Misplaced Pages

Line 9 (Tianjin Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Line 9, Tianjin Metro) Metro line in Tianjin, China

Line 9
A train at Tanggu
Overview
Other name(s)Jinbin (Tianjin-Binhai) Light Rail (津滨轻轨)
StatusOperational
OwnerTianjin
LocaleTianjin, China
Termini
Stations21
Service
TypeRapid transit
SystemTianjin Metro
Services1
Operator(s)Train Service Center III, Tianjin Rail Transit Group Corporation
Daily ridership97,000 (Avg.)
History
Opened28 March 2004; 20 years ago (2004-03-28)
Technical
Line length52.76 km (32.78 mi)
Number of tracks2
CharacterUnderground, At-grade, & Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Route map

Legend
Donghai Road
Convention and
Exhibition Center
Taihu Road
Citizen Plaza
TEDA TEDA Tram TEDA Modern Guided Rail Tram
Tanggu
Hujiayuan
Hujiayuan depot
Zhongxicun
Tianjin Pipe Corporation
Jinshan Railway
Junliangcheng
Xiaodongzhuang
Dongli Economic
Development Area
Xinli sidings
Xinli
Zhangguizhuang
Erhaoqiao
Yihaoqiao
Zhongshanmen
Dongxing Road
Zhigu
Line Tianjin Metro Line 5
Shiyijing Road
Dawangzhuang
Tianjin Metro Line 2 to Binhai Intl. Airport
Tianjinzhan China Railway (Tianjin)
to Xiaodian Tianjin Metro Line 3 to Nanzhan
Tianjin Metro Line 2 to Caozhuang

Line 9 is a rapid transit line of the Tianjin Metro. It spans 52.8 km (32.8 mi) with 21 stations, connecting the urban area of Tianjin with Binhai New Area, a new area within the jurisdiction of Tianjin Municipality. The one-way journey time is approximately one hour.

Line 9 is run by Tianjin Binhai Mass Transit Development Co., Ltd, which became a subsidiary of Tianjin Rail Transit Group Corporation in 2017.

Design

Most of the line is elevated that runs parallel to the Jinbin Expressway (only the westernmost 6.67 kilometres (4.14 mi) runs in tunnels). Hence, it is often wrongly called "light rail", as is commonplace in China with elevated or at-grade metro lines.

Trains can reach a speed of up to 100 kilometres per hour (62 mph). Of the 4 bridges along the line, the No. 1 and No. 4 bridges are longer and use ballastless track, while the No. 2 and No. 3 bridges use ballasted track. The No. 1 bridge, from Guanghua Road (between Dongxing Road and Zhongshanmen stations) to Babao, with a total length of 25.8 kilometres (16.0 mi), is the longest bridge used in rapid transit systems in China.

History

Line 9 first opened on 28 March 2004. It was extended to Tianjinzhan on 15 October 2012, connecting with the main metro network by allowing passengers to transfer to Lines 2 and 3.

Train service on the whole line was suspended on 13 August 2015 after a series of massive explosions devastated the area. The explosions occurred less than a kilometre from Donghailu station; the roof of the station collapsed, and the control centre nearby was destroyed. It resumed operation on 16 December from Tianjin Railway Station to Tianjin Pipe Corporation Station.

Timeline

  • 18 May 2001 - Construction begins
  • 30 September 2003 - Construction completes
  • 28 March 2004 - Trial service begins, 6 stations are open to service: Zhongshanmen, Donglikaifaqu, Gangguangongsi, Yanghuoshichang, Dongtinglu, and Donghailu. The price of the tickets are 3 yuan for less than 30 km (19 mi) or 5 yuan for greater than 30 km (19 mi). The first train departs at 07:00 and the last at 19:00. Hujiayuan is a special station only open to BMT staffs and Huizhanzhongxin station near TEDA football field is only open for football matches and other special events.
  • 25 May 2004 - Yihaoqiao station opens for service
  • 13 September 2004 - Extends open time to 06:30 - 19:00
  • 18 October 2004 - Shiminguangchang station opens
  • 27 March 2005 - Huizhanzhongxin station opens on normal days
  • 28 April 2005 - Erhaoqiao station opens, Yihaoqiao station closes. Automatic ticket selling and checking system begins use. The price of a ticket changes to 2, 3, 4, 5, or 6 yuan, depending on the travel distance. Extends open time to 06:30 - 20:00.
  • Late 2005 or early 2006 - Yanghuoshichang station changed name to Tanggu; Dongtinglu changed name to TEDA.
  • 1 March 2006 - Yihaoqiao station reopens; Xinlizhen, Xiaodongzhuang, Junliangcheng, Hujiayuan stations open, so all 14 stations that have been constructed are open.
  • 28 March 2006 - At 11 a.m., the trains begin automatic train operation; the total travel time from Zhongshanmen to Donghailu decreases from 49 min to 47.5 min.
  • 1 May 2006 - Extends open time to 06:30 - 21:00.
  • 1 May 2010 - Shiyijing Road to Zhongshanmen was opened
  • 12 August 2015 - the 2015 Tianjin explosions caused significant damage; all operations are suspended.
  • 16 December 2015 - Tianjin Railway Station to Tianjin Pipe Corp Station section resumes operation. The operation time is 06:00 - 22:30.
  • Early 2016 - Tianjin Pipe Corp Station to Citizen Plaza section resumes operation.
  • 31 December 2016 - Citizen Plaza to Donghai Road section resumes operation.

Chronology of section openings

Segment Commencement Length Station(s) Name
Zhongshanmen — Donghai Road 28 March 2004 45.409 km (28.22 mi) 9 Phase 1
Yihaoqiao 25 May 2004 Infill station 1
Citizen Plaza 18 October 2004 Infill station 1
Convention and Exhibition Center 27 March 2005 Infill station 1
Erhaoqiao 28 April 2005 Infill station 1
Hujiayuan 1 June 2006 Infill station 1
Shiyijing Road — Zhongshanmen 1 May 2011 6.151 km (3.82 mi) 3 Phase 2 (1st section)
Tianjin — Shiyijing Road 15 October 2012 1.2 km (0.75 mi) 2 Phase 2 (2nd section)
Tianjin Pipe Corporation — Donghai Road 16 December 2015 Temporary ceased operation -6 Explosions reconstruction project
Tianjin Pipe Corporation — Citizen Plaza 27 June 2016 Reentered operation 5
Citizen Plaza — Donghai Road 31 December 2016 Reentered operation 1
Zhangguizhuang, Taihu Road Infill stations 2

Stations (west to east)

Line 9 drawn to scale.

Service routes:

  • Tianjin Railway Station - Donghai Road
  • Tianjin Railway Station - Zhigu - Tanggu through train, runs twice on each directions, of which the 05:55 train from Tianjinzhan will continue to Donghailu (↓)
Service

routes

Station name Connections Bus Connections Distance
km
Location
English Chinese
Tianjinzhan 天津站 Tianjin Metro Line 2 Tianjin Metro Line 3 Tianjin railway station TJP 5 8 8区间 13 24 27 28 35 35区间 50 96 96区间 97 150大圈 156 158 176 181 182 185 186 186快线 187 188 188盘山旅游专线 195 196 198 199 461 462航母旅游专线 462专线 468 528 570快线 570专线 574 607 621 634 635 638 639东线 639西线 645 645区间 651 660 663 666 672 676 701 749 760 802 806 808 813 824 827 828 832 836 868 905 951 953 961 观光3 国展定制2线 环球影城直通车 机场穿梭车 机场大巴天津站 机场天津站线 京津城际商务班车 跨城穿梭车 通勤570 通勤832 小187路低速线 0.00 0.00 Hedong
| Dawangzhuang 大王庄 176 185 621 651 676 806 1.40 1.40
| Shiyijinglu 十一经路 92 600内环 600外环 643 673 803 840 842 847 862 866 871 902 963 机场专线4 通勤842 通学1 0.74 2.14
Zhigu 直沽 Tianjin Metro Line 5 92 369 511 608 642 643 665 668 673 760 840 860 962 通学2 专线678 1.54 3.68
| Dongxinglu 东兴路 760 840 1.08 4.76
| Zhongshanmen 中山门 30 30区间 185 503 621 642 643 656 668 673 806 830 840 856 857 860 872 905 通勤872 2.02 6.78
| Yihaoqiao 一号桥 Tianjin Metro Line 10 (via Yihaoqiao) 30 30区间 185 503 621 639东线 679 706 715 806 830 840 856 857 860 872 观光3 通勤715 通勤872 1.73 8.51
| Erhaoqiao 二号桥 30 30区间 185 503 621 639东线 679 706 715 806 819 830 840 856 857 860 872 观光3 通勤715 通勤872 0.90 9.41
| Zhangguizhuang 张贵庄 30 185 503 679 706 715 806 819 830 840 856 857 872 通勤872 1.32 10.73 Dongli
| Xinli 新立 185 679 690西线 716 806 830 856 2.51 13.24 Dongli
| Donglikaifaqu 东丽开发区 185 503 621 715 716 751 806 830 835 856 东丽开发区1 东丽开发区2 通勤305东线 通勤305西线 通勤716 1.98 15.22
| Xiaodongzhuang 小东庄 185 503 621 716 835 国展定制4线 4.32 19.54
| Junliangcheng 军粮城 185 503 621 717 720 780 定制36 4.92 24.46
| Gangguangongsi 钢管公司 126 185 211 307 503 621 835 931 4.25 28.71
| Hujiayuan 胡家园 6.16 38.00 Binhai
Tanggu 塘沽 103 108 108专线 109 110 113 118 124 132 133 134 134通勤快车 145 166 167 501 501晚间线 502 503 507 524 605 651 825 834 835 880 936 941 宝坻塘沽专线 机场专线2 4.81 42.81
TEDA 泰达 506 931 955 1.64 44.45
Shiminguangchang 市民广场 101 937 940 旅游专线1 2.21 46.66
Taihulu 太湖路 508内环 521 2.18 48.84
Huizhanzhongxin 会展中心 130 130快线 508内环 508外环 524 820 934 1.35 50.19
Donghailu 东海路 117 127航母 137 503 505 508内环 508外环 509 518内环 518外环 935 滨海中关村摆渡车 1.31 51.50

Rolling stock

Type Time of manufacturing Series Sets Assembly Notes
Type B 2003 - 2010 DKZ7 38 Mcp+T+T+Mcp Manufactured by CNR Changchun Railway Vehicles

Notes

  1. Not really a light rail. In China, elevated or at-grade metro lines always wrongly called "light rail". Only 6.67 km section on the line is underground.

References

  1. "天津地铁9号线全线投运 乘客"超时"按线网最高票价扣费". Archived from the original on 2 July 2013. Retrieved 10 May 2013.
  2. "天津地铁9号线延至天津站 末车时间延长至22:00". Archived from the original on 28 July 2013. Retrieved 14 October 2012.
  3. "津滨轻轨地铁9号线受损严重 展开抢修 尽早恢复运营 津滨轻轨地铁9号线受损严重 展开抢修 尽早恢复运营". Archived from the original on 26 June 2019. Retrieved 16 August 2015.
  4. ^ "津滨轻轨16日起恢复部分路段运营". China National Radio. 14 December 2015. Retrieved 14 December 2015.
  5. "30分钟内换乘可减1元 天津轨道交通再添两组"站外换线联程优惠"试点车站". 12 November 2022.
  6. "Archived copy". Archived from the original on 1 June 2015. Retrieved 24 November 2012.{{cite web}}: CS1 maint: archived copy as title (link)
Public transportation in Tianjin Metropolitan Area (TJ)
Tianjin Metro Tianjin Metro (Tianjin Metro Group Co., Ltd.) Tianjin Metro
Lines in operation
Under construction
Under planning
CR S-train
Lines in operation
CR C-train
Lines in operation
Under construction
Other CR railways
Corridors
Major railways
Trams in China Trams
Planned
  • Xiqing SkyShuttle T2
  • Wuqing SkyShuttle 1
  • Baodi Tram 1
  • Eco-city Lower-traffic rail transit
Closed
Transportation hubs
List of airports in China Airports
China Railway Railway stations
Tianjin Metro stations
Line 9
Categories: