Misplaced Pages

Kenya–Uganda–Rwanda Petroleum Products Pipeline

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Kenya–Uganda–Rwanda Petroleum Products Pipeline
East AfricaMap of Kenya–Uganda–Rwanda Petroleum Products Pipeline
Location
CountryKenya
Uganda
Rwanda
Coordinates01°33′00″N 31°09′36″E / 1.55000°N 31.16000°E / 1.55000; 31.16000
General directionEast to West
FromMombasa, Kenya
Passes throughKampala, Uganda
ToKigali, Rwanda
General information
TypeOil products
PartnersKenya
Uganda
Rwanda
Commissioned2030 (Expected)
Technical information
Length1,100 mi (1,800 km)

The Kenya–Uganda–Rwanda Petroleum Products Pipeline is a pipeline that carries refined petroleum products from the Kenyan port city of Mombasa to the country's capital of Nairobi and continues to the city of Eldoret in the Eastern Rift Valley. There are plans to extend the pipeline to Uganda's capital, Kampala, continuing on to Rwanda's capital, Kigali.

Location

The pipeline originates in the Indian Ocean port of Mombasa and travels to Nairobi, continuing to Eldoret. That part of the pipeline is in existence as of May 2014.

It has been proposed that the pipeline be extended to Kigali, Rwanda, through Kampala, Uganda. The route of the pipeline, as proposed, stretches over a distance of approximately 1,800 kilometres (1,100 mi).

Background

The pipeline extension will connect Eldoret in Kenya to Kampala in Uganda, passing through Malaba. The pipeline will extend to Kigali in Rwanda and possibly to Bujumbura, Burundi in the future. Each country will be responsible for developing the infrastructure within its borders; however, a joint "transaction advisor" will be selected to maintain quality control.

Construction

The feasibility study for the Eldoret to Kampala pipeline extension was awarded to an international firm in 1997. The study was completed in 1998, and the report was submitted the following year. The study was funded by the European Investment Bank. The report indicated that building the pipeline was feasible. The feasibility study for the Kampala to Kigali extension was awarded to the East African Community in September 2011, funded with $600,000 from the African Development Bank. The governments of Kenya, Uganda, and Rwanda accepted the findings of both feasibility studies.

The construction contract was initially awarded, in 2007, to Tamoil, a company owned by the government of Libya. That contract was voided in 2012 after the company failed to implement the project. As of April 2014, fourteen companies have submitted bids to construct the pipeline extension from Kenya to Rwanda. Construction was expected to begin in 2014, with a 32-month construction timeframe. Commissioning was expected in 2016.

Construction costs

The total construction cost for the Eldoret-Kampala-Kigali portion of the pipeline is estimated at approximately US$5 billion. In November 2014, the International Finance Corporation, an arm of the World Bank, pledged to lend US$600 million towards the construction of the Eldoret-Kampala section of the project.

Developments

In May 2024, the presidents of Kenya and Uganda jointly agreed to extend this pipeline from Eldoret in Kenya to Kampala in Uganda. The first meeting to plan this extension was convened in Nairobi, Kenya between Kenyan and Ugandan authorities, in July 2024. The same intention was re-stated in December 2024 by representatives of the governments of Rwanda, Uganda and Kenya who met in Entebbe, Uganda.

See also

References

  1. Biryabarema, Elias (25 June 2013). "Uganda Agrees to Plan for Oil Pipeline to New Kenya Port". Reuters. Retrieved 9 April 2014.
  2. ^ Martin Mwita (25 July 2024). "Kenya-Uganda Kick Off Kampala Pipeline Extension Plan". The Star (Kenya). Nairobi, Kenya. Retrieved 25 July 2024.
  3. Administrator (31 October 2013). "Rwanda Sets EAC Pace". The Independent (Uganda). Archived from the original on 13 May 2014. Retrieved 9 May 2014.
  4. Momo Muthoki (3 May 2014). "East Africa Leaders Agree On Key Infrastructure Projects". The EastAfrican. Nairobi, Kenya. Retrieved 9 May 2014.
  5. ^ "Kenya-Uganda Oil Pipeline, Kenya". Hydrocarbons-Technology.com. Retrieved 10 April 2014.
  6. Irungu, Geoffrey (29 October 2014). "World Bank Arm To Give US$600 Million for Regional Oil Pipeline". The EastAfrican. Nairobi. Retrieved 2 November 2014.
  7. "Kenya, Uganda to extend oil pipeline from Eldoret to Kampala" (The EastAfrican Quoting Daily Nation). The EastAfrican. Nairobi, Kenya. 16 May 2024. Retrieved 22 May 2024.
  8. Samson Waswa (7 August 2024). "Kenya, Uganda in talks to extend petroleum pipeline from Eldoret to Kampala". Pulse Uganda. Kampala, Uganda. Retrieved 8 August 2024.
  9. Martin Mwita (13 December 2024). "Member states commit to Eldoret-Kampala-Kigali refined petroleum pipeline". The Star (Kenya). Nairobi, Kenya. Retrieved 19 December 2024.

External links

Categories: