Misplaced Pages

Leipzig Anger-Crottendorf station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Railway station in Leipzig, Germany
Leipzig Anger-CrottendorfDeutsche Bahn
Hp
The new stop along Leipzig-Engelsdorf–Leipzig-Connewitz railway, which was opened on the 15th of December 2013
General information
LocationGüterring 2, Leipzig, Saxony
Germany
Coordinates51°19′57″N 12°25′13″E / 51.3326°N 12.4204°E / 51.3326; 12.4204
Line(s)
Platforms1
Tracks1
Other information
Station code146
DS100 codeLACF
IBNR8010008
Category6
Fare zoneMDV: 110
Websitewww.bahnhof.de
Services
Preceding station S-Bahn Mitteldeutschland Following station
Leipzig-Stötteritztowards Halle-Nietleben S 3 Leipzig-Engelsdorftowards Wurzen or Oschatz
Location
Leipzig Anger-Crottendorf is located in SaxonyLeipzig Anger-CrottendorfLeipzig Anger-CrottendorfLocation within SaxonyShow map of SaxonyLeipzig Anger-Crottendorf is located in GermanyLeipzig Anger-CrottendorfLeipzig Anger-CrottendorfLocation within GermanyShow map of GermanyLeipzig Anger-Crottendorf is located in EuropeLeipzig Anger-CrottendorfLeipzig Anger-CrottendorfLocation within EuropeShow map of Europe

Leipzig Anger-Crottendorf is a railway station in the city of Leipzig, Germany. The station was located on the Leipzig Hbf–Leipzig-Connewitz railway until its closure in November 2012. As part of City Tunnel network enhancements it was rebuilt thereafter a few meters east at the Leipzig-Engelsdorf–Leipzig-Stötteritz section of the Leipzig Freight Ring and reopened along with Leipzig City Tunnel on 15 December 2013. The station is served by the S-Bahn Mitteldeutschland since then, train services are operated by Deutsche Bahn.

Reconstruction since 2019

Since 2019 the station has been under reconstruction. Both platforms have been deconstructed and will be replaced by a new central platform. The bridges crossing Zweinaundorfer Straße are being rebuilt in shifted positions and the tracks will get a slightly different layout, in order to increase the speed limit from 60 to 80 km/h. During 2021 only one platform and one track is being operated. The project is planned to be completed in 2024.

  • Carcass of a passenger lift Carcass of a passenger lift
  • Train departing southbound Train departing southbound
  • new railway embankment new railway embankment
  • Oxyacetylene cutting to scrap one of the old railway bridges Oxyacetylene cutting to scrap one of the old railway bridges
  • noise barriers are installed noise barriers are installed

Train services

S-Bahn Mitteldeutschland services currently call at the station.

References

  1. ^ "Stationspreisliste 2025" [Station price list 2025] (PDF) (in German). DB Station&Service. 28 November 2024. Retrieved 5 December 2024.
  2. Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  3. "Tarifzonenplan" (PDF) (in German). Mitteldeutscher Verkehrsverbund GmbH. 1 August 2021. Retrieved 22 August 2021.
  4. "Open Data: Haltestellen im MDV" (CSV) (in German). Mitteldeutscher Verkehrsverbund GmbH. Retrieved 1 September 2024.
  5. "Leipzig Anger-Crottendorf | Deutsche Bahn AG". deutschebahn.com (in German). Deutsche Bahn AG. 2020-07-24. Archived from the original on 2020-08-23.
  6. Timetables for Leipzig Anger-Crottendorf station (in German)

External links

Category: