(Redirected from Kaniv Hydroelectric Station) Hydroelectric power plant on the Dnieper in Kaniv, Ukraine Dam in Kaniv, Ukraine
Kaniv Hydroelectric Power Plant
The dam of Kaniv Hydroelectric Power Plant
Kaniv Hydroelectric Power Plant is located in Cherkasy OblastKaniv Hydroelectric Power PlantLocation of Kaniv Hydroelectric Power Plant in Cherkasy Oblast
LocationKaniv, Ukraine
Coordinates49°45′59.5″N 31°28′18.2″E / 49.766528°N 31.471722°E / 49.766528; 31.471722
Construction began1964
Opening dateNovember 4, 1972 (first turbine) – April 16, 1975 (completion)
Owner(s)Government of Ukraine
Dam and spillways
Type of dampower plant
ImpoundsDnieper River
Height39.5 m (130 ft)
Length343 m (1,125 ft)
Spillway capacity13,200 m/s (466,154 cu ft/s)
Reservoir
Creates(Run-of-river)
Total capacity2.6 km (2,107,854 acre⋅ft)
Power Station
Operator(s)Ukrhydroenergo
Turbines24 x 18.5 MW
Installed capacity444 MW
Annual generation972 GWh

Kaniv Hydroelectric Power Plant is a hydroelectricity generating complex on the Dnieper river in Kaniv, Ukraine. It is operated by Ukrhydroenego, a subsidiary of the state-owned Energy Company of Ukraine. The dam has a 288 by 18 metres (945 ft × 59 ft) single-stage, single chamber lock to enable travel along the Dnieper river.

History

Planning for the power plant's facilities was conducted by UkrHydroProject, a department of the Ukrainian State Research and Project Institute. Construction was contracted out to specialized construction companies, lasting from 1964 to 1972. The plant's turbines and generators were produced by the Kharkiv branches of Turboatom and Elektrovazhmash, respectively.

Renovation of the Kaniv Hydroelectric Power Plant started in 1997. The first stage of renovation was financed through the IBRD, completing in June 2002. The second stage was financed by the Ukrainian government, supplemented by a US$106 million investment by the World Bank, completing in 2017.

See also

References

  1. "Канівська ГЕС: історія та перспективи". Укргідроенерго (in Ukrainian). Retrieved 2024-07-18.

External links

Dnieper River
Tributaries Map of the drainage basin of the Dnieper
Reservoirs
Hydroelectric
stations
Canals
Cities
Crossings
Crossings of the Dnieper River
Upstream
Pivdennyi Bridge
E40
Kaniv Hydroelectric Power Plant
P09
Downstream
Cherkasy Bridge
H16
Stub icon

This industry-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: