Line 9 | |
---|---|
Overview | |
Status | Under Construction |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | |
Stations | 12 |
Service | |
Type | Rapid transit |
System | Changchun Rail Transit |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Completed | 2025 |
Technical | |
Line length | 28 km (17.40 mi) |
Number of tracks | 2 |
Character | 16km Underground, 12km Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 9 of the Changchun Rail Transit (Chinese: 长春轨道交通九号线; pinyin: Zhǎngchūn guǐdào jiāotōng jiǔ hào xiàn) is a rapid transit line running from Zhaojiagang East to North Zhongchuan Street including a stop called Changchun Longjia Airport Station. It is under construction and planned to open in 2025.
History
Phase 1
Plans to open by 2025 from Zhaojiagang East to Jiutai South Railway Station including Changchun Longjia Airport Station.
References
- ^ 长春轨道交通9号线一期工程正式开建,计划2025年年底通车!. 搜狐 (in Chinese). 2021-04-02. Archived from the original on 2021-08-12. Retrieved 2021-08-12.
- "Changchun Subway Line 9". TravelChinaGuide.com.
Public transportation in Jilin (JL) | |||||||
---|---|---|---|---|---|---|---|
Changchun Rail Transit |
| ||||||
Trams in Changchun |
| ||||||
CR C-train |
| ||||||
CR intercity railways |
| ||||||
Transportation hubs |
| ||||||