(Redirected from Line 10 (Delhi Metro)) Under construction line on the Delhi Metro system

It has been suggested that Brown Line (Delhi Metro) be merged into this article. (Discuss) Proposed since July 2024.
Golden Line
(Line 10)
Overview
StatusUnder construction
OwnerDelhi Metro
LocaleDelhi
Termini
Stations16
Elevated: 4
Underground: 12
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned openingMarch 2026; 1 year's time (2026-03)
Technical
Line length25.82 km (16.04 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Legend
Terminal 1-IGI Airport Indira_Gandhi_International_Airport#Terminal_1 Magenta Line
Delhi Aerocity Airport Express
Delhi–Gurgaon Expressway
Mahipalpur
Vasant Kunj
Kishangarh
Chhatarpur Yellow Line
NH148A-IN.svg NH 148A (Mehrauli-Gurgaon Highway)
Chhatarpur Mandir
IGNOU
Neb Sarai
Saket G-Block Brown Line
Ambedkar Nagar
Khanpur
Sangam Vihar-Tigri
Maa Anandmayee Marg
Pul Pehladpur
Indian Railways
Tughlakabad Station Tughlakabad railway station Violet Line
Sarita Vihar Depot

Legend
Violet Line
Lajpat Nagar
Pink Line
Andrews Ganj
Greater Kailash-1
Outer Ring Road
Chirag Delhi Magenta Line
Pushpa Bhawan
Saket District Centre
Pushp Vihar
Saket G Block Golden Line

The Golden Line (Line 10 & Line 11) is an under-construction rapid transit line of the Delhi Metro. It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. It will start from Terminal 1-IGI Airport, which was previously planned from Delhi Aerocity, and end in Tughlakabad. It will be 25.82 km (16.04 mi) long with 16 stations, out of which four will be elevated and 12 will be underground. Construction began on the line in June 2022, as part of the fourth phase of the Delhi Metro's development, and is expected to be completed by March 2026.

History

The Golden Line, initially named as Silver Line, was conceptualized by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about 104 km (65 mi) have been planned to be added to the metro network, out of which the Golden Line would cover southern Delhi at a length of 20.2 km (12.6 mi). The plans were finalized for implementation by the Government of Delhi in December 2018; this time the length of the Golden Line increased to 23.6 km (14.7 mi). In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Golden Line began from April 2019, and was completed by three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic. Hence, construction was started by Afcons Infrastructure and Larsen & Toubro in June 2022. It was expected to be completed by 2024/25, which has been extended to March 2026, as of January 2024.

In November 2020, the DMRC changed the alignment of the Golden Line as per the instructions of the Archaeological Survey of India (ASI) to circumvent the Qutb Minar and the Mehrauli Archaeological Park, so to avoid any harm to these critical historical sites during construction and operation. As per the initial plan, the line was proposed to be extended to Terminal 1 of Indira Gandhi International Airport, in order to provide commuters a faster and direct link to the airport's premises. The proposal was approved by the Government of Delhi after the DMRC created and showed a Detailed Project Report (DPR) in December 2023, thereby increasing the line's length to 25.82 km (16.04 mi). The name of the line was changed from 'Silver Line' to 'Golden Line' in January 2024.

Stations

Main article: List of Delhi Metro stations

The stations being built on the Golden Line are:

Main Line

Golden Line
# Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 Terminal 1 - IGI Airport आईजीआई एयरपोर्ट - टर्मिनल 1 4 2026 Magenta Line Underground Island None
2 Delhi Aerocity दिल्ली एरोसिटी Airport Express
3 Mahipalpur महिपालपुुर None Side
4 Vasant Kunj वसंत कुंज Vasant Kunj Depot At Grade
5 Kishangarh किशनगढ़ None
6 Chhatarpur छत्तरपुर Yellow Line
7 Chhatarpur Mandir छत्तरपुर मंदिर None Island
8 IGNOU इग्नू
9 Neb Sarai नेब सराय
10 Saket G-Block साकेत जी-ब्लॉक Golden Line
(Phase 4 - Proposed Branch)
Elevated Side
11 Ambedkar Nagar अम्बेडकर नगर None
12 Khanpur ख़ानपुर
13 Sangam Vihar - Tigri संगम विहार - तिगड़ी
14 Anandmayee Marg आनंदमयी मार्ग Underground Island
15 Pul Pehladpur पुल पहलादपुर
16 Tughlakabad Station तुग़लक़ाबाद स्टेशन Violet Line

