As of 2020, Morocco had an installed wind power capacity of 1400 MW.
As of 2013, there was an installed capacity of 947 MW and 500 MW are under construction.
List of completed farms
Name | Year of completion | Total number of turbines | Capacity (MW) | City | Illustration |
---|---|---|---|---|---|
Midelt Wind Farm | 2021 | 210 MW | |||
Boujdour Aftissat wind farm | 2018 | 201,6 MW | |||
Khalladi (Tangier) wind farm | 2018 | 120 MW | |||
Akhfenir Wind Farm (owned by Nareva) | 2013 | 200 MW | |||
Tarfaya Wind Farm (owned by Nareva) | 2014 | 131 turbines | 301 MW | ||
Ksar sghir - HAOUMA wind farm | 2014 | 50,6 MW | |||
Laaynoune - Foum el oued Farm (owned by Nareva) | 2013 | 50,16 MW | Laâyoune | ||
Laayoune -Ciment du Maroc Farm | 2011 | 5,16 MW | Laâyoune | ||
Tanger – Tanger Farm | 2009 | 165 turbines | 140 MW | ||
Tanger – Dhar Sadane Farm | 2009 | 126 turbines | 75 MW | ||
Essaouira – YNNA Bio Power | 2009 | 20 MW | Essaouira | ||
Tangier – Sendouk Farm | 2008 | 65 MW | |||
Essaouira – Amogdoul Farm | 2007 | 65 MW | Essaouira | ||
Tetouan – Lafarge Wind Farm | 2005 | 32 MW | |||
Tanger-Tetouan (Koudia Al Baida) – Abdelkhalek Torrès Farm | 2000 | 84 turbines | 50 MW |
List of farms under construction
Name | Year of creation | Total number of installations | Capacity (MW) | City | Illustration |
---|---|---|---|---|---|
Laâyoune Farm | 240 MW | Laâyoune | |||
Foum El Oued Farm(owned by Nareva) | 2011 | 200 MW | |||
Taza – Touahar () | 2015 | 150 MW | |||
Tanger – Dar Chaoui | 2012 | 45 turbines | 135 MW | ||
Tanger – YNNA Bio Power | late 2010 | 50 MW |
See also
References
- "Morocco - Countries - Online access - the Wind Power - Wind energy Market Intelligence".
- Wind Power – Morocco Archived 7 January 2017 at the Wayback Machine
- L'initiative 1000 MW
- L’ONEE achève la construction du parc éolien de Midelt d’une capacité de 210 MW
- SAHARA DESERT WIND FARMS: A LEARNING CURVE TO SCALE-UP
- A 30 km de Tanger, le parc éolien Khalladi entre en service
- Parcs Eoliens à réaliser par des opérateurs privés dans le cadre de la Loi 13-09 sur les Energies Renouvelables
- "GDF live at 301MW Tarfaya". Archived from the original on 16 December 2014. Retrieved 16 December 2014.
- GDF SUEZ launches $560mn Morrocan wind farm
- PARC EOLIEN HAOUMA
- Nareva farms
- Hassan El Arif, Ciments du Maroc Indusaha inaugure son parc éolien de Laâyoune, L'économiste, 19 octobre 2011
- ^ "2007 : Lancement de la réalisation de l'unité YNNA Bio Power de production d'énergie renouvelable de 70 Méga Watt". Archived from the original on 23 December 2017. Retrieved 16 December 2014.
- Parcs éolien de Tanger Archived 8 July 2008 at the Wayback Machine
- Extension du parc éolien de Lafarge
- L'énergie éolienne au Maroc
- Développement des énergies renouvelables au Maroc Archived 6 October 2011 at the Wayback Machine
- "Taza : Vers la création d'un parc éolien pour un coût de 2,5 MMDH". www.maghress.com (in French). 25 January 2011. Retrieved 4 May 2021.
- "Les scoops du jour". L'Économiste. 8 March 2011. Archived from the original on 15 March 2012.
- "Energie au Maroc : Une stratégie ambitieuse mise en œuvre". Archived from the original on 16 December 2014. Retrieved 16 December 2014.
External links
Economy of Morocco | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||
|