Lajoie Dam is the uppermost of the storage dams of BC Hydro's Bridge River Power Project, which is located in the southwestern Interior of British Columbia. It is located just west of the small semi-ghost town of Gold Bridge. An earthfill structure, it is 87 m (287 ft) and impounds c. 570,000 acre-feet (700,000,000 m) of water in Downton Lake Reservoir. The Lajoie Powerhouse generates 22 MW with an average generating capacity of 170 GWh/year. A few miles downstream is Carpenter Lake, which is formed by Terzaghi Dam, the largest of the Bridge River Power Project's structures.
Downton Reservoir is named for Geoffrey M. Downton, a pioneer surveyor who was the first to recognize the hydroelectric potential in the drop in elevation between the Bridge and Seton river systems. Lajoie Dam and Powerhouse are atop the site of Lajoie Falls, which was named after Lazack Lajoie, a local "mountain man" and entrepreneur-huckster who promoted a townsite and mining complex around Gun Lake which never came to fruition.
References
- Water Powers, British Columbia, BC Dept of Lands and Forests Water Rights Branch, Victoria 1954
External links
- BC Hydro Bridge River Development Rec Site
- Bridge River-Lillooet Archive Lajoie Dam page
- Aerial view of Downton Lake, looking west
- Aerial view of Lajoie Dam from overhead from Randall & Kat's Flying Photos
50°50′22″N 122°51′28″W / 50.83944°N 122.85778°W / 50.83944; -122.85778
This article about a building or structure in British Columbia is a stub. You can help Misplaced Pages by expanding it. |
This article about a Canadian power station is a stub. You can help Misplaced Pages by expanding it. |