Misplaced Pages

Mildura railway line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Maryborough V/Line rail service) Railway line in Victoria, Australia

Mildura
Overview
Other name(s)Yelta
StatusOperational
OwnerVicTrack
LocaleVictoria, Australia
Termini
Service
TypeHeavy rail
ServicesMaryborough
Operator(s)Passenger: V/Line
Freight: Pacific National
History
Commenced1874 (1874)
Completed1903 (1903)
Closed for gauge conversionAugust 2017 (Yelta-Maryborough)
ReopenedFebruary 2018 (Yelta-Maryborough)
Technical
Line length474.4 km (294.8 mi)
Number of tracks1
Track gauge
  • 1,435 mm (4 ft 8+1⁄2 in) standard gauge between Yelta and Maryborough
  • 1,600 mm (5 ft 3 in) between Maryborough and Ballarat
Old gauge1,600mm (5 ft 3 in) broad gauge (Maryborough-Yelta)
Mildura line
Legend
km0
588.2 Yelta
583.7 Merbein West
579.0 Merbein
567.8 Mildura
561.1 Irymple
553.5 Red Cliffs
Morkalla line
551.2 Yatpool
536.6 Carwarp
528.3 Boonoonar
Millewa South line
528.3 Nowingi
501.5 Hattah
489.0 Trinita
475.9 Kiamal
467.3 Ouyen
Pinnaroo line
459.0 Nunga
453.0 Bronzewing
443.4 Gypsum
434.9 Tempy
428.4 Speed
421.6 Turiff
410.9 Gama
402.2 Lascelles
390.6 Woomelang
380.3 Watchpuga
368.9 Curyo
363.5 Kinnabulla
348.0 Birchip
336.1 Morton Plains
328.3 Watchem
319.8 Massey
311.2 Litchfield
302.8 Buloke
296.1 Donald
284.0 Cope Cope
276.4 Swanwater
268.9 Sutherland
257.7 St Arnaud
245.8 Caraporee
236.2 Emu
224.1 Bealiba
211.1 Goldsborough
Robinvale line
204.6 Dunolly
↑ standard gauged in 2018
↓ dual gauged in 1996
197.3 Bet Bet
194.6 Havelock
189.4 Simson
Moolort line
182.5 Maryborough
Avoca line to Ararat
dual gauge under construction
174.8 Daisy Hill
168.4 Talbot
151.0 Clunes
146.3 Tourello
Daylesford line
134.9 North Creswick
133.0 Creswick
128.4 Bald Hills
125.3 Sulky
Waubra line
123.6 Waubra Junction
North Ballarat Junction
Serviceton line
ServicetonMelbourne

broad gauge
standard gauge
dual gauge

The Mildura railway line is a heavy rail line in northwestern Victoria, Australia. The line runs from Yelta station to Ballarat station via the settlements of Mildura, Ouyen and Maryborough in an approximate south-southeasterly direction. Initial sections of the line opened from Ballarat in 1874 and the line reached Mildura in 1903.

The line is primarily utilised by freight services. V/Line passenger services also operate on the line between Maryborough and Ballarat.

History

Maryborough station

The Mildura line was opened from Ballarat to Creswick, Clunes, Maryborough and Dunolly in 1874 and 1875, and extended to St Arnaud in 1878, Donald in 1882, Birchip in 1893, Woomelang in 1899, Ouyen, Red Cliffs and Mildura in 1903, Merbein in 1910 and Yelta in 1925.

A line was opened from Ballarat to Waubra in the 1880s. It closed in the 1960s.

A branch line was built from North Creswick to Daylesford in 1887, connecting with the line from Carlsruhe. It had stations at Broomfield, Allendale, Newlyn, Rocklyn, Wombat, Leonard, Sailor's Falls and Woodburn. This line closed in 1953.

A line was opened from Maryborough to connect with the Melbourne–Bendigo line at Castlemaine in 1874. This line has been partly dismantled, with only the section from Castlemaine to Maldon Junction still in use, as part of the Castlemaine to Maldon Victorian Goldfields Railway.

Another branch line was opened from Maryborough to Avoca in 1876 and Ben Nevis and Ararat in 1890. This line was closed in 1959, reopened in 1966, standardised in 1996 and closed again in 2005. It was then reopened to regular traffic in 2019 as part of the Murray Basin Rail Project. The Navarre line opened from Ben Nevis to Navarre in 1914 and it was closed in 1954.

A line was opened from Dunolly to Inglewood in 1888, connecting with the BendigoBoort line, completed in 1883.

Mildura station

The Pinnaroo line (Victoria) opened from Ouyen to Murrayville in 1912 and the South Australian border in 1915, connecting with the Pinnaroo line (South Australia) to Pinnaroo and Tailem Bend. The Genesee & Wyoming Australia line west of Pinnaroo was standardised in 1998 creating a break-of-gauge. Nevertheless, it is proposed to standardise the line from Geelong to Mildura and the line between Ouyen and Pinnaroo. In 2006, state and federal money was announced to upgrade the line to Mildura with gauge convertible sleepers. However, this upgrade will still leave the passenger service in limbo.

The Morkalla line was completed from Red Cliffs to Meringur in the 1920s and extended to Morkalla in the 1930s. This line closed in the 1980s. A 2 km section of the line near Red Cliffs has been converted to a 610 mm-gauge steam railway, operated occasionally by the Red Cliffs Historical Steam Railway (see Victorian Tourism).

In 1923, a series of sidings were placed between the Mildura station and the wharves on the Murray River. These included a zig zag section to enable trains to travel between the different elevations. These sidings were removed in 1973.

A passenger service was provided by V/Line with three weekly overnight services from Melbourne (known as The Vinelander), including sleeping cars, until 1993 when it was discontinued by the Kennett Government. The former Bracks/Brumby Governments promised to re-open this line to passenger traffic as part of their pledges for the 1999, 2002 and 2006 elections. They also pledged the reopening of Clunes station in the 2010 election.

In December 2007 work began on upgrading the line between Gheringhap (on the Geelong–Ballarat line) and Mildura, at a cost of $73 million and involving one in every two sleepers being replaced, and lifting maximum train speeds to 80 km/h (50 mph). Current speeds are restricted to 50 km/h on one-third of the track and are as low as 30 km/h in some sections. In April 2008 it was announced that the Mildura–Yelta section of the line would also be upgraded, as part of the Victorian core grain network in a $23.7 million package with 6 other lines.

As part of upgrades for the return of Maryborough passenger services, the crossing loops at Sulky, Tourello and Talbot stations have been removed, resulting in only one train at a time being able to use the 60 kilometres of line between Ballarat and Maryborough. The loop at Sulky was removed on 12 February, the loop at Talbot on 24 February.

In October 2010, the Victorian government released a report into public transport improvement options for the north-west of Victoria, outlining nine proposals for public transport projects. Options discussed include the return of passenger trains on the existing line, or via an extension of the Yungera line to connect to the Mildura line at Ouyen.

Passenger services were reintroduced from Ballarat to Maryborough in July 2010, after a 17-year absence.

The line closed in August 2017 north of Dunolly for conversion to standard gauge as part of the Murray Basin Rail Project. It reopened gradually from February 2018 with maximum axle load lifted to 21 tonnes and line speed increased to 80 km/h.

Despite reopening to passenger traffic in 2010, the line has continued to have very low patronage figures across all the stations on the Maryborough Line. Creswick and Talbot Railway Stations served less than 400 passengers a year in the 2020–2021 patronage figures, down from only 1,000 prior to the Covid-19 Pandemic. Clunes Station also records less than 1,000 annual passenger movements. The terminus of the current passenger services, Maryborough, serves approximately 3,600 passenger per year. In 2018–19 however, Maryborough had patronage figures of around 9,350 per annum or 25 passengers per day. There has been on-going discussions about the viability of the railway service to Maryborough with such low patronage on all stations along the branch line.

Services

The main freight traffic on the line is export grain and containerised wine, grapes, citrus, dried fruit and juice, totalling around 1.5 million tonnes per year. Containers are dispatched to Melbourne from a terminal at Merbein (a short distance north of Mildura) operated by Seaway Intermodal, which handles approximately 13,000 export containers a year, as well as 500 import containers. Cement was also despatched to Mildura from Waurn Ponds until 2015, oil and less than container load (LCL) freight were carried until 2007. A freight terminal also exists at Donald, and grain services run as required.

Maryborough services

Maryborough V/Line rail service
Legend
h:mm
0:00 0.0 km Southern Cross Zone 1
0:07 5.6 km Footscray Zone 1
0:12 12.3 km Sunshine Zone 1/2
0:16 15.1 km Ardeer Zone 2
0:18 17.9 km Deer Park Zone 2
0:23 21.2 km Caroline Springs Zone 2
0:28 30.2 km Rockbank Zone 2
34.3 km Cobblebank Zone 2
0:33 41.3 km Melton Zone 2
0:45 52.9 km Bacchus Marsh Zone 2
1:02 79.5 km Ballan Zone 4
1:24 113.8 km Ballarat Zone 8
Ararat V/Line rail service
1:44 132.9 km Creswick Zone 9
1:56 151.1 km Clunes Zone 11
2:08 168.3 km Talbot Zone 13
2:22 182.5 km Maryborough Zone 14
Some timetabled journey to Southern Cross.
Most services run between Ballarat and Maryborough only.


In December 2008 as part of the Victorian Transport Plan the state government announced that V/Line rail passenger services would be extended from Ballarat to Maryborough station at a cost of $50 million, commencing 25 July 2010. Initially Creswick was to be the only intermediate station, until June 2010 when the government announced $7 million in funding to also reopen Clunes. Talbot also reopened in December 2013.

Two services on weekdays and one service on weekends in each direction operate as a shuttle between Maryborough and Ballarat, stopping at all operating stations. At Ballarat, all terminating services connect to an Ararat or Ballarat service towards Melbourne, and all originating services bound for Maryborough connect to a service from Melbourne.

See also

References

  1. "Mildura's Riverfront Railways" Australian Railway Historical Society Bulletin February 1978 pages 33–38
  2. "The Mildura Story The Battle of the Routes" (PDF). Royal Historical Society of Victoria. Archived from the original (PDF) on 19 July 2008. Retrieved 30 August 2008.
  3. "WORKS BEGIN ON MILDURA RAIL FREIGHT UPGRADE". minister.infrastructure.gov.au. Archived from the original on 24 July 2008. Retrieved 27 April 2008.
  4. "Roads, ports and freight – Mildura Rail Freight Upgrade – Frequently asked questions". doi.vic.gov.au. Archived from the original on 26 July 2008. Retrieved 27 April 2008.
  5. "$43m to upgrade rail freight lines". business.theage.com.au. Archived from the original on 6 December 2012. Retrieved 27 April 2008.
  6. V/Line Weekly Notice: "NORTH BALLARAT – MARYBOROUGH. TOURELLO LOOP ABOLISHED LEVEL CROSSING UPGRADES"
  7. "Signalling and Infrastructure" Railway Digest May 2010 page 56
  8. "Victorian Government press release—"NORTH WEST PUBLIC TRANSPORT REVIEW REPORT RELEASED", 13 October 2010". Archived from the original on 21 October 2010. Retrieved 1 November 2010.
  9. "North West Public Transport Review". Archived from the original on 21 October 2010. Retrieved 1 November 2010.
  10. "V/Line Annual Report 2009-2010" (PDF). V/Line Pty Ltd. September 2010. p. 7. Archived (PDF) from the original on 27 February 2011. Retrieved 2 July 2011.
  11. "Transport Projects – Maryborough Rail Services". Department of Transport website. Department of Transport. Archived from the original on 7 January 2010. Retrieved 2 July 2011.
  12. Probert, Oliver (1 August 2017). "Murray Basin upgrades begin". Rail Express. Archived from the original on 21 January 2021. Retrieved 18 February 2018.
  13. DiFabrizio, Michael (14 February 2018). "Birchip stretch in train". Sunraysia Daily. Archived from the original on 13 February 2018. Retrieved 18 February 2018.
  14. "VLine Station Patronage 2013-2021.xlsx". Google Docs. Archived from the original on 10 March 2022. Retrieved 10 March 2022.
  15. "Roads, ports and freight – Intermodal terminals". doi.vic.gov.au. Archived from the original on 4 June 2009. Retrieved 1 August 2008.
  16. "Rail and Road – Seaway". www.seaway.com.au. Archived from the original on 11 February 2022. Retrieved 22 February 2022.
  17. "Melbourne–Mildura Corridor Strategy" (PDF). Building our National Transport Future. Department of Transport and Regional Services. June 2007. Archived from the original (PDF) on 27 October 2009. Retrieved 3 November 2009.
  18. "Wongm's Rail Gallery – Mildura freight". wongm.railgeelong.com. Archived from the original on 27 October 2009. Retrieved 3 November 2009.
  19. "Maryborough Rail Extension Projects". Victorian Transport Plan. www4.transport.vic.gov.au. Archived from the original on 26 December 2008. Retrieved 8 December 2008.
  20. "Maryborough Rail Services". Victorian Transport Plan. transport.vic.gov.au. Archived from the original on 7 January 2010. Retrieved 5 July 2010.
  21. KIM STEPHENS (7 October 2009). "Call to explain Clunes' omission from rail plan". The Courier. thecourier.com.au. Archived from the original on 4 October 2011. Retrieved 15 June 2010.
  22. EMMA BROWN (11 October 2009). "No plans for Clunes train". The Courier. thecourier.com.au. Archived from the original on 13 October 2009. Retrieved 15 June 2010.
  23. "READY FOR TOMORROW: $19 MILLION TO RETURN PASSENGER RAIL TO CLUNES AND IMPROVE NORTH-WEST FREIGHT RAIL LINKS". Media Release: Premier of Victoria. premier.vic.gov.au. June 2010. Archived from the original on 18 June 2010. Retrieved 15 June 2010.
  24. "Tiny Talbot back on track: train service to resume 20 years after stopping". Australian Broadcasting Corporation. Archived from the original on 24 May 2022. Retrieved 24 May 2022.

External links

Victoria (state) Railway lines in Victoria
Main lines
Branch lines
Metropolitan District
Western & Southwestern District
Northern & Midland District
North Eastern District
Eastern District
Narrow gauge branch lines
Cross country lines
V/Line services
Metro Trains Melbourne services
Major pieces of shared infrastructure
Tourist railways
Operational
Former
flag Victoria portal
Public transport in regional Victoria
Regional Bus
Operators
Regional train
Operator
Services
Rolling stock
Infrastructure
Lists
Regional Coach
Operators
Ferries
Operator
Other
  • Italics denotes services yet to commence
Categories: