Misplaced Pages

Mirama–Kikagati–Nsongezi High Voltage Power Line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
High voltage power line in Uganda

Mirama–Kikagati–Nsongezi High Voltage Power Line
Location
CountryUganda
Coordinates01°02′33″S 30°40′10″E / 1.04250°S 30.66944°E / -1.04250; 30.66944
General directionWest to East
FromMirama Hills, Uganda
Passes throughKikagati, Uganda
ToNshugyezi, Uganda
Ownership information
OwnerGovernment of Uganda
OperatorUganda Electricity Transmission Company Limited
Construction information
Construction started2022 Expected
ExpectedCommissioning 2023 Anticipated
Technical information
Type of currentAC
Total length38 km (24 mi)
AC voltage132kV
No. of circuits2

The Mirama–Kikagati–Nsongezi High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Mirama Hills, in the Western Region of Uganda, to another high voltage substation at Kikagati Hydroelectric Power Station and continues to end at Nshungyezi Hydropower Station.

Location

The 132 kilo Volt power line starts at the Uganda Electricity Transmission Company Limited (UETCL) 132kV substation at Mirama Hills, Ntungamo District, in Uganda's Western Region. The power line travels in a general easterly direction to Kikagati Hydroelectric Power Station, in Kikagati, Isingiro District, a road distance of approximately 36 kilometres (22 mi). From there, the power line takes a general northeasterly direction to end at Nshungyezi Hydroelectric Power Station, a distance of about 13 kilometres (8 mi), as the crow flies, but is approximately 31 kilometres (19 mi) by road from Kikagati. Due to the steep terrain, the power line does not always follow the winding road. The line measures only 38 kilometres (24 mi), from Mirama Hills to Nshungyezi.

Overview

The power line is being developed to evacuate the 16 megawatts of electricity generated at Kikagati Hydroelectric Power Station and the 39 megawatts generated at Nshungyezi Power Station and transmit it to Mirama Hills, for integration into Uganda's national electricity grid.

Associated power infrastructure

As of August 2020, Kikagati Power Station is under construction at a contract price of US$88 million and an anticipated completion date of 2021. The project received US$12.3 million partial funding from the Uganda GET Fit Program.

Nshungyezi Power Station is a proposed 39 megawatts hydroelectric power station planned on the Kagera River, approximately 13 kilometres (8 mi), downstream of Kikagati Power Station. The development rights are owned by Maji Power Limited, a subsidiary of Berkeley Energy.

Cost and construction

The power line and associated infrastructure developments are budgeted at US$33.4 million. As of August 2020, construction has not started. It was anticipated that by 2022, the power line would be in operation. Uganda Electricity Transmission Company Limited will own and operate the completed power transmission line. The project received partial funding from the government of Norway.

See also

References

  1. ^ Uganda Electricity Transmission Company Limited (March 2018). "The Status of Power Transmission Projects As of March 2018" (PDF). Kampala: Uganda Electricity Transmission Company Limited. Retrieved 16 August 2020.
  2. "Road Distance Between Mirama Hills And Kikagati" (Map). Google Maps. Retrieved 16 August 2020.
  3. "Road Distance Between Kikagati And Nshungyezi" (Map). Google Maps. Retrieved 16 August 2020.
  4. "GET Fit Uganda: Annual Report 2019: Kikagati Hydropower Project". Kampala: GET Fit Uganda. May 2020. p. 40. Retrieved 16 August 2020.
  5. African Power Platform (16 August 2020). "Nshungyezi Power Station". Nairobi: African Power Platform Organization. Retrieved 16 August 2020.
  6. Global Transmission Report (17 June 2020). "Ugandan Transmission Sector: On its path to attract private investments". New Delhi, India: Global Transmission Report. Retrieved 16 August 2020.

External links


01°02′33″S 30°40′10″E / 1.04250°S 30.66944°E / -1.04250; 30.66944

Categories: