Misplaced Pages

Leipzig–Probstzella railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Leipzig–Gera–Saalfeld railway) German railway line
Leipzig-Leutzsch–Probstzella railway
Overview
Line number6383
LocaleSaxony, Saxony-Anhalt and Thuringia, Germany
Service
Route number
  • 550 (Leipzig–Gera)
  • 555 (Gera–Saalfeld)
  • 557 (Saalfeld–Hockeroda)
  • 558 (Gera–Weida)
  • 840 (Saalfeld–Probstzella)
Technical
Line length159.97 km (99.40 mi)
Number of tracks
  • 2: Leipzig-Leutzsch–Zeitz
  • 2: Gera Hbf–Gera-Zwötzen
  • 2: Unterwellenborn–Probstzella
Electrification15 kV/16.7 Hz AC catenary (Leipzig-Leutzsch–Leipzig-Plagwitz and Saalfeld–Probstzella)
Operating speed120 km/h (74.6 mph) (maximum)
Route map

Legend
from Leipzig Hbf
from Leipzig-Wahren
7.385 Leipzig-Leutzsch
to Großkorbetha
8.200
Leipzig-Industriegelände West
(until 2011)
10.113 Leipzig-Lindenau
from Leipzig-Connewitz
10.760 Leipzig-Plagwitz
Lindenau Ldst–Leipzig-Plagwitz Industriebf
to Leipzig-Miltitzer Allee
to Pörsten
to Markkleeberg-Gaschwitz
13.750 Leipzig-Großzschocher
16.368 Leipzig-Knauthain
New alignment due to Zwenkau lignite mine
21.041 Knautnaundorf
21.480 Eythra
22.233
21.200
km change +1,033 km
24.666 Groß Dalzig
27.900 Zauschwitz siding
to Neukieritzsch
29.897 Pegau
SaxonySaxony-Anhalt state border
34.217 Profen
37.328 Reuden (Kr Zeitz)
39.500 Bornitz (b Zeitz) (until 2010)
from Tröglitz
41.691 Zeitz junction Zn
from Weißenfels
from Altenburg
44.660 Zeitz
to Camburg
Camburg–Zeitz
50.558 Haynsburg
55.022 Wetterzeube
Saxony-AnhaltThuringia state border
59.970 Crossen an der Elster Ort
60.921 Crossen an der Elster
to Porstendorf
White Elster
66.336 Bad Köstritz
68.477 Gera-Langenberg
from Weimar
71.300 Gera-Tinz
72.925 Gera Hbf
74.538 Gera Süd
75.381 Gera-Debschwitz siding
to Gößnitz and formerly to Weischlitz
76.890 Gera-Zwötzen
White Elster
Wolfsgefärth siding (since 2016)
79.790
Gera-Röppisch
formerly Wolfsgefärth (until 2000)
to Weischlitz (1875–1892, since 2016)
81.000 Wolfsgefärth
from Werdau
84.954 Weida
to Mehltheuer
from Münchenbernsdorf
93.635 Niederpöllnitz
100.470 Triptis
to Marxgrün
Orla
104.400 Traun (until 2011)
108.920 Neustadt (Orla)
112.229 Neunhofen
Orla
Orla
Harrasmühlen Tunnel (117 m)
117.541 Oppurg
to Orlamünde
122.441 Pößneck ob Bf
126.186 Krölpa-Ranis
130.650 Könitz (Thür)
134.533 Unterwellenborn
from Großheringen
from Arnstadt
140.010 Saalfeld (Saale) 211 m
Saale bridge, Breternitz (114 m)
145.814 Breternitz 216 m
149.861 Kaulsdorf (Saale) (former station) 229 m
until 1954 Eichicht
152.072
Hp Abzw Hockeroda
(former station)
258 m
to Unterlemnitz
155.762 Unterloquitz 280 m
160.960 Marktgölitz (until 2010) 310 m
to Sonneberg (connecting curve)
from Sonneberg
164.981 Probstzella 365 m
166.666 Thuringia / Bavaria state border
to Hochstadt-Marktzeuln
Source: German railway atlas

The Leipzig–Probstzella railway is a line in the German states of Saxony, Saxony-Anhalt and Thuringia. It runs from Leipzig through the valley of the White Elster via Zeitz, Gera, Triptis, the Orlasenke lowland and Saalfeld to Probstzella. Since it runs parallel with the Saal Railway but is higher, it is also called the Obere Bahn ("upper railway").

Route

Gera Hauptbahnhof
Southern section of the route

The line begins in Leipzig Leutzsch and runs south from the city. The line then runs through the flat Leipzig Bay along the Elster through the former central German lignite mining area. This section of the line was once used to transport lignite to nearby power plants, but this traffic has declined considerably.

The line reaches Zeitz at the southern edge of the lowlands, where it connects with other lines, although some of the network has been closed since 1990. The hills on either side of the White Elster south of Zeitz are steeper. Near Ahlendorf (the administrative centre of Heideland-Elstertal), the line crosses the border between Saxony-Anhalt and Thuringia. The line now runs on a long curve through the communities of Crossen an der Elster and the brewery town of Bad Köstritz to Gera, where it meets several other lines. Until 1998, the Crossen–Porstendorf line ran from Crossen an der Elster station via Eisenberg and Bürgel to Porstendorf (north of Jena).

The line runs to the south from Gera Hauptbahnhof. Once out of the city it runs along the banks of the White Elster before running along the valley of the Weida. To the west of the town of Weida the line crosses a crest on the approach to Triptis at an altitude of about 375 metres above sea level. The line now runs through the Orlasenke lowland and continues on a straight path to the south-west through the town of Neustadt an der Orla, continuing to Oppurg, where until 1944 the Orla Railway branched off towards Pößneck unterer (lower) station and Orlamünde. It then runs through Pößneck ober (upper) station to Saalfeld, where it connects with the Saal Railway, which links Berlin and Munich.

History

The second quarter of the line was opened in 1859. At that time, a line was built from Weißenfels (connecting there with the Thuringian Railway opened in 1846) via Zeitz to Gera. It was the first line to Gera, which was capital of the Principality of Reuss Younger Line and had about 14,000 inhabitants at that time.

The northern section of the line between Zeitz and Leipzig traffic was opened in 1873. Until the completion of the connecting curve between the Thuringian railway and the Saal Railway at Großheringen in 1900, it was the most important link between Prussia and Bavaria, except for the Saxon-Bavarian Railway. Although the curve at Großheringen meant that the Saal Railway was 25 km shorter, the north–south connection (Nord-Süd-Verbindung) through Gera continued to be used as a long-distance line from Leipzig in the north to Nuremberg in the south.

The section from Gera to Eichicht (now part of Kaulsdorf) was opened on 20 December 1871. It was of great importance for the nearby towns. It allowed the textile industry in the Orlasenke, especially in Pößneck, to grow rapidly before the First World War. Pößneck thus became a centre of the Thuringian textile industry along with Apolda and Greiz. Also of importance to this section was the former Maxhütte steel and rolling mill in Unterwellenborn as well as the steel works, now known as the Thuringian Steelworks (Stahlwerk Thüringen). The line built in 1871 ran through the following states (starting in Gera): Reuss Younger Line, Saxe-Weimar-Eisenach, Prussia, Saxe-Meiningen, Prussia, Schwarzburg-Rudolstadt and Sachsen-Meiningen. A temporary terminus was built in Eichicht as the route for the continuation of the line and connection to Bavaria was still unclear.

Before the Second World War the entire line was double track. In 1946 the second track was dismantled as reparations to the Soviet Union. The line at Knautnaundorf was realigned for the establishment of an open cut lignite mine under the East German regime.

The section from Saalfeld and Probstzella was electrified by 1939. Seven years later, all components of the electrification along with the second track were removed for reparations to the Soviet Union. Because of the division of Germany the line had little importance for the next four decades.

Double track has been restored on the sections between Leipzig Hauptbahnhof and Zeitz, between Gera Hauptbahnhof and Gera Süd and between Unterwellenborn and Probstzella. Electrification has been restored on the section between Saalfeld and Probstzella.

Operations until 2012

Regional-Express (RE) 12 services and Regionalbahn (RB) 51 services run between Leipzig and Gera. The RB and RE services both run every two hours, alternating with each other to create an hourly service. In addition, on Saturdays (during the summer timetable), a pair of RE trains run from Leipzig via Gera and Saalfeld to Blankenstein (Schiefergebirgs-Express) and to Katzhütte (Schwarzatal Express).

The Gera-Saalfeld section was served by RE 4 services between Gera and Saalfeld every two hours. In addition, RB services alternate with the RE services every two hours between the two cities. These are mostly operated by class 612 and class 642 diesel multiple units. Until 2012 all services had been operated by DB Regio.

Current operations

Since 2012, passenger services on the Leipzig–Zeitz–Gera–Saalfeld section are operated by Erfurter Bahn.

Since 15 December 2013 S-Bahn Mitteldeutschland trains use this line between Leipzig-Leutzsch and Leipzig-Plagwitz.

References

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. pp. 57–8, 68–9, 131. ISBN 978-3-89494-139-0.
  2. "Erfurter Bahn wird Ostthüringer Dieselnetz betreiben" (in German). Nahverkehrsservicegesellschaft Thüringen mbH. Retrieved 17 February 2011.

External links

Categories: