Norwich Power Stations
CountryUnited Kingdom
LocationNorwich, Norfolk
Coordinates52°37′15″N 01°19′06″E / 52.62083°N 1.31833°E / 52.62083; 1.31833
StatusDecommissioned and Demolished
Commission dateDuke Street: 1893
LP station: 1926
HP station: 1937
Gas turbine: 1964
Decommission dateLP: 1967
HP: 1975
Gas turbine: 1986
Construction costDuke Street 1890 capital of £50,000
OwnersNorwich Electricity Company Limited
(1890–1902)
Norwich Corporation Electricity Works
(1902–1948)
British Electricity Authority
(1948–1955)
Central Electricity Authority
(1955–1957)
Central Electricity Generating Board
(1958–1986)
OperatorAs owner
Thermal power station
Primary fuelCoal, Fuel oil (gas turbines)
Turbine technologySteam engines and steam turbines. Open cycle gas turbines
ChimneysDuke Street: 1. LP/HP: 1. Gas turbine: 2
Cooling towersNone
Cooling sourceRiver water
Combined cycle?No
Cogeneration?No
Power generation
Units operationalLP: 42.5 MW. HP: 31 MW. Gas turbine: 2 x 55 MW
Units decommissionedAll
Nameplate capacityDuke Street 180 kW. LP: 40 MW. HP: 30 MW. Gas turbine: 110 MW
Annual net outputSee graphs in text
[edit on Wikidata]

The Norwich power stations were a sequence of electricity generating stations that provided electric power to the City of Norwich and the wider area between 1893 and 1986. The first station in Duke Street began operating in 1893, a new power station at Thorpe was in service from 1926 to 1967, this was supplemented with a 'high pressure' station, 1937–1975, and finally a gas turbine station operated from 1964–1986.

History

Norwich was first lit by electric lighting in 1881. R.E. Crompton and Company lit the Market Place with two arc lights. Later that year the Norwich Fisheries Exhibition was lit with 9 arc lights and 60 incandescent lamps. The lighting system, at a cost of £400, was expanded across the city supplied from a generating station behind St. Andrew’s Hall on Elm Hill. This facility comprised a 20 horsepower (14.9 kW) twin cylinder steam engine driving six Crompton-Burgin dynamos. Four dynamos supplied a total of 20 arc lights in Haymarket, Market Place, Bank Plain, Post Office Plain, St. Andrew’s Hall, London Street and Prince of Wales Road as far as the railway station. Another of the dynamos supplied 50 incandescent lamps in the Free Library, the sixth dynamo was a spare. The system operated for about a year, but like many early electric lighting schemes in Britain, was uneconomic compared to gas lighting to which the city reverted in March 1883.

Duke Street Station

The local businessman Jeremiah Colman lit his Carrow Road mustard factory by electricity from about 1890, and began a public lighting supply in the local area. The Norwich Electricity Company Limited (sometimes referred to as the Norwich Electrical Supply Company or the Norwich Electric Light Company) was founded in 1890 and purchased land at Duke’s Wharf off Duke Street immediately south of, and adjoining, the River Wensum (52°37’54"N 1°17’34"E). The Company’s founding directors were G.F. Buxton, A.R Chamberlain, I.B. Coaks, R.J. Colman, Sir C.R. Gilman, and F.W. Harmer (Chairman). The Company raised a capital of £50,000 through the sale of £10 shares.

A power station was built to the designs of Edward Boardman and the electricity supply started on 3 August 1893. The station faced Duke Street with the boiler house adjacent to the river, there was a coal yard adjoining the river to the west of the site for the delivery of coal by barge. The power station initially comprised three 100 horsepower (74.6 kW) steam engines and dynamos generating 180 kW of direct current. Electricity was distributed through bare copper wires in sealed sanitary drain pipes. Industry was supplied with 220 V DC and domestic consumers 110 V DC. Among the industrial users were Norwich Electric Tramways that served the city from July 1900 until December 1935.

In 1897 the plant had a generating capacity of 850 kW and the maximum load was 750 kW. A total of 602.2 MWh of electricity was sold which powered 38,000 lamps, this provided an income to the company of £11,005-127.

As demand for electricity grew so further expansion took place: a new engine room and a boiler house were built in 1900 to house the new generators. By 1903 there were 13 machines ranging from 100 to 700 horsepower (74.7 to 522 kW); they were supplied with steam from Babcock and Wilcox coal-fired boilers.

The Norwich Corporation (Electricity & Co.) Act 1902 authorised the transfer of the electricity undertaking to the Norwich Corporation and an Electricity Committee was established to manage electricity supplies. The electricity undertaking was then known as the Norwich Corporation Electricity Works.

In 1912 mechanised boiler stokers were introduced and the steam engines began to be replaced with steam turbines of up to 1,000 horsepower (746 kW) driving 500 kW dynamos. In 1913 there were 1,750 electric street lights in use across the city, and a growing demand for electricity from industry. The growth of electricity supplies increased from 186,500 kWh in 1894, to 1,481,179 kWh (1902) and to 6,472,386 (1912).

In 1923 the AC generating plant comprised 1 × 3 MW and 1 × 5 MW turbo generators providing a 400 V and 230 V AC supply. The DC plant comprised 1 × 0.5 MW, 1 × 1 MW and 1 × 2 MW turbo generators plus 1 × 0.75 reciprocating generator providing a 220 V and 440 V DC supply. In 1923 a total of 14.513 MWh of electricity was sold raising a total revenue of £171,327 for Norwich Corporation.

By the mid 1920s the Duke Street site had reached the size limit for further expansion, the Corporation resolved to build a new power station at Thorpe on the southern outskirts of the city. The Duke Street site was redeveloped as stores and workshops for the company.

Norwich power station 1926–75

The new power station at Thorpe (52°37’15"N 1°19’06"E) to the south of Crown Point railway depot opened on 28 October 1926. Initially it consisted of a low-pressure (LP) coal-fired station with chain-grate boilers. The station had a rated output capacity of 40 megawatts; its first equipment was installed in 1922. The single boiler delivered 490,000 lb/hr (61.7 kg/s) of steam at a pressure of 250 psi (17.2 bar) and at a temperature of 343/371 °C. Cooling water was taken from, and returned to, the River Wensum. A rail siding was built to deliver coal and remove ash from the station. Coal was also delivered by collier and barge. The station had a single chimney. In 1926 the station generated 24 GWh over the year, by 1936 this had increased to 134 GWh.

In 1927 the Central Electricity Board (CEB) assumed responsibility across the country for directing the operation of ‘selected’ power stations and paying for their operation. Norwich Council had the right to buy the electricity they required from the Board. The CEB also built the first stages of the National Grid (1927–33).

In the late 1920s concerns were raised about the lack of electricity in rural areas. The government set up two rural demonstration schemes one at Bedford and one at Norwich. The Norwich demonstration scheme was ready by 1931. It was centred on Reepham and covered 125 square miles providing electricity for 14,000 people in 4,000 dwellings. The cost of the scheme was £60,000 for 60 miles of 3-phase and 40 miles of single phase transmission lines. The schemes were expected to achieve payback in 7 years. Some evidence showed that where rural areas were developed in conjunction with urban schemes the added cost was comparatively low. However, it was acknowledged that electricity for dispersed rural communities was difficult to provide without financial aid.

In the late 1930s a high-pressure (HP) power station was constructed adjacent to the LP station. It had rated output capacity of 30 MW; its first equipment was installed in 1937. There were four boilers which delivered a total of 480,000 lb/hr (60.5 kg/s) of steam at a pressure of 650 psi (44.8 bar) and at 454 °C. There was a single 31 MW turbo-alternator.

Upon nationalisation of the British electricity supply industry in 1948 the ownership of Norwich power stations were vested in the British Electricity Authority, and subsequently the Central Electricity Authority and the Central Electricity Generating Board (CEGB). At the same time the electricity distribution and sales responsibilities of the Norwich undertaking were transferred to the Eastern Electricity Board.

By the late 1950s there were three 5 MW, one 12.5 MW, and one 15 MW British Thomson-Houston turbo-alternators; and one 31 MW Parsons set. By 1961 the LP station was rated at 42.5 MW and the HP station at 31 MW. The combined annual electricity output, in GWh, of the HP/LP stations from 1954 was as follows:

Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org.

In 1958 the Norwich electricity district supplied an area of 667 square miles and a population of 263,700. The amount of electricity sold and the number and types of consumers was as follows:

Year Electricity sold, MWh No. of consumers
1956 238259 86,344
1957 256,592 88,667
1958 276,079 91,113

In 1958 the above totals were made up of the following:

Type of Consumer No. of consumers Electricity sold, MWh
Domestic 78,858 132,130
Commercial 6,223 48,990
Combined premises 2,173 8,025
Farms 2,401 15,873
Industrial 1,436 67,049
Public lighting 22 4,012
Total 91,113 276,079

The LP station was decommissioned in 1967 and the HP station continued in operation until 1975, and the whole of the site was demolished in 1981-82.

Gas turbine station

In 1964 a quick response oil-fired gas turbine plant was erected to the west of the HP/LP steam station. This was intended to provide power at times of peak demand, and similar plants was installed at the other power stations within the CEGB’s South Eastern Region. These included at Rye House, Hertfordshire; Tilbury B, Essex; Croydon, London; and Hastings, Sussex. At Norwich four gas turbines powered two 55 MW generators. The station had two reinforced concrete chimneys. The annual output of the gas turbines, in GWh, over the lifetime of the power station was as follows:

Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org.

The increased output in 1984–5 was associated with the 1984–5 miners strike when the availability of coal was reduced. The gas turbine plant was decommissioned in 1986 and subsequently demolished.

A 132 kV substation to the east of the HP/LP station provided a connection to the national grid, this is extant (in 2020). Two tall pylons once provided a national grid crossing clear of navigation on the river, these were dismantled in 2017.

References

  1. ^ Electricity Council (1987). Electricity Supply in the United Kingdom: a Chronology. London: Electricity Council. pp. 15, 45–47, 51, 60–61. ISBN 085188105X.
  2. ^ Hannah, Leslie (1979). Electricity before Nationalisation. London: Macmillan. pp. 23–24, 191. ISBN 0333220862.
  3. ^ Donald Insall Associates Ltd. (31 October 2007). "Duke's Wharf Site, Historical recording of thee Electric Light Company Offices" (PDF). hbsmrgateway2. Retrieved 5 March 2020.
  4. ^ "Duke's Palace Ironworks and Norwich Electric Lighting Company". heritage.norfolk.gov.uk. 2015. Retrieved 5 March 2020.
  5. Garcke, Emile (1898). Manual of Electrical Undertakings vol. 3. London: P. S. King and son.
  6. "Thorpe Power Station". The National Archives. Retrieved 5 March 2020.
  7. Electricity Commission (1925). Electricity Supply 1920-23. London: HMSO. pp. 70–73, 302–307.
  8. ^ "British Power Stations operating at 31 December 1961". Electrical Review. June 1962: 931. 1 June 1962.
  9. ^ "Site of Thorpe power station". Norfolk Heritage Explorer. 9 May 2011. Retrieved 5 March 2020.
  10. "1970s photo gallery". broadlandmemories.co.uk. Retrieved 6 March 2020.
  11. ^ Luckin, Bill (1990). Questions of Power: Electricity and Environment in Inter-War Britain. Manchester: Manchester University Press. pp. 80–1. ISBN 9780719033025.
  12. "Rural Electrification News". Google Books. 1934. Retrieved 6 March 2020.
  13. ^ Garrett, Frederick C., ed. (1959). Garke's Manual of Electricity Supply (vol. 56). London: Electrical Press. pp. A-82, A-129, B-212.
  14. ^ CEGB Statistical Yearbooks (various dates). CEGB, London.
  15. GEGB Annual report and accounts, various years
  16. Electricity Commission, Generation of Electricity in Great Britain year ended 31st December 1946. London: HMSO, 1947.
  17. ^ "Site of Trowse Power Station". Norfolk Heritage Explorer. 9 May 2011. Retrieved 5 March 2020.