Merritt 7 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
View of the new platform opened in June 2023 | ||||||||||||
General information | ||||||||||||
Location | Glover Avenue Norwalk, Connecticut | |||||||||||
Coordinates | 41°08′53″N 73°25′40″W / 41.14803°N 73.42768°W / 41.14803; -73.42768 | |||||||||||
Owned by | Connecticut Department of Transportation | |||||||||||
Operated by | Connecticut Department of Transportation | |||||||||||
Platforms | 1 side platform | |||||||||||
Tracks | 1 | |||||||||||
Connections | Norwalk Transit District: Route 7 Link | |||||||||||
Construction | ||||||||||||
Parking | 88 spaces | |||||||||||
Accessible | Yes | |||||||||||
Other information | ||||||||||||
Fare zone | 41 | |||||||||||
History | ||||||||||||
Opened | July 29, 1985 | |||||||||||
Rebuilt | September 2020–June 7, 2023 | |||||||||||
Passengers | ||||||||||||
2018 | 181 daily boardings | |||||||||||
Services | ||||||||||||
| ||||||||||||
|
Merritt 7 station is a commuter rail stop on the Danbury Branch of the Metro-North Railroad's New Haven Line, located in Norwalk, Connecticut. Merritt 7 is named after an adjacent business park based near the interchange of the Merritt Parkway and Route 7. The station has one high-level 6-car long side platform to the west of the single track. It is owned and operated by the Connecticut Department of Transportation (ConnDOT).
History
The Merritt 7 corporate park built the station while separating the station from building entrances by a fence to make the complex transit adjacent but not transit-oriented. The station was opened on July 29, 1985, by Metro-North. At the time of its opening, it was the only privately built rail station in Connecticut. Construction of the station cost $750,000.
The station was rebuilt with a 510-foot (160 m) six-car-long high-level platform on the west side of the tracks, slightly north of the former station. The new station has a full-length canopy and an accessible pedestrian overpass with elevators. The state authorized funding for the project in 2017. Bidding took place in April–June 2020; construction began that September. The new platform opened on June 7, 2023, but the opening of the footbridge over the tracks to the office park was delayed due to supply chain issues with glass panels, which opened on January 12, 2024.
References
- ^ Office of Rail, Bureau of Public Transportation (January 2007). "New Haven Line Train Station Visual Inspection, Summary Report" (PDF). Connecticut Department of Transportation.
- Urbitran Associates Inc. (July 2003). "Task 2: Technical Memorandum parking Inventory and Utilization: Final Report" (PDF). Connecticut Department of Transportation. Table 1: New Haven Line Parking Capacity and Utilization, Page 6. Archived from the original (PDF) on July 12, 2007.
- ^ Charles, Eleanor (July 28, 1985). "Rail Station For Corporate Park". The New York Times. p. CN11. Retrieved June 13, 2023.
- Metro-North 2018 Weekday Station Boardings. Metro-North Railroad Market Analysis/Fare Policy Group. April 2019. p. 6.
- Connecticut Department of Transportation January 2007 Visual Inspection Report
- Guenther Chapman, Nancy (February 2, 2017). "Merritt 7 train station construction funded by state". Nancy on Norwalk.
- ^ Dylan, Jonah (March 20, 2023). "Opening of new train station at Norwalk's Merritt 7 stop delayed until summer, CTDOT says". New Haven Register. Retrieved March 23, 2023.
- "State Contracting Portal Solicitation Details". State of Connecticut. June 17, 2020.
- Lutge, Katherine (July 23, 2023). "Pedestrian bridge at Merritt 7 train station in Norwalk delayed by supply chain; new platform opens". The Hour. Retrieved July 24, 2023.
- Ludge, Katherine (January 12, 2024). "Footbridge bridge at Merritt 7 train station opens to public: 'Much-needed pedestrian connection'". The Hour. Hearst Communications. Retrieved January 13, 2024.
External links
Media related to Merritt 7 station at Wikimedia Commons
- Metro-North station page for Merritt 7
- List of upcoming Metro-North train departure times and track assignments from MTA