Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
VNSLocation of airport in Uttar PradeshShow map of Uttar PradeshVNSVNS (India)Show map of IndiaVNSVNS (South Asia)Show map of South AsiaVNSVNS (Middle East)Show map of Middle EastVNSVNS (Asia)Show map of Asia
An integrated terminal serves both domestic and international flights, with a floor area of 3,900 square metres (42,000 square feet). The terminal features 16 check-in counters with CUTE (common-user terminal equipment), four immigration counters that double up as emigration counters, and two baggage-claim belts. Besides an upper-level seating area for the aero-bridge gates, the terminal features a ground-level gate to reach other aircraft on the apron on foot, or via shuttle bus. The apron can simultaneously park five narrow-body aircraft. The waiting area features essential services for the passengers, besides snack stalls, a travellers' convenience store, a bookstore with a newsstand, and stores selling merchandise indigenous to Varanasi, such as Banarasi Saris; and a VIP waiting lounge.
Airfield
The airport features a single asphalt runway bearing 09/27. It is 9,006 feet (2,745 m) in length, with turnarounds on both ends, and two exits to the main apron. A third, seldom-used exit leads to an isolated apron for use in emergency.
Due to increasing passenger traffic and aircraft movements the Airports Authority of India is planning to extend the runway to 4,075 m (13,369 ft) from the existing 2,750 m (9,020 ft). An underpass will be constructed as the expansion will intersect with National Highway 31.
In November 2019, the Airports Authority of India came up with a proposal for a new second terminal, which will be completed by 2024. The total area of the terminal will be 58,691 m with passenger capacity of 4.5 million per year.
On 20 October 2024, Prime Minister Narendra Modi laid the foundation stone for several projects at the Airport, including the expansion of the airport runway, a new terminal building, and other allied works, totalling around ₹2,870 crore.
"Varanasi Airport renamed". Press Information Bureau, Government of India. 20 October 2005.. It acquired its position in India's major airports after more than 1.5 million passengers used the airport in 2017.