Misplaced Pages

Barrow County Airport

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Northeast Georgia Regional Airport) Airport
Barrow County Airport
Aerial view, November 2005
Summary
Airport typePublic
OwnerBarrow County Airport Authority
ServesWinder, Georgia
Elevation AMSL934 ft / 285 m
Coordinates33°58′58″N 083°40′03″W / 33.98278°N 83.66750°W / 33.98278; -83.66750
Websitewww.WDRairport.com
Runways
Direction Length Surface
ft m
5/23 3,607 1,099 Asphalt
13/31 5,202 1,586 Asphalt
Statistics (2022)
Aircraft operations50,000
Based aircraft115
Sources: FAA and airport website

Barrow County Airport (IATA: WDR, ICAO: KWDR, FAA LID: WDR) is a public use airport located three nautical miles (6 km) east of the central business district of Winder, a city in Barrow County, Georgia, United States. It is owned by the Barrow County Airport Authority. This airport is included in the National Plan of Integrated Airport Systems for 2011–2015, which categorized it as a general aviation facility.

The airport was previously known as Northeast Georgia Regional Airport and prior to December 2005 it was known as Winder-Barrow Airport. It is home to Dragonfly Aviation, and the 148th medical company (air ambulance) of the Georgia Army National Guard.

Facilities and aircraft

Barrow County Airport covers an area of 374 acres (151 ha) at an elevation of 934 feet (285 m) above mean sea level. It has two asphalt paved runways: 13/31 is 5,202 by 100 feet (1,586 x 30 m) and 5/23 is 3,607 by 100 feet (1,099 x 30 m) Runway 13/31 has an instrument landing system.

For the 12-month period ending December 31, 2022, the airport had 50,000 aircraft operations, an average of 137 per day: 90% general aviation and 10% military. At that time there were 115 aircraft based at this airport: 86 single-engine, 19 multi-engine, 2 jet, 3 helicopter, and 5 military.

See also

References

  1. ^ FAA Airport Form 5010 for WDR PDF. Federal Aviation Administration. Effective October 5, 2023.
  2. "Barrow County Airport (official site)".
  3. "2011–2015 NPIAS Report, Appendix A" (PDF). National Plan of Integrated Airport Systems. Federal Aviation Administration. October 4, 2010. Archived from the original (PDF, 2.03 MB) on 2012-09-27.
  4. "History". Barrow County Airport.

External links

Airports in Georgia (U.S. state)
Primary
Relief
General aviation
Military
Categories: