Misplaced Pages

Lokmanya Tilak Terminus–Gorakhpur Express

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Lokmanya Tilak Terminus-Gorakhpur Express)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Lokmanya Tilak Terminus–Gorakhpur Express" – news · newspapers · books · scholar · JSTOR (May 2015) (Learn how and when to remove this message)

Lokmanya Tilak Terminus – Gorakhpur Express
Overview
Service typeExpress
First serviceFebruary 11, 2015; 9 years ago (2015-02-11)
Current operator(s)Central Railway
Route
TerminiLokmanya Tilak Terminus (LTT)
Gorakhpur Junction (GKP)
Stops19 (2 technical stops)
Distance travelled1,722 km (1,070 miles)
Average journey time33 hours 25 minutes
Service frequencyWeekly
Train number(s)11081 / 11082
On-board services
Class(es)AC 2 Tier, AC 3 Tier, Sleeper Class, Unreserved Second Class
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesNo
Technical
Track gauge1,676 mm (5 ft 6 in)
Operating speed52 km/h (32 mph)

Lokmanya Tilak Terminus- Gorakhpur Weekly Express is a weekly express train service of the Indian Railways, maintained by Central Railway connecting Lokmanya Tilak Terminus in Maharashtra and Gorakhpur Junction of Uttar Pradesh. It is currently being operated with 11081 and 11082 train numbers on weekly basis.

History

It was introduced in 2014's Railway Budget and began operation in 11 February 2015.

Timings

11081 service starts from Lokmanya Tilak Terminus at 04:35 PM on Wednesdays and reaches Gorakhpur Junction at 02:00 AM on Fridays.

11082 service starts from Gorakhpur Junction at 03:50 PM on Fridays and returns to Lokmanya Tilak Terminus at 11:45 PM on Saturdays.

Halts

11081/11082 Lokmanya Tilak Terminus - Gorakhpur Weekly Express
Halts Additional Information
Lokmanya Tilak Terminus Source
Kalyan Jn
Kasara Technical Halt for Banker Attachment
Igatpuri Technical Halt for Banker Detachment
Nashik Road
Bhusaval Jn
Khandwa Jn
Itarsi Jn
Pipariya
Narsinghpur
Jabalpur Jn
Katni Jn
Maihar
Satna Jn
Manikpur Jn
Prayagraj Chheoki Jn
Mirzapur
Varanasi Jn Rake Reversal
Aunrihar Jn
Mau Jn
Bhatni Jn
Deoria Sadar
Gorakhpur Jn Destination

Coach Composition

This train service consists of 22 LHB coaches, consisting of:

  • 1 AC Two Tier
  • 7 AC Three Tier
  • 9 Sleeper Class
  • 3 General Second Class
  • 2 Luggage Brake and Generator Van

11081 and 11082 train service is operated using one rake, in a rake sharing arrangement (RSA) with 12143 / 12144 Mumbai LTT - Sultanpur Express. The rake is maintained by Lokmanya Tilak Terminus coach depot.

Sources

  1. Harshal11041. "11081/Mumbai LTT - Gorakhpur Weekly Express (Via Varanasi) (PT) - Mumbai LTT to Gorakhpur CR/Central Zone - Railway Enquiry". indiarailinfo.com. Retrieved 7 August 2024.{{cite web}}: CS1 maint: numeric names: authors list (link)
  2. "Railway Budget Speech 2014-15" (PDF). English - Railway Budget Speech 2014-15.pdf.
Categories: