(Redirected from Kastelli Airport) Airport in Crete, Greece
Kasteli Airport
Αεροδρόμιο Καστελίου
View from the east
Summary
Airport typeMilitary
OperatorHellenic Air Force
ServesHeraklion
LocationKasteli, Heraklion, Crete, Greece
Built1940; 84 years ago (1940)
Elevation AMSL360 m / 1,180 ft
Coordinates35°11′36.40″N 25°19′41.10″E / 35.1934444°N 25.3280833°E / 35.1934444; 25.3280833
Websitewww.heraklion-airport.gr/en/the-new-airport
Map
LGTL is located in GreeceLGTLLGTLLocation in Greece
Runways
Direction Length Surface
m ft
02/20 2,991 9,813 Asphalt
Source: AIP Greece, SkyVector

Kasteli International Airport (ICAO: LGTL) — also known as the New International Airport of Heraklion, Crete (Νέος Διεθνής Αερολιμένας Ηρακλείου Κρήτης) — is an international airport under construction on the Greek island of Crete. Located in Kasteli, 39 km (24 mi) southeast of Heraklion, this new airport will replace the existing Heraklion International Airport and is expected to open by 2027. Kasteli Hellenic Air Force Base currently operates at this location as a military facility for the Hellenic Air Force, housing F-16 Fighting Falcon fighter aircraft from the 133 Combat Group.

Initially, the new airport will have the capacity to handle nine million local and international passengers per year, with a maximum handling capacity of 18 million passengers annually. The foundation laying ceremony for the project was held in February 2020, marking the official start of construction. The Ariadne Airport Group consortium, which includes GEK Terna in partnership with the Indian GMR Group, is developing, and will operate and manage the new international airport on this site. The airbase will continue to function adjacent to the new airport.

The airport currently features a single operational runway measuring 2,991 m (9,813 ft). A 3,800 m (12,467 ft) runway, capable of handling commercial aircraft such as the Airbus A380, will be built 450 m parallel to the existing military runway.

History as an Air Force Base

Kastelli Airbase was established in November 1940, shortly after the onset of World War II in Greece. Initially constructed by British and Greek technicians, the taxiway was destroyed prior to the Battle of Crete. Following the German occupation in June 1941, the airbase was reconstructed, and a squadron of reconnaissance aircraft was established, using forced labour from the local population. Between 1941 and 1943, the base conducted 200 to 440 sorties per day for German reconnaissance and supply missions to North Africa.

Major Anders Lassen

On 4th July 1943, a British Special Air Service (SAS) raiding party led by Danish military officer Anders Lassen attacked Kastelli Airfield to divert German attention during the Allies' preparations for the invasion of Sicily. The raiders marched over sixty miles across Crete, successfully placing explosives on multiple aircraft before retreating under heavy fire.

After the liberation of Crete in November 1944, the airbase operated as the Air Detachment of the Hellenic Air Force's 115 Combat Wing. From March 1951 to November 1952, the Airforce Construction Unit (MAK) carried out reconstruction and modernisation. In November 1968, the unit became part of the 126 Combat Group.

In July 1974, it was renamed the 133 Combat Group and came under the Hellenic Tactical Air Force Headquarters. It became an independent unit in July 1978, primarily hosting F-84, A-7, and F-4 aircraft until 1986. From June 1995 to 1997, the 206 Air Force Infrastructure Wing oversaw the upgrade of the runway and other facilities at the airbase. Today, Kasteli Airbase operates with F-16 aircraft in the Hellenic Air Force.

The airbase remains active and will continue to function adjacent to the newly constructed airport.

Establishment as a Civilian Airport

Background

The idea for a civilian airport at Kastelli was first introduced in 1986 by then-Prime Minister Andreas Papandreou. Severe overcrowding at Heraklion International Airport has long been an issue for the existing airport, which has operated at 60% over its designed capacity during peak summer months. From 2015 to 2019, the airport handled between 6.1 and 8.1 million passengers annually, consistently exceeding its original design capacity. This has led to dissatisfaction among travellers, with the current airport being ranked among the worst airports in Europe. Strain on its facilities, along with the airport's proximity 5 km (3.1 mi) east of central Heraklion restricts expansion options of the existing airport.

In 2016, the Greek government officially tendered the construction of a relocated Heraklion airport adjacent to Kastelli Air Force Base to address the capacity and expansion issues. The new location almost 40 km from Heraklion, allows for a longer runway, a commercial cone, and a larger passenger terminal designed to accommodate 10-18 million passengers annually.

Planning

It is planned that the new airport will be situated on the southwestern side of Kasteli Hellenic Air Force Base, from which the air force currently operates F-16 Fighting Falcon jet fighters. The idea was first proposed in 1986 by then-Prime Minister Andreas Papandreou. The project has officially entered the implementation phase, and tenders have been invited. The new airport was planned to become operational in 2014. The existing airport at Heraklion will be closed and an area of 278 ha (690 acres) there will be returned to local communities for a large urban regeneration plan.

Visualisation of the new airport

The creation of the new airport will require new road, water and sanitation works, as well as the transfer of settlements located within the proposed runway zone (Archangelos, Roussochoria). The construction of a 17 km (11 mi) road will connect the airport with the A90 motorway along the north coast of Crete, in the neighbourhood of Chersonissos. When finished, the distance from the city of Heraklion to the new airport will be approximately 40 km (25 mi). Complaints have been filed for lack of a new road linking the new airport to the south coast of Crete.

