Ronghua Dam | |
---|---|
View of the dam in January 2004 | |
Location | Taoyuan City, Taiwan |
Coordinates | 24°44′13″N 121°21′03″E / 24.73694°N 121.35083°E / 24.73694; 121.35083 |
Construction began | 1978; 46 years ago (1978) |
Opening date | 1984; 40 years ago (1984) |
Dam and spillways | |
Impounds | Dahan River |
Height | 82 metres (269 ft) |
Reservoir | |
Total capacity | 16,700,000 cubic metres (13,500 acre⋅ft) |
Power Station | |
Installed capacity | 40 MW |
Annual generation | 200 million KWh |
Ronghua Dam (Chinese: 榮華大壩; pinyin: Rónghuá Dàbà; Wade–Giles: Jung-hua Ta-pa) is a concrete arch dam crossing the Dahan River, a tributary to the Tamsui River, in Fuxing District, Taoyuan City, Taiwan.
The dam was started in December 1978 and finished in June 1984. The cost was NT$1.83 billion. The Ronghua Dam is within the catchment area of the Shihmen Reservoir, 27 kilometers upstream of the Shihmen Dam in the Dahan River gorge. The dam's main function is to prevent sand from moving downstream and building up as silt in the Shimen Reservoir. It also serves as a diversion point for sending water to a 40,000 kilowatt hydroelectric plant located 6 kilometres (3.7 mi) downstream.
As of 2012, the dam has no effective storage capacity, as almost its entire reservoir has been filled by sediment.
See also
References
- Jung-hua Ta-pa (dam), Taiwan.
- ^ Junghua Dam, Northern Region Water Resources Office, Water Resources Agency, Ministry of Economic Affairs, Taiwan.
External links
- Taiwan Water Resources Agency (in Chinese)
This article about a dam or floodgate in Taiwan is a stub. You can help Misplaced Pages by expanding it. |