Misplaced Pages

HSL 3

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from LGV 3) High-speed railway in Belgium
This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.
Find sources: "HSL 3" – news · newspapers · books · scholar · JSTOR (January 2021)
HSL 3
Overview
StatusIn operation
OwnerInfrabel
LocaleBelgium
Termini
Stations0
Service
TypeHigh Speed Rail
SystemBelgian HSL
Operator(s)Thalys, ICE
Rolling stockThalys PBKA, ICE 3M
History
Opened14 June 2009
Technical
Line length42 km (26 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV, 50 Hz AC
Operating speed260 km/h (160 mph)
Route map

Legend
km
Line 37 to Liège-Guillemins enlarge…
0.0 Angleur
Line 37 to Verviers-Central enlarge…
Vesdre River
Soumagne Tunnel (
6.53 km
4.06 mi
)
Line 37 enlarge…
Left arrow Line 49 EupenWelkenraedt Right arrow
Line 37 to Verviers-Central enlarge…
44.5 Hergenrath
Line 37 to Aachen enlarge…
This diagram:

The HSL 3 (Dutch: Hogesnelheidslijn 3, English: High-Speed Line 3, French: LGV 3, ligne à grande vitesse 3) is a Belgian high-speed rail line. It connects Liège to the German border near Aachen. The high-speed track length is 42 km (26 mi).

The line was technically completed in October 2007; however, it did not come into operation until 14 June 2009, when ICE trains began service. Thalys trains have been using the line since 13 December 2009. The interval between completion of the line and its actual use was due to difficulties in the implementation of the safety system ETCS level 2, specifically, finding trains with ERTMS fitted.

Together with the HSL 2 between Louvain and Liège and HSL 1 between Brussels and the French border, the combined eastward high-speed line has greatly reduced journey times between Brussels, Paris and Germany. HSL 3 has cut LiègeCologne journey times from 1 h 23 min to 1 h 1 min. HSL 3 is used only by international high-speed trains (Thalys, now Eurostar; and ICE), as opposed to HSL 2, which is also used for fast internal InterCity services.

Route

Belgian high speed network.

Trains leave the reconstructed Liège-Guillemins station over the upgraded classic line, at speeds which progressively rise to 120 km/h (75 mph). The dedicated high-speed tracks branch off from the "slow" line at the bridge over the Ourthe, between Angleur and Chênée stations in the suburbs of Liège. The line crosses the Vesdre river, then traverses the 6.5 km (4.0 mi) long Soumagne Tunnel between Vaux-sous-Chèvremont [fr] and Soumagne. This is the longest double-track tunnel in Belgium, and has a speed limit of 200 km/h (120 mph).

The line then runs parallel to the A3 motorway with a speed limit of 260 km (160 mi) shortly after the village of Walhorn, it passes under the A3 in a cut-and-cover section, and rejoins the regular line. Trains run on the upgraded classic line 37 at 140 km/h (85 mph), pass over the Hammerbrücke viaduct (entirely reconstructed for the project), and cross the border 2 kilometres (1.2 mi) further on.

Beyond the border, high-speed trains travel along upgraded existing rail lines to Aachen Hauptbahnhof. Trains use left-hand running along this section (as in Belgium), switching over to right-hand running, which is common in Germany, at Aachen Hauptbahnhof.

Construction

Infrabel, the Belgian rail infrastructure manager, constructed the line through its subsidiary TUC Rail, who built the 36 kilometres (22 mi) line between 2001 and 2007 at a cost of €830m, including ETCS Level 2 signalling.

The most notable construction subproject is the 6.505-kilometre (4 mi 74 yd) long tunnel at Soumagne, which is the longest railway tunnel in Belgium. The bored section is 5.940 kilometres (3 mi 1,216 yd), extended by covered sections of respectively 177 metres (194 yd) and 388 metres (424 yd). Dozens of geological layers of differing hardness had to be tunnelled through, lime layers needing to be blasted through with dynamite. The tunnel reaches a depth of 127 metres (417 ft) in some areas; it has an average ramp height of 1.7%, with a maximum of 2% at the entrance in Soumagne. The free space profile in the tunnel is approximately 69 m (740 sq ft), which restricts speeds to 200 km/h (120 mph). The tunnel was built between 14 May 2001 and August 2005.

Gallery

  • Viaduct over the Ruyff valley. Viaduct over the Ruyff valley.
  • HSL 3 near Walhorn. HSL 3 near Walhorn.
  • Walhorn Tunnel West Portal Walhorn Tunnel West Portal
  • Walhorn Tunnel East Portal Walhorn Tunnel East Portal
  • Railway Bridge Hauset Railway Bridge Hauset
  • HSL 3 near Baelen HSL 3 near Baelen

See also

References

  1. ^ Line 3 completes high speed network Archived 2012-06-04 at the Wayback Machine, Railway Gazette International 2009-06-15

External links

High-speed railway lines
Africa
Morocco
Asia
China
Indonesia
Japan
Saudi Arabia
South Korea
Taiwan
Turkey
Uzbekistan
Europe
Belgium
Denmark
Finland
France
Germany
Greece
Italy
Netherlands
Norway
PolandGrodzisk–Zawiercie*
Russia
Spain
SwedenBothnia Line
United Kingdom
North America
United StatesNortheast Corridor*
OceaniaNone
South AmericaNone
* An asterisk indicates overlap with conventional services.
Eurostar
Stations
Seasonal
Former
Lines
Rolling stock

Categories: