Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
You can help expand this article with text translated from the corresponding article in Basque. (June 2022) Click for important translation instructions.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Basque Misplaced Pages article at ]; see its history for attribution.
You may also add the template {{Translated|EU|Bilbo-Plentzia burdinbidea}} to the talk page.
Line 2 of the metro opened in 2002, sharing tracks with the first line between Bolueta and San Inazio. Both lines were extended by one station on 8 January 2005, with the opening of Etxebarri.
The Maidagan level crossing in Getxo, one of the two that remained in the metro, was removed in 2012 by building a tunnel for the metro in the area. The other remaining level crossing was located next to Urduliz station. It closed in 2015, and was rebuilt underground. The new Urduliz station opened in 2017.
On 15 June 2020, Ibarbengoa station (between Bidezabal and Berango) opened to the public. The station was actually built in 2012 (at the same time as the Maidagan level crossing was put underground), but the opening was delayed until its park and ride facilities were built.
Many stations on the Lutxana-Plentzia section were opened during the nineteenth century. The given dates refer to the inauguration of the metro service.