Asnières–Gennevilliers Les Courtilles | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Paris Métro station | |||||||||||
General information | |||||||||||
Location | Asnières-sur-Seine and Gennevilliers, Hauts-de-Seine Île-de-France France | ||||||||||
Coordinates | 48°55′50″N 2°17′02″E / 48.93056°N 2.28389°E / 48.93056; 2.28389 | ||||||||||
Owned by | RATP | ||||||||||
Operated by | RATP | ||||||||||
Line(s) | Line 13 | ||||||||||
Platforms | 2 | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 19-04 | ||||||||||
Fare zone | 3 | ||||||||||
History | |||||||||||
Opened | 14 June 2008 (2008-06-14) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Les Courtilles (French pronunciation: [le kuʁtij]) is the terminus of the northwestern branch of Line 13 of the Paris Métro.
Location
The station is located on the border of the municipalities of communes of Asnières-sur-Seine and Gennevilliers, at the intersection formed by the axis of the Avenue de la Redoute and Avenue Lucien-Lanternier on the one hand, and the axis Boulevard Pierre-de-Coubertin and Boulevard Intercommunal on the other hand. The name of each of these two towns can be found above the name of the station on the maps and in the station.
History
The station opened on 14 June 2008 upon completion of the extension of Line 13 from Gabriel Péri. Reversing sidings are provided to the north of the station for trains to change direction. In November 2012, Île-de-France tramway Line 1 was extended to the west to terminate at Les Courtilles.
In 2020, with the Covid-19 crisis, 2,194,218 passengers entered this station, which places it in 109th position among metro stations for its attendance.
A later extension of line 13 to Port de Gennevilliers, included in the Schéma directeur de la région Île-de-France (SDRIF) master plan and adopted in 2008 by the Regional Council of Île-de-France, is no longer envisaged. This project no longer appears in the new version of the SDRIF adopted on 25 October 2012.
Passenger services
As with all new metro stations built since 1992, the station is fully accessible.
Station layout
Street Level |
Mezzanine |
B2 | Side platform, doors will open on the right | |
Northbound | ← Alighting passengers only (toward depot) | |
Southbound | → toward Châtillon–Montrouge (Les Agnettes) → | |
Side platform, doors will open on the right |
Platforms
Les Courtilles is a standard configuration station with two platforms separated by metro tracks.
Other connections
The station is served by the T1 tramway (since 15 November 2012), lines 235, 238, 276, 304, 378 and Bus du Port of the RATP Bus Network, and at night, by the Noctilien line N51.
Nearby
- Port of Gennevilliers
- Stade Léo-Lagrange, in Asnières-sur-Seine
Gallery
See also
Notes
- ^ "Ligne 13 : deux nouvelles stations à Asnières-Gennevilliers" (in French). Conseil régional d'Île-de-France. Archived from the original on 21 February 2012. Retrieved 13 May 2009.
- "Trafic annuel entrant par station du réseau ferré 2020". data.ratp.fr (in French). Retrieved 2022-01-21.
References
- Roland, Gérard (2003). Stations de métro. D’Abbesses à Wagram. Éditions Bonneton.
Line 13 | |||||||
---|---|---|---|---|---|---|---|
Stations |
|