Misplaced Pages

Serpukhovsko-Timiryazevskaya line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Line 9 (Moscow Metro)) Moscow Metro line
Serpukhovsko-Timiryazevskaya line
Overview
LocaleMoscow
Termini
Stations25
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Rolling stock81-760/761
81-760A/761A/763A
Daily ridership1,108,800
History
OpenedNovember 8, 1983
Technical
Line length41.2 kilometres (25.6 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+27⁄32 in)
ElectrificationThird rail
Route map

Legend
Altufyevo
Bibirevo
Otradnoye
Vladykino yard
Vladykino Transfer for #14 Moscow Central Circle at Vladykino
Petrovsko-Razumovskaya Transfer for #10 Lyublinsko-Dmitrovskaya line at Petrovsko-Razumovskaya via cross-platform interchange Ground transferTransfer for #D3 Line D3 (Moscow Central Diameters) at Petrovsko-Razumovskaya
Timiryazevskaya Transfer for #D1 Line D1 (Moscow Central Diameters) at TimiryazevskayaGround transferTransfer for #13 Moscow Monorail at Timiryazevskaya
Dmitrovskaya Ground transfer#D2 Line D2 (Moscow Central Diameters)
Savyolovskaya Savyolovsky railway station Transfer for #11 Bolshaya Koltsevaya line at SavyolovskayaTransfer for #11A Bolshaya Koltsevaya line at Savyolovskaya Ground transfer#D1 Line D1 (Moscow Central Diameters)
Mendeleyevskaya Transfer for #5 Koltsevaya line at Novoslobodskaya
Tsvetnoy Bulvar Transfer for #10 Lyublinsko-Dmitrovskaya line at Trubnaya
Chekhovskaya Transfer for #2 Zamoskvoretskaya line at Tverskaya Transfer for #7 Tagansko-Krasnopresnenskaya line at Pushkinskaya
Borovitskaya Transfer for #1 Sokolnicheskaya line at Biblioteka Imeni Lenina Transfer for #3 Arbatsko-Pokrovskaya line at Arbatskaya (Transfer for #4 Filyovskaya line at Aleksandrovsky Sad)(Transfer for #4A Filyovskaya line at Aleksandrovsky Sad)
Moskva River
Polyanka
Serpukhovskaya Transfer for #5 Koltsevaya line at Dobryninskaya
Tulskaya (Transfer for #17 Rublyovo-Arkhangelskaya line at Tulskaya)
Nagatinskaya Nizhniye Kotly railway station Ground transferTransfer for #14 Moscow Central Circle at Verkhnie Kotly
Nagornaya
Nakhimovsky Prospekt
Sevastopolskaya Transfer for #11 Bolshaya Koltsevaya line at Kakhovskaya
Chertanovskaya
Varshavskoye yard
Yuzhnaya
Prazhskaya
Ulitsa Akademika Yangelya
Annino
MKAD_Москва.svg MKAD
Bulvar Dmitriya Donskogo Transfer for #12 Butovskaya line at Ulitsa Starokachalovskaya
This diagram:

The Serpukhovsko-Timiryazevskaya line (Russian: Серпухо́вско-Тимиря́зевская ли́ния, IPA: [sʲɪrpʊˈxofskə tʲɪmʲɪˈrʲazʲɪfskəjə ˈlʲinʲɪjə]) (Line 9; Grey Line) sometimes colloquially referred to as Grey Line (Russian: серая линия), is a line of the Moscow Metro. Originally opened in 1983, it was extended throughout the 1980s and early 90s and again in the early 2000s. With its current length of 41.2 km (25.6 mi), it among the longest lines of the Moscow Metro (all underground making it the world's 8th longest rapid transit tunnel). There are 25 stations on the line.

History

The project of a north-south diameter was finalised in the 1971 Moscow General Development Plan, and construction began in the mid-1970s. The first stage, the southern Serpukhovsky radius, was opened in 1983 which brought the Metro to the southern districts of Danilovsky, Nagorny, Ziuzino and Chertanovo Severnoye. Starting at Serpukhovskaya square, the radius follows the Varshavskoye Highway, twice crosses the Paveletsky suburban railway line, deviates slightly westwards passing Azovskaya street, where it meets the erstwhile terminus of the Gorkovsko–Zamoskvoretskaya (before 1984) and Kakhovskaya lines (1983–2019) – Kakhovskaya station. Afterwards, the line crosses the Chertanovo Severnoye's main intersection at Balaklavsky avenue and Sevastopolsky Boulevard and terminates in Chertanovo Tsentralnoye.

Some of the new technical methods employed in the construction of this section included passing from deep alignment to shallow in water-carrying soils. A new technique of contour freezing was applied, which then used explosives to bore through the unstable region. The stretch between Serpukhovskaya and Tulskaya was further made difficult due gasoline leaks from an above petrol station over the years sufficiently absorbed by the soil such that the high concentration of fumes caused a fire in the unfinished tunnel, this introduced a new practice of adding additional boreholes in areas of difficult ventilation.

In November 1985 the line had its first extension southwards to Prazhskaya. This station was designed by Czechoslovak engineers and specialists from the Prague Metro. Simultaneously, the station Moskevská was built in Prague by Soviet engineers.

In the mid-1980s work started on extending the line northwards through the city centre. This very deep section passed the areas of Yakimanka and Arbat where the first 4-station-transfer in Moscow (nicknamed ABBA, by the first letters of its stations: Aleksandrovsky sadBorovitskayaBiblioteka imeni LeninaArbatskaya) was set up at in 1986. In 1987, the Chekhovskaya station followed, located near the Pushkin Square and offering transfers to Pushkinskaya and Gorkovskaya (now Tverskaya) stations of Zhdanovsko-Krasnopresnenskaya and Gorkovsko-Zamoskvoretskaya lines, respectively. In 1988 the final extension through the centre first deviated eastwards to include Tsvetnoy Bulvar and then crossed the Koltsevaya line at Novoslobodskaya before terminating at Savyolovsky Rail Terminal.

Afterwards, construction of the Timiryazevsky radius followed and in 1991 the major five station extension brought the line along the Dmitrovskoye Highway to the northern districts of Timiryazvesky, Butyrsky, Marfino and Otradnoye while providing three links to the stations of Savyolovsky suburban railway line. The station Timiryazveskaya is the only one in Moscow that has a deep single-vault (Leningrad) design. Two more stations were built north of Otradnoye, Bibirevo in 1992 and Altufyevo in 1994, making the line the northernmost in the system.

On the opposite Serpukhovsky radius, three more stations were built in the early 2000s in southern part of Chertanovo district: Ulitsa Akademika Yangelya (2000), Annino (2001) and Bulvar Dmitriya Donskogo (2002). The latter carried the line into Severnoye Butovo District, making it the first line to cross the MKAD beltway. Today the line is the only one in Moscow for which no extension plans or proposals exist.

Timeline

Segment Date opened Length
SerpukhovskayaYuzhnaya November 11, 1983 13.0 km
YuzhnayaPrazhskaya November 6, 1985 1.1 km
SerpukhovskayaBorovitskaya January 23, 1986 2.8 km
BorovitskayaChekhovskaya December 31, 1987 1.6 km
ChekhovskayaSavyolovskaya December 31, 1988 4.2 km
SavyolovskayaOtradnoye March 3, 1991 8.5 km
OtradnoyeBibirevo December 31, 1992 2.6 km
BibirevoAltufyevo July 15, 1994 2.0 km
PrazhskayaUlitsa Akademika Yangelya August 31, 2000 2.0 km
Ulitsa Akademika YangelyaAnnino December 12, 2001 1.4 km
AnninoBulvar Dmitriya Donskogo December 26, 2002 2.0 km
Total 41.5 km

Stations

Station Name Transfer
English Russian
Altufyevo Алтуфьево
Bibirevo Бибирево
Otradnoye Отрадное
Vladykino Владыкино Transfer for #14 Moscow Central Circle at Vladykino Vladykino
Petrovsko-Razumovskaya Петровско-Разумовская #10 Lyublinsko-Dmitrovskaya line Petrovsko-Razumovskaya (cross-platform interchange)
Leningradsky suburban railway line Petrovsko-Razumovskaya
#D1 Line D1 (Moscow Central Diameters) Petrovsko-Razumovskaya (under construction)
Timiryazevskaya Тимирязевская #D1 Line D1 (Moscow Central Diameters) Timiryazevskaya
Transfer for #13 Moscow Monorail at Timiryazevskaya Timiryazevskaya
Dmitrovskaya Дмитровская Transfer for #D2 Line D2 (Moscow Central Diameters) at Dmitrovskaya Dmitrovskaya
Transfer for #D1 Line D1 (Moscow Central Diameters) at Dmitrovskaya Dmitrovskaya (under construction)
Savyolovskaya Савёловская #11 Bolshaya Koltsevaya lineTransfer for #11A Bolshaya Koltsevaya line at Savyolovskaya Savyolovskaya
Transfer for #D1 Line D1 (Moscow Central Diameters) at Moscow Savyolovsky Moscow Savyolovsky
Savyolovsky suburban railway line Savyolovsky Terminal
Mendeleyevskaya Менделеевская Transfer for #5 Koltsevaya line at Novoslobodskaya Novoslobodskaya
Tsvetnoy Bulvar Цветной бульвар Transfer for #10 Lyublinsko-Dmitrovskaya line at Trubnaya Trubnaya
Chekhovskaya Чеховская Transfer for #2 Zamoskvoretskaya line at Tverskaya Tverskaya
Transfer for #7 Tagansko-Krasnopresnenskaya line at Pushkinskaya Pushkinskaya
Borovitskaya Боровицкая Transfer for #1 Sokolnicheskaya line at Biblioteka Imeni Lenina Biblioteka Imeni Lenina
Transfer for #3 Arbatsko-Pokrovskaya line at Arbatskaya Arbatskaya
#4 Filyovskaya lineTransfer for #4A Filyovskaya line at Aleksandrovsky Sad Aleksandrovsky Sad (via #1 Sokolnicheskaya line or #3 Arbatsko-Pokrovskaya line)
Polyanka Полянка
Serpukhovskaya Серпуховская Transfer for #5 Koltsevaya line at Dobryninskaya Dobryninskaya
Tulskaya Тульская
Nagatinskaya Нагатинская Transfer for #14 Moscow Central Circle at Verkhniye Kotly Verkhniye Kotly
Paveletsky suburban railway line Verkhnie Kotly
Nagornaya Нагорная
Nakhimovsky Prospekt Нахимовский проспект
Sevastopolskaya Севастопольская Transfer for #11 Bolshaya Koltsevaya line at Kakhovskaya Kakhovskaya
Chertanovskaya Чертановская
Yuzhnaya Южная
Prazhskaya Пражская
Ulitsa Akademika Yangelya Улица Академика Янгеля
Annino Аннино
Bulvar Dmitriya Donskogo Бульвар Дмитрия Донского Transfer for #12 Butovskaya line at Ulitsa Starokachalovskaya Ulitsa Starokachalovskaya

Rolling stock

The line is served by the Varshavskoe (№ 8) and Vladykino (№ 14) depots. In 2005 it began a slow transition to eight carriage trains. As of November 2005, Vladykino completed its transition and presently has 43 eight-carriage trains assigned to them. Varshavskoe began later and completed its transition in March 2006 with 38 eight-carriage trains. The line received new 81-714/717 trains upon its opening in 1983. Due to its recent extensions various trains were added to its ever-growing stock, some surplus from other depots, others factory fresh 81-714.5/717.5 and 81-714.5M/717.5M.

Starting 2012, the line began receiving new 81-760/761 trains. 81-717/714 trains have been completely withdrawn and scrapped, 81-717.5/714.5 and 81-717.5M/714.5M were transferred to other lines where additional trains were needed. In November 2013, the Varshavskoe depot was fully upgraded to new trains, there were only a few old 81-717/714 carriages, which formed about three trains. Vladykino, as of November 2013, only had two new trains, but additional 81-760/761s came from the Varshavskoe depot in December 2013.

Subway car types used on the line over the years:

-Series 81-717: 1983 - March 2015

-Series 81-717.5: 1994 - March 2015

-Series 81-717.5M: 2003 - March 2015

-Series 81-760/761: 26 December 2012 – present

Recent events and future plans

Second exits at Petrovsko-Razumovskaya, Savyolovskaya and Timiryazevskaya stations are planned. However, in terms of extensions, the line is considered to be complete. Although there is some need of connection to the south border parts of Moscow, it was decided that Butovskaya Light Metro Line will fulfil this need.

References

  1. Пассажиропотоки 2009 год. Олимп (in Russian). Archived from the original on 28 September 2010. Retrieved 18 June 2010.

External links

KML file (edithelp) Template:Attached KML/Serpukhovsko-Timiryazevskaya LineKML is from Wikidata
Lines of the Moscow Metro
Lines under construction or proposed
Moscow Metro
#1 Sokolnicheskaya line Sokolnicheskaya line
#2 Zamoskvoretskaya line Zamoskvoretskaya line
#3 Arbatsko-Pokrovskaya line Arbatsko-Pokrovskaya line
#4 Filyovskaya line Filyovskaya line
Main
#4А 4А line Branch
#5 Koltsevaya line Koltsevaya line
#6 Kaluzhsko-Rizhskaya line Kaluzhsko-Rizhskaya line
#7 Tagansko-Krasnopresnenskaya line Tagansko-Krasnopresnenskaya line
Kalininsko-Solntsevskaya line
#8 Kalininskaya line Kalininskaya line
#8A Solntsevskaya line Solntsevskaya line
#9 Serpukhovsko-Timiryazevskaya line Serpukhovsko-Timiryazevskaya line
#10 Lyublinsko-Dmitrovskaya line Lyublinsko-Dmitrovskaya line
#11 Bolshaya Koltsevaya line Bolshaya Koltsevaya line
#12 Butovskaya line Butovskaya line
#13 Moscow Monorail Moscow Monorail
#14 Moscow Central Circle Moscow Central Circle
#15 Nekrasovskaya line Nekrasovskaya line
#16 Troitskaya line Troitskaya line
#17 Rublyovo-Arkhangelskaya line Rublyovo-Arkhangelskaya line
#18 Biryulyovskaya line Biryulyovskaya line
Categories: