Misplaced Pages

Line 12 (Guangzhou Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro line in Guangzhou, China
Line 12
Overview
StatusUnder construction
LocaleGuangzhou, Guangdong, China
Termini
Stations25
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
History
Opened2025
Technical
Line length37.6 km (23.36 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Route map

Legend
Xunfenggang Stabling Yard (Line 6)
Xunfenggang  6 
Liheng Lu
Chenxiangsha Island
Baisha River
Chatou Depot
Chatou  13 
 13  Right arrow to Chaoyang
Julong  8 
 8 
Left arrow to Wanshengwei
to Jiaoxin Right arrow
Jingguang Railway
 24  Left arrow to Sun Yat-sen Memorial Hall
Connection to Line 24/  22  Up arrow to Panyu Square
Baiyun Railway Station  22   24  Foshan Metro  6 
Foshan Metro  6 
Left arrow to Baiyun Dongping
to Huanzhen Xilu Right arrow
Jingguang Railway /  22  Down arrow to Airport North (Terminal 2)
 24  Right arrow to Guangzhou North Railway Station
Nanhang Xincun
Xinshixu  14 
 14 
Left arrow to Guangzhou Railway Station
to Dongfeng Right arrow
Baiyun Culture Square  2 
 2 
Left arrow to Guangzhou South Railway Station
to Jiahewanggang Right arrow
Yunxi Park
Xiaojinzhong
Jingyun Lu
 11  Right arrow clockwise
Guangzhou University of
Chinese Medicine
 11 
 11  Left arrow anti-clockwise
Hengfu Lu
Guangshen Railway
(OSI to  5  Taojin/  5 
Left arrow to Jiaokou
to Wenchong Right arrow
)
Jianshe Liumalu  13 
 13  Right arrow to Xinsha
 1 
Left arrow to Xilang
to Guangzhou East Railway Station Right arrow
Martyrs' Park  1 
 10  Right arrow to Tianhe Coach Terminal
 6  Up arrow to Xiangxue
Donghu  6   10 
 10  Left arrow to Xilang
Ersha Island
Pearl River
 28  Left arrow to Luzhou
 3 
Left arrow to Panyu Square
to Tianhe Coach Terminal Right arrow
Lingnan Square  28 
 28  Right arrow to Songshanhu
Chigang  8 
 8 
Left arrow to Jiaoxin
to WanshengweiRight arrow
 18 
Left arrow to Wanqingsha
to XiancunRight arrow
Connection to Line 8
Qixinggang Chisha Depot(Line 11)
 11  Left arrow clockwise
Connection to Line 11
Chisha  11 
 11  Right arrow anti-clockwise
Guangfo circular IR
Luntou
 4  Right arrow to Huangcun
Guanzhou River
Guanzhou  4 
Guanzhou River
Higher Education
Mega Center North
 4 
Reserve branch line extension
 7  Right arrow to Yanshan
Higher Education
Mega Center South
 4   7 
Higher Education Mega Center South
Stabling Yard
Future extension
Lijiao Stream
 7  Down arrow to Meidi Dadao
 4  Down arrow to Nansha Passenger Port
This diagram:

Line 12 of the Guangzhou Metro (Chinese: 广州地铁12号线) is a fully automated rapid transit line under construction in Guangzhou, China. It was originally planned to open for operation in 2023, but due to the obstruction of the construction progress, it was announced in 2022 that it was expected to be completed in 2024, and the opening has since been delayed into 2025.

History

Construction officially began in November 2018.

Stations (north to south)

Map of Line 12
Station name Connections
English Chinese
Xunfenggang 浔峰岗  6  601
Liheng Road 里横路
Chatou 槎头  13 
Julong 聚龙  8  806
Baiyun Railway Station 白云站  22   24 
 8  (via Shitan 805)
Guangzhou Baiyun railway station GBA
Nanhang Xincun 南航新村
Xinshixu 新市墟  14 
Baiyun Culture Square 白云文化广场  2  220
Yunxi Park 云溪公园
Xiaojinzhong 小金钟
Jingyun Road 景云路
Guangzhou University of Chinese Medicine 中医药大学  11  1112
Hengfu Road 恒福路
Taojin 淘金  5  508
 13 
Martyrs' Park 烈士陵园  1  111
Donghu 东湖  6  613
 10 
Ersha Island 二沙岛
Guangzhou Art Meseum 广州艺博院 OSI:  3   APM 
(Canton Tower 309 APM01)
Chigang 赤岗  8  824
Chisha North 赤沙北
Chisha 赤沙  11  1101
Beishan 北山
Guanzhou 官洲  4  420
Higher Education Mega Center North 大学城北  4  419
Higher Education Mega Center South 大学城南  4  418
 7  709

Rolling stock

Line 12 train

Line 12 will use GoA4 fully automated, 6-car type A trains with a maximum speed of 80 km/h.

Notes

References

  1. "广州地铁十二号线将实现无人驾驶_央广网". www.cnr.cn. Retrieved 2022-11-13.
  2. "广州地铁12号线将设17个换乘站并设支线" [Guangzhou Metro Line 12 will have 17 transfer stations and a branch line]. 新华网 (in Chinese). 21 September 2018. Retrieved 12 February 2021.
  3. 徐振天 (2022-03-22). "建设进度不理想,广州3条地铁延迟一年竣工". 金羊網 (in Chinese (China)). 廣州. Retrieved 2022-03-27.
  4. "广州一天开建6条地铁" [Guangzhou starts construction on six metro lines in a single day]. 人民网 (in Chinese). 20 November 2018. Retrieved 12 February 2021.
  5. "中车株机研制时速80公里全自动驾驶地铁列车". Archived from the original on 2022-05-18.
  6. "广州市轨道交通十二号线工程(浔峰岗~大学城南)环境影响报告书全本公示". 2018-03-05. Archived from the original on 2018-04-03.
Guangzhou and Foshan Metro lines
Guangzhou Metro Guangzhou Metro
Lines in operation
Under construction
  •  8  (Far North)
  •  10 
  •  11 
  •  12 
  •  13  (Phase 2)
  •  14  (Phase 2)
  •  18  (North & Southwest)
  •  22  (Remaining & North)
  •  24 
Under planning
Foshan Metro Foshan Metro
Lines in operation
Under construction
  •  3  (unopened section)
  •  4 
Under planning
Category: