Ling Ao Nuclear Power Plant | |
---|---|
Official name | 岭澳核电站 |
Country | China |
Location | Longgang District, Shenzhen, Guangdong |
Coordinates | 22°36′17.24″N 114°33′05.36″E / 22.6047889°N 114.5514889°E / 22.6047889; 114.5514889 |
Status | Operational |
Construction began |
|
Commission date |
|
Owners | Daya Bay Nuclear Power Operations and Management Company |
Operator | Lingao Nuclear Power Company Ltd. |
Nuclear power station | |
Reactors | 4 (2 in Phase I, 2 in Phase II) |
Reactor type | PWR |
Cooling source | South China Sea |
Thermal capacity |
|
Total electricity generated | 448.55 TWh (1,614.8 PJ) (by the end of 2021) |
Power generation | |
Units operational |
|
Make and model |
|
Nameplate capacity | 3914 MWe |
Capacity factor |
|
Annual net output | 30,263.51 GWh (108,948.6 TJ) (2021) |
[edit on Wikidata] |
Ling Ao Nuclear Power Plant (岭澳核电站) is located on the Dapeng Peninsula in Longgang District, Shenzhen, Guangdong, China, about 60 km north of Hong Kong, 1 km north of Daya Bay Nuclear Power Plant. It is operated by China General Nuclear Power Group. The units on site are separated between phase I and phase II.
The plant was one of China's largest energy projects of the latter 1990s.
Reactors
Ling Ao phase I has two nuclear reactors, 950 MWe PWRs Ling Ao I-1 and I-2, based on the French 900 MWe three cooling loop design (M310), which started commercial operation in 2002 and 2003. The planned investment sum for phase I was ca 4 billion USD.
In a Phase II development two CPR-1000 reactors, Ling Ao II-1 and II-2 (alternatively, units 3 and 4), were constructed in conjunction with Areva, based on the French three cooling loop design. Ling Ao II-1, China’s first domestic CPR-1000 nuclear power plant, was first connected to the grid on 15 July 2010, having started criticality testing on 11 June 2010. It started commercial operations on 27 September 2010. Ling Ao II-2 was synchronized to the grid on May 3, 2011, with commercial operation beginning on August 7, 2011.
Reactor data
The Ling Ao Nuclear Power Plant consist of 4 operational reactors.
Unit | Type | Model | Net power |
Gross power |
Thermal power |
Construction start |
First criticality |
Grid connection |
Operation start |
Notes |
---|---|---|---|---|---|---|---|---|---|---|
Ling Ao 1 | PWR | M310 | 950 MW | 990 MW | 2905 MW | 1997-5-15 | 2002-02-04 | 2002-02-26 | 2002-05-28 | |
Ling Ao 2 | PWR | M310 | 950 MW | 990 MW | 2905 MW | 1997-11-28 | 2002-08-27 | 2002-09-14 | 2003-01-08 | |
Ling Ao 3 | PWR | CPR-1000 | 1007 MW | 1086 MW | 2905 MW | 2005-12-15 | 2010-06-09 | 2010-07-15 | 2010-09-15 | |
Ling Ao 4 | PWR | CPR-1000 | 1007 MW | 1086 MW | 2905 MW | 2006-6-15 | 2011-02-25 | 2011-05-03 | 2011-08-07 |
See also
References
- ^ "LING AO-1". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
- ^ "LING AO-2". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
- ^ "LING AO-3". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
- ^ "LING AO-4". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
- Chen, Muyang (2024). The Latecomer's Rise: Policy Banks and the Globalization of China's Development Finance. Ithaca and London: Cornell University Press. ISBN 9781501775857. JSTOR 10.7591/jj.6230186.
- "Fuel loading starts at new Chinese reactor". World Nuclear News. 22 April 2010. Retrieved 18 July 2010.
- China Daily (2002-07-04). "Nuke Plant in Ling'ao Cuts Costs". China Internet Information Center. Retrieved 2020-01-04.
- "First power at China's Ling Ao". Nuclear Engineering International. 16 July 2010. Archived from the original on 13 June 2011. Retrieved 17 July 2010.
- "Reactor starts up at Ling Ao II". World Nuclear News. 11 June 2010. Retrieved 18 July 2010.
- "New Ling Ao II unit enters into service". World Nuclear News. 27 September 2010. Retrieved 2 October 2010.
- "Second Ling Ao II unit enters service". World Nuclear News. 8 August 2011. Retrieved 12 December 2012.
- "Nuclear Power in China". www.world-nuclear.org. World Nuclear Association. Retrieved 2019-12-30.
- "Ling Ao-1". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
- "Ling Ao-2". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
- "Ling Ao-3". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
- "Ling Ao-4". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
External links
- Daya Bay and Ling Ao Power Plants Archived 2012-11-27 at the Wayback Machine Has a satellite map.
Nuclear power in China | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Operating power plants | |||||||||||
Power plants under construction | |||||||||||
Planned power plants |
| ||||||||||
Proposed power plants | |||||||||||
Research, experimental and prototype reactors | |||||||||||
Commercial reactor designs | |||||||||||
Organizations |
| ||||||||||
Related categories | |||||||||||