(Redirected from Line 2, Suzhou Rail Transit )
Railway line in Suzhou, Jiangsu, China
Line 2 A train of Suzhou Rail Transit Line 2Overview Status In operation Owner Suzhou Rail Transit Co., Ltd Termini Stations total 35 stations first phase: 22 stations (6 Elevated Stations, 16 Underground Stations) second phase: 13 stations Service Type Rapid transit System Suzhou Rail Transit Operator(s) Suzhou Rail Transit Co., Ltd History Opened December 28, 2013; 10 years ago (2013-12-28) Technical Line length 40.4 km (25.1 mi) Number of tracks 2 Character Elevated and Underground Track gauge 1,435 mm (4 ft 8+1⁄2 in) Electrification overhead wire
Line 2 is a north-south line of Suzhou Rail Transit . It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.
History
The line was opened in two phases, with the 26.557 km (16.502 mi) long first phase from Suzhou North Railway Station to Baodaiqiao South (宝带桥南) near Baodai Bridge started operations on December 28, 2013. This section consisted of 6.57 km (4.08 mi) of elevated track and 19.146 kilometres (11.897 mi) of underground track.
The 14.347 km (8.915 mi) second phase, running from Qihe to Fuxiang Lu in the north, and from Yinzhong Lu (尹中路) to Sangtiandao (桑田岛) in the east, commenced trial operations on September 24, 2016.
A north extension to Aigehao Road is under construction, and it's expected to open in 2026.
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Suzhou North Railway Station — Baodaiqiao South
28 December 2013
26.557 km (16.50 mi)
22
Phase 1
Qihe — Suzhou North Railway Station
24 September 2016
2.2 km (1.37 mi)
2
Phase 2
Baodaiqiao South — Sangtiandao
11.643 km (7.23 mi)
11
Stations
Interchange signage in Guangji Nanlu station
Platform of Dushuhu Neighborhood Center station
Operations
Intervals
Weekdays & Weekends
Period
Time
Intervals
Weekdays morning rush hours (Peak)
7:45 — 9:00
6m10s
Weekdays evening rush hours (Peak)
17:00 — 19:00
6m10s
Weekends daily rush hours (Peak)
11:00 — 20:40
6m10s
Other hours (Normal)
Exclude above rush hours
6m50s
Rolling stock
Fleet numbers
Year Built
Time in service
Builder
Class
Number in service
No of car
Assembly
Rolling stock
Number
Depots
Line assigned
Notes
105 (23 sets)
2013-2015
2014-present
CSR Nanjing Puzhen
B
105 (23 sets)
5
Tc+Mp+M + Mp+Tc
PM061
020101-022305 (0201-0223)
Taiping Yard
2
85 (17 sets)
2014-2016
2016-present
CSR Nanjing Puzhen
B
85 (17 sets)
5
Tc+Mp+M + Mp+Tc
PM080
022401-024005 (0224-0240)
Taiping Yard
2
100 (20 sets)
2022-2023
2023-present
CRRC Nanjing Puzhen
B
100 (20 sets)
5
Tc+Mp+M + Mp+Tc
PM208
022501-026005 (0225-0260)
Taiping Yard
2
References
2号线施工6月底结束 12月28日试营运 . 扬子晚报 (in Chinese). March 25, 2013. Archived from the original on February 25, 2013. Retrieved February 22, 2013.
"终于定了!苏州轨交2号线延伸线明天正式开通" . 新华报业网. September 23, 2016.
"轨交二号线运输方案昨发布一号线将适当调整" (in Chinese). 搜狐. Retrieved December 26, 2017.
Public transportation in Jiangsu (JS) Nanjing Metro Lines in operation
Under construction
3 (Phase 3)
4 (Phase 2)
5 (North section)
6
7 (Central section)
9
10 (Phase 2)
11
S2
S4 (Nanjing section)
S5
Under planning
2 (eastern extension)
3 (Phase 4)
4 (Phase 3)
8
9 (Phase 2)
10 (Phase 3)
16
18
S3 (eastern extension)
S6 (western extension)
Suzhou RT Lines in operation
Under construction
2 (northern extension)
4 (northern extension)
7 (northern extension)
10 (S5)
Under planning
Wuxi Metro Lines in operation
Under construction
S2
4 (Phase 2)
5 (Phase 1)
6 (Phase 1)
Under planning
2 anzhen
5 (Phase 2)
6 (Phase 2)
3 (North extension)
3 (South extension)
3 Branch line
4 (Phase 3)
7
8
Changzhou Metro Lines in operation
Under construction
Under planning
Xuzhou Metro Lines in operation
Under construction
Under planning
Nantong RT Shanghai Metro (Jiangsu Section)Lines in operation 11 (Kunshan Section)
Shanghai Suburban Railway (Jiangsu Section) LRT & tramsTransportation hubs Int'l airports
Railway stations
Categories :
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.
**DISCLAIMER** We are not affiliated with Wikipedia, and Cloudflare.
The information presented on this site is for general informational purposes only and does not constitute medical advice.
You should always have a personal consultation with a healthcare professional before making changes to your diet, medication, or exercise routine.
AI helps with the correspondence in our chat.
We participate in an affiliate program. If you buy something through a link, we may earn a commission 💕
↑