Branch Line (formerly the Brown Line)

Golden Line Branch
# Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 Saket G-Block साकेत जी-ब्लॉक 4 2026 Golden Line
(Phase 4 - Under Construction)
Elevated Side None
2 Pushp Vihar पुष्प विहार 2029 None
3 Saket District Centre साकेत जिला केंद्र
4 Pushpa Bhawan पुष्पा भवन
5 Chirag Delhi चिराग दिल्ली Magenta Line
6 Greater Kailash-1 ग्रेटर कैलाश-१ None
7 Andrews Ganj एंड्रयूज़ गंज
8 Lajpat Nagar लाजपत नगर Pink Line
Violet Line

Project timeline

  • April 2019: Land acquisition begins for the Golden Line.
  • January 2024: The name of the line was changed to 'Golden Line' from 'Silver Line' by the DMRC. It is expected to be completed by March 2026.

Train Info

Golden Line
Rakes Alstom Metropolis
Train Length 6 coaches
Train Gauge 4 ft 8+1⁄2 in (1,435 mm) standard gauge
Electrification 25 kV 50 Hz AC through overhead catenary (OHE)
Train's Maximum Speed 100 km/h
Train Operation Delhi Metro

See also

Portals:

References

  1. ^ "Silver to Gold — Why Delhi Metro changed the colour code of this much awaited line". The Indian Express. 29 January 2024. Retrieved 29 January 2024.
  2. ^ "Delhi's Airport Metro set for silver line extension to terminal 1". Construction World. 12 January 2024. Retrieved 14 January 2024.
  3. ^ "Delhi: Covid, green concerns put Phase-IV in low gear; push targets back". The Times of India. 14 June 2022. Retrieved 16 June 2022.
  4. ^ "Afcons Begins Work on Delhi Metro Silver Line's Underground Section". The Metro Rail Guy. 15 June 2022. Retrieved 29 January 2024.
  5. ^ "DMRC changes colour code of upcoming Delhi Aerocity–Tughlakabad Metro corridor". The Statesman. 29 January 2024. Retrieved 29 January 2024.
  6. ^ "Delhi Metro steers clear of Qutub Minar". The Times of India. 2 December 2020. ISSN 0971-8257. Retrieved 20 December 2023.
  7. ^ "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 29 January 2024.
  8. ^ "Delhi Metro's Silver Line to Aerocity may be extended to terminal 1". The Times of India. 19 December 2023. ISSN 0971-8257. Retrieved 19 December 2023.
  9. "Good News For Air Travellers! Delhi Metro's Silver Line To Aerocity To Be Extended To Terminal 1". Times Now. 19 December 2023. Retrieved 19 December 2023.
  10. ^ "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 29 January 2024.
  11. "Delhi Metro map". www.delhimetrorail.com. Retrieved 21 April 2022.
  12. "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief". TimesNow. 5 November 2023. Retrieved 24 November 2023.
Delhi Metro
Lines
Red Line 1
Yellow Line 2
Blue Line 3/4
Main Line 3
Branch Line 4
Green Line 5
Main Line
Branch Line
Violet Line 6
Airport Express
Pink Line 7
Magenta line 8
Grey line 9
Delhi Metro stations
Golden Line
Depot(s)
  • Vasanth Kunj & Sarita Vihar (TBA)
Stations along operational lines that are denoted in italics have yet to open.
India Urban rail transit in India
Suburban
rail
Operational
Under
construction
Planned
Proposed
Rapid
transit
Operational
Under
construction
Planned
Proposed
Monorail
Operational
Planned
Proposed
Metrolite
Planned
Proposed
Tram
Operational
Defunct
Rapid transit in Asia
 Armenia
 Azerbaijan
 Bangladesh
 China (PRC)
 Georgia
 India
 Indonesia
 Iran
 Japan
 Kazakhstan
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.
Railways in Northern India
National network/
trunk lines
Branch lines/
sections
Urban and suburban
rail transport
Heritage railways
Monorails
Defunct lines
Manufacturing units
and workshops
Railway companies
See also
Category: