parts of Freeport and Hulton roads, relocation of utilities, drainage, pavement markings, and improvements to intersections, lighting, traffic signals, curbs, and sidewalks. Six buildings on the Harmar side of the river were demolished to facilitate construction. The entire project, including implosion of the original bridge, was completed in spring 2016, in time for the 2016 U.S. Open at nearby Oakmont Country Club.
The replacement span was designed by Pennsylvania-based engineering firms Gannett Fleming and McCormick Taylor. Brayman Construction Corporation of Saxonburg, Pennsylvania was the general contractor for the project. Roughly 80% of the project's funding was provided by the federal government.
In 2009, when PennDOT announced the plan to replace and demolish the old bridge, engineering students from Carnegie Mellon University proposed to instead convert it into a pedestrian walkway and connect Oakmont to the Allegheny River Trail. However, it was determined that this conversion would be too costly, and that the old bridge would be demolished as originally planned.
The old bridge was imploded successfully at 9:50 a.m. on January 26, 2016. The implosion could be seen from the Harmar Bald Eagle Camera.
See also
External links
- Hulton Bridge at Pghbridges.com
- Hulton Bridge at bridgehunter.com
- Jonathon Hulton Bridge at Structurae
- Replacement project website Archived December 7, 2013, at the Wayback Machine
References
- ^ Kate Luce Angell "Plan presented to save Hulton Bridge" post-gazette.com December 24, 2009 5:56 am March 10, 2012 http://www.post-gazette.com/stories/local/neighborhoods-east/plan-presented-to-save-hulton-bridge-372845/
- Condit, Carl. American Building Art. New York: Oxford University Press, 1961. Print
- ^ Hanz, Joyce (October 26, 2014). "Hulton Bridge to be focus of Oakmont historian's talk". Pittsburgh Tribune-Review. Retrieved October 21, 2015.
- ^ Jon, Schmitz (February 16, 2009). "Plans for new Hulton Bridge put on display". Pittsburgh Post-Gazette.
- ^ Yerace, Tom (September 13, 2013). "Work to start Monday on new Hulton Bridge". Tribune-Review.
- ^ "Brayman Construction Corporation Heavy Civil & Geotechnical Contractors :: Hulton Bridge".
- ^ "Hulton Bridge Replacement : Construction Schedule". Archived from the original on December 7, 2013. Retrieved December 3, 2013.
- Thomas, Mary Ann (December 1, 2013). "Chill won't halt Hulton Bridge work". Tribute-Review.
- Dezayas, Heidi (July 7, 2013). "Hulton Bridge Replacement: New Photo Rendering". Plum-Oakmont Patch.
- "Brand new Hulton Bridge opened to traffic". WPXI. October 20, 2015. Archived from the original on October 22, 2015. Retrieved October 21, 2015.
- "TRAFFIC: Hulton Bridge closes until Oct. 20, when new span opens". Pittsburgh Post-Gazette. October 5, 2015.
- ^ "Hulton Bridge Replacement : HULTON BRIDGE TO CLOSE OCTOBER 5 TO OCTOBER 20". Archived from the original on October 6, 2015. Retrieved October 7, 2015.
- ^ Schmitz, Jon (September 25, 2015). "Hulton Bridge replacement nears completion". Pittsburgh Post-Gazette.
- ^ "Hulton Bridge Replacement : Overview". Archived from the original on October 16, 2015. Retrieved October 7, 2015.
- ^ Weigland, Jodi (August 2, 2013). "Clinton company may have landed Hulton Bridge project". Tribune-Review.
- "PennDOT District 11-0 Roadwork - Future Construction Projects Index - SR 0028, Section A44". PennDOT District 11-0 Roadwork - Future Construction Projects Index. PennDOT. Retrieved April 25, 2012.
- ^ "Hulton Bridge Replacement : Project Team". Archived from the original on December 7, 2013. Retrieved December 3, 2013.
- Santoni, Matthew (December 9, 2009). "Carnegie Mellon students design alternative use for Oakmont bridge". Pittsburgh Tribune Review. Archived from the original on December 13, 2009.
- Burns, Erin (February 8, 2010). "Student designers re-imagine Oakmont's historic Hulton bridge". The Tartan. Retrieved October 21, 2015.
- "TRAFFIC: Implosion of old Hulton Bridge scheduled Tuesday". January 25, 2016. Retrieved January 25, 2016.
Bridges of the Allegheny River | ||||
---|---|---|---|---|
|
Greater Pittsburgh | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Pittsburgh–New Castle–Weirton combined statistical area | ||||||||||
Counties |
| |||||||||
Major cities | ||||||||||
Cities and towns 15k–50k (in 2010) | ||||||||||
Airports | ||||||||||
Topics | ||||||||||
- Bridges over the Allegheny River
- Bridges in Allegheny County, Pennsylvania
- Road bridges in Pennsylvania
- Bridges completed in 1908
- Buildings and structures demolished in 2016
- 1908 establishments in Pennsylvania
- 2016 disestablishments in Pennsylvania
- Steel bridges in the United States
- Parker truss bridges in the United States