Misplaced Pages

Kampala Flyover Road Project

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Road in Kampala,Uganda
This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (January 2022)

Kampala Flyover Road Project
Kampala Flyover worksite (January 2023).jpgWorksite at Mukwano Road and Nsambya Road interchange, January 2023
Route information
Length2.18 mi (3.51 km)
HistoryDesignated in 2018
Completion in 2020 Expected
Major junctions
West endQueen's Way, Kampala
East endWampewo Avenue, Kampala
Location
CountryUganda
Highway system

The Kampala Flyover Road Project, also Kampala Flyover Project, is a road-improvement project in the Central Division of Kampala, the capital city of Uganda and the largest city in that East African country.

Location

The project involves the construction of flyovers at the "Clock Tower", and at "Kitgum House", the widening of Nsambya Road and of Mukwano Road, including the improvements of interfacing roads and junctions. The project stretches over an estimated 3.5 kilometres (2 mi).

Overview

This road project is intended to decongest the city by separating through-traffic from the city-street-traffic. This project focuses on traffic entering the city, mainly from Entebbe along the old Kampala-Entebbe Road and from Mpigi, along the Kampala-Mpigi Expressway. Traffic from these routes, destined to Lugogo, Nakawa and points along the Kampala-Jinja Highway will find this new route faster and more user-friendly, reducing travel times and leading to less carbon emissions from exhaust fumes in stalled traffic on the city streets. Also, by removing the pass-through traffic, off the city streets, the congestion will be lessened.

Background

In an attempt to reduce gridlock within the city of Kampala, the Japan International Cooperation Agency (JICA) commissioned a study in 2010 which was updated in 2013 and 2014 to examine available options for alleviating chronic traffic jams in the Greater Kampala Metropolitan Area.

The Government of Uganda accepted the recommendation of the study and through the Uganda National Roads Authority (UNRA), engaged Nippon Koei in a joint venture with Eighth Japan Engineering Company (EJEC) and Infra Consulting Services Limited (ICS) to carry out the detailed design and tender assistance of the Kampala Flyover Project. The project (Jinja Road – Mukwano Road – Queen's Way) is funded by the Ugandan government, with financing from JICA.

Construction

The first phase of this project is expected to begin in 2018, once a contractor has been selected. The work is budgeted at US$148 to US$200 million (depending on sources), borrowed from the Government of Japan, through the Japan International Cooperation Agency.

On 19 December 2018, construction of this project was flagged off by Yoweri Museveni, Uganda's president. The first phase is budgeted at USh300 billion (US$82 million).

See also

References

  1. ^ Etukuri, Charles (21 September 2017). "Kampala Flyover to solve traffic jam". New Vision. Kampala. Retrieved 10 February 2018.
  2. Globefeed.com (10 February 2018). "Distance between Clock Tower, Kampala, Uganda and Wampewo Avenue, Kampala, Uganda". Globefeed.com. Retrieved 10 February 2018.
  3. ^ ICS Global (2015). "Kampala Flyover Project". Reading, UK: Infra Consulting Services Limited (ICS Global). Retrieved 10 February 2018.
  4. Aine, Kim (11 October 2016). "Photos: UNRA To Start Work on $147 million Kampala Flyover Project". Kampala: Chimpreports.com. Retrieved 10 February 2018.
  5. Mark Keith Muhumuza (12 January 2017). "Government to start procurement for Kampala flyover projects". Daily Monitor. Kampala. Retrieved 10 February 2018.
  6. ABCAfrica Reporter (10 July 2017). "UNRA unveils Kampala Kitgum House Flyover". ABCAfricanews.com. Kampala. Retrieved 10 February 2018.
  7. New Vision Staff (19 December 2018). "Museveni launches Kampala fly-over project". New Vision. Kampala. Retrieved 20 December 2018.

External links

00°18′26″N 32°34′44″E / 0.30722°N 32.57889°E / 0.30722; 32.57889

Kampala District
Capital: Kampala
Divisions
Neighborhoods
Banking
  • Bank of Uganda
  • Uganda Deposit Protection Fund
  • ABC Bank (Uganda)
  • Absa Bank Uganda Limited
  • Bank of Africa Uganda Limited
  • Bank of Baroda Uganda Limited
  • Bank of India (Uganda)
  • DFCU Group
  • Cairo Bank Uganda
  • Centenary Bank
  • Citibank
  • DFCU Bank
  • Diamond Trust Bank
  • Ecobank
  • Equity Bank
  • Exim Bank (Uganda)
  • Finance Trust Bank
  • Guaranty Trust Bank
  • Housing Finance Bank
  • I&M Bank Uganda
  • KCB Bank Uganda Limited
  • NCBA Bank Uganda
  • Opportunity Bank Uganda Limited
  • PostBank Uganda
  • Salaam Bank Uganda
  • Stanbic Bank Uganda Limited
  • Standard Chartered Uganda
  • Tropical Bank
  • United Bank for Africa
  • East African Development Bank
  • Uganda Development Bank
  • Pride Microfinance Limited
  • FINCA Uganda Limited
  • UGAFODE Microfinance Limited
  • Exodus Sacco
  • Yako Bank Uganda Limited
  • Letshego Microfinance Uganda
  • Industry
    Media
    Information technology
    Economy
    Transport
    Energy
    Notable
    landmarks
    Education
    Health
    Legal
    Environment
    Notable people
    Categories: