Misplaced Pages

Ngozi Geothermal Power Station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Geothermal power plant in Tanzania
This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (January 2022)

Ngozi Geothermal Power Station
Location of Ngozi Geothermal Power Station
LocationNgozi, Mbeya Region, Tanzania
Coordinates08°57′54″S 33°26′01″E / 8.96500°S 33.43361°E / -8.96500; 33.43361
StatusUnder construction
Commission date2025 (Expected)
Construction costUS$821 million (Budgeted)
OwnerNgozi Geothermal Consortium
Power generation
Nameplate capacity200 MW (270,000 hp)
[edit on Wikidata]

The Ngozi Geothermal Power Station is a planned 200 MW (270,000 hp) geothermal power plant in Tanzania, which is expandable to 600 MW (800,000 hp) in future.

Location

The facility is located in the Ngozi Crater, approximately 20 kilometres (12 mi), south of the city of Mbeya, where the headquarters of Mbeya Region are located. The coordinates of Ngozi Crater are: 09°00'30.0"S, 33°33'11.0"E (Latitude:-9.008333; Longitude:33.553056).

Overview

Tanzania Geothermal Development Company (tGDC), a company wholly owned by the Tanzanian power utility company, Tanesco, is in the process of drilling geothermal wells in the Ngozi Crater, whose total capacity can generate up to 200 MW (270,000 hp) of electric energy. TGDC will sell the steam to a consortium comprising the Government of Tanzania, a strategic investor and one or more development partners.

The consortium will then generate electricity from the steam at this power station. The electricity will be sold to the Tanzania Electric Supply Company Limited, for integration in the Tanzania national grid. In phase I of development the power station will start with generating capacity of 200 megawatts, which will be stepped up to 600 megawatts in phase II.

Cost and funding

The Tanzanian government has budgeted US$821 million for the development of this power station up to 600 megawatt capacity. During the exploration phase, US$21.73 million was spent on preliminary studies. Of that, the Climate Investment Fund loaned US$5 million and the African Development Bank granted $16.73 million.

See also

References

  1. Jean Marie Takouleu (29 September 2019). "Tanzania: Ngozi geothermal power plant construction to start in 2021". Paris, France: Afrik21.africa. Retrieved 10 March 2021.
  2. "Road Distance Between Lake Ngozi Crater, Tanzania And Mbeya, Tanzania". Retrieved 10 March 2021.
  3. "Location of Ngozi Crater, Mbeya Region, Tanzania" (Map). Google Maps. Retrieved 10 March 2021.
  4. ^ Jean Marie Takouleu (8 March 2021). "Tanzania: TGDC's plan to produce 200 MWe of geothermal energy by 2025". Paris, France: Afrik21.africa. Retrieved 10 March 2021.
  5. Jean Marie Takouleu (13 October 2019). "Tanzania: Ngozi's geothermal project will require a $821 million investment". Paris, France: Afrik21.africa. Retrieved 10 March 2021.
  6. Babalwa Bungane (20 July 2017). "Tanzania is set to develop Ngozi geothermal steam field". Rondebosch, South Africa: ESI-Africa. Retrieved 10 March 2021.

External links

Categories: