Safe drinking water project in Telangana, India

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Mission Bhagiratha" – news · newspapers · books · scholar · JSTOR (July 2024) (Learn how and when to remove this message)
Mission Bhagiratha
Type of projectSafe drinking water
LocationTelangana, India
FounderGovernment of Telangana
Chief MinisterK.Chandrashekhar Rao
MinistryTDWSCL
Established6 August 2016 (2016-08-06)
Budget₹43,791 crores
StatusActive
WebsiteOfficial website

Mission Bhagiratha is a safe drinking water project for every village in Telangana State, with a budget of ₹43,791 crores. The project aims to provide piped water to 2.32 crore people in 20 lakh households in urban and 60 lakhs in rural areas of Telangana. The project will supply clean drinking water to all households in the state through water sourced from the River Godavari (53.68 TMC) and the River Krishna (32.43TMC). The bulk supply is expected to be completed by May 2018, and intra-village, intra-locality works will be completed by December 2018.

History

That project is named for King Bhagiratha, who, according to myth, brought the River Ganga to Earth from the heavens.

The inspiration for the project was driven by the residents who relied on contaminated groundwater. In drought-prone Nalgonda district, 973 villages faced high fluoride content that leads to disease and fluorosis.

A similar project, Maneru Manchineella Pathakam, was conceived and completed by K.C.R, when he was MLA for Siddipet Assembly Constituency in 1996-97, at a cost of ₹100 crores. The water was sourced from Lower Manair Dam and supplied to all households in 180 villages across Siddipeta constituency. The Chief Minister vowed in 2016 that he would not seek votes in 2019 if the water project was not completed by 2018. The project was completed successfully. It received an award from the Central Jal Shakti Minister Gajendra Singh Shekhawat in Rajya Sabha that Telangana is the only state in India providing piped water for every house hold in the state.

The project was launched by the Prime Minister of India, Narendra Modi at Komatibanda village, Medak district in Gajwel constituency on 6 August 2016. The other dignitaries were, the Chief Minister of Telangana, K Chandrashekar Rao.

Technical feasibility study

The central government-owned, Water and Power Consultancy Services (WAPCOS) has vetted DPRs, Monitoring, Supervision, and Quality Control of TDWSP works.

The technical feasibility and design was done by irrigation officials. Indian Institute of Science (IISc), Indian Water Works Association, a foremost expert on a piped network, Dr. Srinivasa Lingireddy of Civil Engineering at the University of Kentucky, who has over 20 years of experience in pipe network modeling was consulted for the project. Lea Associates (LASA) prepared the tender process.

Project

The project is divided into 26 segments, comprising 25,000 habitations, at an estimated cost of ₹42,853 crores,for which the state government has taken a loan of ₹32,000 crores. The Krishna and Godavari rivers and existing reservoirs will be interlinked to collect, reserve and supply treated drinking water in the state, to every household in over 25,000 villages and 65 towns. The target is to provide 100 liters drinking water per person in rural areas, and 150 liters per person in urban areas. Around 4 TMC is planned for industrial use. The project required 13,000 permissions from various departments like railways, defense, national highways, forest, irrigation, panchayat raj, roads and buildings.

Telangana Drinking Water Supply Corporation (TDWSCL) was established by the government to implement Mission Bhagiratha. 59 overhead and ground-level tanks are available. 40 TMC water is sourced from tanks and reservoirs, the areas range from 100 acres to 10,000 acres.

The piping system runs through 1.697 lakh kilometers. The electricity required is 182 megawatts.

Maintenance

The project Contractor is to take care of the maintenance of the entire water network for 10 years, at no additional cost to the government.

Water purification

The 150 water treatment plants, 62 pumping stations, 35,573 Overhead service reservoirs, 27 intake wells are set up. The electric motors and pumping systems were sourced from BHEL with advanced technology.

See also

References

  1. "Mission Bhagiratha is a year ahead of the deadline, says Irrigation Minister". The Hindu. 2 February 2018. Retrieved 20 February 2020.
  2. ^ "MISSION BHAGIRATHA". missionbhagiratha.telangana.gov.in.
  3. "Mission Bhagiratha water by March first week".
  4. "Narendra Modi launches Mission Bhagiratha in maiden Telangana visit". mint. 7 August 2016.
  5. "Help for Mission Bhagiratha". 24 June 2016 – via www.thehindu.com.
  6. "Telangana borrowed Rs 32,000 crore to fund Mission Bhagiratha". The Times of India. 6 February 2023. ISSN 0971-8257. Retrieved 6 June 2023.
  7. Chronicle, Deccan (29 January 2018). "Telangana: Bhagiratha grows with drinking water projects". Deccan Chronicle.