Kallang–Paya Lebar Expressway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Kallang Paya Lebar Expressway) Road in Singapore

Kallang–Paya Lebar Expressway
Lebuhraya Kallang-Paya Lebar (Malay)
加冷-巴耶利峇高速公路 (Chinese)
கலாங்-பாயலேபார் விரைவுச்சாலை (Tamil)
Kallang–Paya Lebar Expressway is labelled in single brown line.
Route information
Part of AH143
Length12 km (7.5 mi)
Existed2001–present
HistoryCompleted in 2008
Major junctions
Southeast endKallang (ECP, MCE)
Major intersectionsTPE, ORRS (Bartley Road East), PIE, ECP, MCE
Northeast endHougang (TPE)
Location
CountrySingapore
RegionsHougang, Kallang, Geylang, Paya Lebar
Highway system

The Kallang–Paya Lebar Expressway (KPE) is the third newest of Singapore's network of expressways. The southern (Kallang) section of the expressway opened first, on 26 October 2007, with the remaining (Paya Lebar) section opened on 20 September 2008.

Connecting East Coast Parkway (ECP) in the south and Tampines Expressway (TPE) in the north-east, the six-lane (2x3) expressway extends for twelve kilometres, with approximately 8.5 kilometres (5.3 mi) of main cut and cover tunnels running some 10 kilometres underground when fully completed. Built at a cost of approximately S$1.8 billion (USD$1 billion), it is the longest subterranean road tunnel in Southeast Asia. The KPE is also believed to be the world's sixth longest underground road project at its time under construction. In all, the dual-carriageway expressway with three lanes in each direction will have eight interchanges, eleven on-ramps, and twelve off-ramps. The south end of the KPE also connects directly to the Marina Coastal Expressway which opened on 29 December 2013.

The Land Transport Authority (LTA) has awarded a contract for the expansion of the KPE/TPE interchange at the north end of the expressway and construction of a new road connection to Punggol Central, providing a new and more direct link to and from the KPE and TPE, and alleviating the traffic congestion of the TPE between the current KPE ramps and Punggol ramps. The work would involves the design and construction of roads, three new vehicular bridges crossing Sungei Serangoon and Sungei Blukar, a new flyover across TPE and other associated ramps. Construction works commenced in the second quarter of 2015.

History

The Kallang-Paya Lebar Expressway under construction in 2005
KPE under construction at Circuit Road, MacPherson

A 2.8 km-long Kallang Expressway (KLE) was envisioned as early as 1981, serving as a link between the Pan Island Expressway (PIE) and East Coast Parkway (ECP). It would have become the shortest expressway in Singapore if it was built.

The modern Kallang–Paya Lebar Expressway (KPE) was first conceptualised in the preliminary plans of 1997, merging the KLE and the Paya Lebar Expressway (PLE) into a single expressway.

Construction on KPE started in the year 2001, and was fully completed in 2008. On 23 June 2007, the northern end of the expressway between Tampines Road from the new Defu Flyover and the Tampines Expressway was opened to traffic, and was temporarily named Tampines Service Road. Tampines Road will therefore no longer connect with the Tampines Expressway at the Tampines Flyover. The Defu Flyover along Tampines Road, along with the traffic signals, were commissioned on the same day from 1000 hours.

On 27 July 2007, the LTA announced the opening of the southern ECP-PIE section of the expressway (Phase 1) to traffic on 26 October that year. The entire expressway opened to traffic on 20 September 2008. An official opening was held on 19 October.

Route

The Kallang section of the expressway starts from eastern end of the Marina Coastal Expressway, where it also interchanges with the East Coast Parkway near the fourteen-kilometre mark of the ECP in a northward direction, goes underground below the Geylang River, cuts across the Kallang Sports Complex to the west of the National Stadium, comes to an interchange at the Mountbatten Road/Nicoll Highway/Guillemard Road junction, crosses the East West MRT line, before ending with an interchange with the Pan Island Expressway at the thirteen-kilometre mark of the latter. It adds along some slip roads and minor roads.

The Paya Lebar section continues from where the Kallang Section leaves off beneath the Kallang River and Pelton Canal past MacPherson Estate, comes to an interchange with Paya Lebar Road, Upper Paya Lebar Road, MacPherson Road and Airport Road, crosses over the Circle MRT line which was under construction at the same time as the expressway, and continues for almost three and a half kilometres underground beneath Airport Road and the Paya Lebar Air Base, emerges at ground level near Defu Lane 3, goes on an elevated interchange over Tampines Road. It meets Buangkok East Drive at an interchange before continuing towards the existing Tampines Flyover to meet with Tampines Expressway. It replaces one of the fish farms at Tampines Road.

On 27 July 2007, the LTA announced an extension of the KPE from East Coast Parkway to the Ayer Rajah Expressway via Marina South. The stretch was named Marina Coastal Expressway (MCE). The Marina Coastal Expressway officially opened on 29 December 2013.

List of interchanges and exits

LocationkmmiFlyoverExitDestinationsNotes
Kallang 0.0 0.0 Start of KPE underground tunnel section
0.00.0 MCE (towards AYE)Southern terminus; expressway continues as Marina Coastal Expressway (MCE)
0.40.251 ECP (towards Changi), Sheares AvenueAccess to ECP (towards Changi) signed as exit 1A; southbound exit and northbound entrance only
1.60.992ANicoll HighwaySouthbound exit and entrance only
2.21.42B PIE (towards Tuas)Northbound exit only
2.21.4 PIE (towards Changi)
2.81.72CSims AvenueSouthbound exit only
Geylang3.62.23 PIE (towards Tuas)Southbound exit only
Toa Payoh4.93.05Upper Paya Lebar RoadNorthbound exit (to Upper Paya Lebar Road) and southbound entrance (from Airport Road) only
Hougang6.13.86Bartley Road East (northbound)
Airport Road, Bartley Road East (southbound)
8.5 5.3 End of KPE underground tunnel section
8.85.5Defu9ATampines Road, Hougang Town, Tampines Avenue 10
Sengkang9.86.1Buangkok9BBuangkok Drive (towards Sengkang)
10.96.810Buangkok East Drive (towards Tampines Road)
11.16.9Tampines9C TPE (towards CTE / SLE)
Halus Link, Lorong Halus, Punggol Central
12.07.5Tampines TPE (towards PIE)Expressway continues as Tampines Expressway (TPE)
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Public education and congestion management

In 2006, the Land Transport Authority (LTA) engaged an advertising agency to embark on a public education programme, to inform and educate the public on the proper way to use the KPE – the first time it has done so for a road project. British firm Bartle Bogle Hegarty (BBH) has been appointed to publicise safety messages needed to prepare users for the KPE. BBH, which in turn appointed British public relations firm Grayling, clinched the contract for S$2.81 million. Its campaign started in the second quarter of 2007, consisting of a website and an album Sounds of the Underground of ten songs for the purpose.

The LTA has also put up a tender calling for consultants to develop congestion management systems in the KPE. The call has drawn three submissions. It also rolled out the first dedicated team of Traffic Marshals, with the primary role of rapid deployment to any incident within the tunnels. The annual contract was awarded to Certis CISCO, who would deploy six marshals on motorcycles around the clock in the KPE, to be expanded to 28 motorcycles and three cars across all expressways by the end of 2008.

Speed cameras

KPE's underground section is fitted with digital speed cameras that operate 24 hours throughout the day to enforce the 80 km/h speed limit (lower if safety advisories display so).

In the first week of phase 1 operation 3,400 motorists were caught speeding in the KPE, consisting of 3% of the total traffic which alarmed the traffic police. 45 of the speed violators which were in excess of 40 km/h received court summons, while others received either a traffic summons or a warning letter from the Land Transport Authority.

The speed cameras are easily spotted in the middle section of the tunnel and are found under the main via ducting. There have been no instances of speed cameras flashes indicating a violating vehicle exceeding the limit, as the luminosity in the tunnel does not require additional light source.

References

  1. Wong Mun Wai (24 October 2007). "Kallang-Payar Lebar Expressway to open on Friday". Channel NewsAsia. Archived from the original on 14 October 2012. Retrieved 26 October 2007.
  2. ^ "SPEECH BY MR RAYMOND LIM,MINISTER FOR TRANSPORT, AT VISIT TO KALLANG-PAYA LEBAR EXPRESSWAY, 30 JANUARY 2008, 10.15 AM". Singapore Government Media Release. 30 January 2008.
  3. ^ "PM Lee opens KPE, unveils commemorative book". Channelnewsasia.com. 19 September 2008. Archived from the original on 18 October 2012. Retrieved 20 September 2008.
  4. Kallang-Paya Lebar Expressway – Mott MacDonald Project Page Archived 18 November 2006 at the Wayback Machine
  5. ^ Christopher Tan, "It's the first-ever ad blitz – for a highway", The Straits Times, 27 November 2006
  6. "The Beginning of Singapore's Expressways". Remember Singapore. 29 April 2018. Archived from the original on 14 July 2018. Retrieved 20 April 2019.
  7. "Road Closure — Services Affected: Services 53 & 81 Archived 1 July 2007 at the Wayback Machine", SBS Transit, 22 June 2007
  8. "Opening Of New Access Road To TPE From Tampines Road Archived 28 July 2007 at the Wayback Machine", Land Transport Authority, 22 June 2007
  9. "Phase 1, Kallang – Paya Lebar Expressway To Open On 26 October 2007 Archived 18 August 2007 at the Wayback Machine", Land Transport Authority, 27 July 2007
  10. "Connect" (PDF). Land Transport Authority. Archived from the original (PDF) on 29 December 2009.
  11. "Award Of Contract For Construction Of Vehicular Bridge Over Sungei Serangoon Archived 27 September 2007 at the Wayback Machine", Land Transport Authority, 23 February 2006
  12. "Marina coastal expressway to open on 29 december 2013". Land Transport Authority. 13 November 2013. Archived from the original on 8 May 2016. Retrieved 10 June 2017.
  13. "Master Plan". Urban Redevelopment Authority. Retrieved 15 December 2023.
  14. "KPE until Exit 9A" (Map). Google Maps. Retrieved 17 December 2023.
  15. "KPE (Exit 9B)" (Map). Google Maps. Retrieved 17 December 2023.
  16. ^ "OneMap" (Map). OneMap. Singapore: Singapore Land Authority. Retrieved 12 May 2021.
  17. Wong Mun Wai (25 October 2007). "Traffic Marshals to patrol the new Kallang-Paya Lebar Expressway". Channel NewsAsia. Archived from the original on 26 October 2007. Retrieved 26 October 2007.
  18. About 600 motorists caught speeding every day since new KPE opened Archived 3 November 2007 at the Wayback Machine, Julia Ng, Channel NewsAsia, 2 November 2007
  19. KPE or racetrack?, Leong Wee Keat, Today, 3 November 2007
  20. Laser cameras catch 3,400 motorists speeding on KPE Archived 6 November 2007 at the Wayback Machine, Christopher Tan, The Straits Times, 3 November 2007