The new airport will be constructed over an area of 600 ha (1,500 acres), adjacent to the current military airport in Kasteli. It will have a runway 3,800 m (12,500 ft) long to accommodate larger aircraft than can presently be operated into Heraklion airport. An additional area of 22 hectares (54 acres) is reserved for commercial activity south-west of the new airport. This is a very large project with a budget of €1.2 billion for construction costs alone, and together with purchase costs including loans and other expenses, will reach €1.5 billion.

Initially, four candidates had appeared for the Kasteli airport construction and management project, from Greece, China, France and Spain.

However, the Ariadne Airport Group consortium was declared the provisional winner of the international tender in May 2017. Ariadne is a joint venture formed by Greece-based Terna and New Delhi-headquartered GMR Airports. According to the Greek Secretary General of the Ministry of Infrastructure and Transport, Mr. Giorgos Dedes, €10 million have been approved for expropriations and the contract for the airport has been approved by the Court of Auditors, so that infrastructure works can begin in January 2019, even if there are great concerns about the environmental pollution from airplane fumes to the underground water deposits that provide water to 1/4 of the city of Heraklion. On February 21, 2019, the Ministry of Infrastructure and Transport signed a concession allowing the Greek-Indian Ariadne Airport Group consortium to build the airport. The concession needs clearance from Parliament and competition authorities before construction begins. In May 2019, the Parliament approved by a wide majority the necessary legislation, ratifying the concessions contract.

Construction

The airport terminal under construction in 2023

The construction phase of the airport commenced in February 2020 after Greek Prime Minister Kyriakos Mitsotakis laid the foundation stone. Under the concession agreement, the construction of the airport is set to last a total of 60 months (i.e., 5 years) until 2025. Due to the impact COVID-19 pandemic had on the construction timeline, the commencement of operations was pushed back to late 2027 or early 2028. According to the latest revisions of the master plan, the airport is to have a 94,000 square meter terminal, 10 passenger boarding bridges, 19 boarding gates and an initial capacity of 11 million passengers per year.

In June 2024, construction crew discovered an ancient Minoan architectural ensemble on the top of Papoura Hill where a radar system was planned to be built. After meeting with Greece’s Culture Ministry, planners decided to prioritize the excavation and protection of the ancient structure while concurrently continuing airport construction in other areas.

See also

References

  1. "AD 1.6.11 KASTELI" (PDF). eaip.austrocontrol.at. Archived from the original (PDF) on 17 August 2016. Retrieved 7 June 2016.
  2. "Kasteli Airport". skyvector.com. Retrieved 21 April 2019.
  3. "Building a greenfield airport when the COVID-19 crisis strikes: Determining recovery strategies". Heraklion Airport. Retrieved 2024-09-14.
  4. "Kasteli Airport Deal Signed, Project Ready to Take Off". GTP Headlines. 2019-02-22. Retrieved 2020-01-10.
  5. "Kastelli International Airport". Airport Technology. Retrieved 2024-09-14.
  6. "GMR Infra to develop new airport in Crete island". The Hindu Business Line. 7 June 2017. Retrieved 7 June 2017.
  7. ^ "Kastelli International Airport". Airport Technology. Retrieved 2024-09-14.
  8. "Kastelli International Airport". Airport Technology. Retrieved 2024-09-14.
  9. "133 Combat Group". Hellenic Air Force General Staff.
  10. Cherrett, Martin. "The SAS attack Kasteli airfield". www.ww2today.com. Retrieved 2024-09-14.
  11. "206 Air Force Infrastructure Wing". Hellenic Air Force General Staff.
  12. Dubois, Luc (2009-02-25). "Cretan Chronicles". Oriste. Retrieved 2024-09-14.
  13. Room, Press (2024-07-15). "Heraklion airport: New passenger record in overcrowded infrastructure". BnB News. Retrieved 2024-09-14.
  14. Kowalenko, Charlie (2024-09-06). "Heraklion Airport in Crete Ranked as Europe's Worst in 2024 Airport Study". Greek City Times.
  15. "The best and worst airports in Europe - Falstaff". www.falstaff.com. Retrieved 2024-09-14.
  16. "Building a greenfield airport when the COVID-19 crisis strikes". International Airport Review. Retrieved 2024-09-14.
  17. "Kasteli takes off in Crete | ITRANSPORTE". Retrieved 2024-09-14.
  18. Cretan Chronicles blog
  19. "Greece pushes back deadline for Kasteli airport bids to May 6". www.ekathimerini.com. Retrieved 8 June 2016.
  20. "Tender looms for new airport on Crete". www.naftemporiki.gr. 28 March 2016. Retrieved 8 June 2016.
  21. Dionellis, Marios (2018-07-22). "Προσοχή, αεροδρόμιο στο Καστέλλι!". Η Εφημερίδα των Συντακτών (in Greek). Archived from the original on 2019-02-23.
  22. "The Kasteli Airport Project Rolls Out in January 2019". www.argophilia.com. 11 December 2018. Retrieved 24 December 2018.
  23. "Greece signs concession for new Crete airport". www.reuters.com. 21 February 2019. Retrieved 21 February 2019.
  24. Kokkinidis, Tasos. "Greek Parliament Approves Construction of New International Airport on Crete". greekreporter.com. Retrieved 14 May 2019.
  25. "Crete to Get New Airport: Works at Kastelli Begin". GTP Headlines. 11 February 2020. Retrieved 4 May 2021.
  26. "Crete's New Heraklion Airport to Become Mediterranean Hub". GTP Headlines. 27 January 2023.
  27. "2023: New year, new challenges Airport Heraklion Crete". International Airport Review.
  28. "4,000-year-old Greek hilltop site mystifies archaeologists. It could spell trouble for new airport". AP News. 2024-06-11. Retrieved 2024-06-12.
Portals:
Airports in Greece
Major international
Minor international
Domestic
Military
Under construction
Defunct
Statistics