Norwood Junction | |
---|---|
Station entrance | |
Norwood JunctionLocation of Norwood Junction in Greater London | |
Location | South Norwood |
Local authority | London Borough of Croydon |
Managed by | London Overground |
Owner | Network Rail |
Station code(s) | NWD |
DfT category | C2 |
Number of platforms | 6 (Formerly 7) |
Accessible | Yes (Platform 1 Northbound only) |
Fare zone | 4 |
National Rail annual entry and exit | |
2019–20 | 4.625 million |
– interchange | 1.121 million |
2020–21 | 1.490 million |
– interchange | 0.282 million |
2021–22 | 3.017 million |
– interchange | 0.605 million |
2022–23 | 3.806 million |
– interchange | 1.159 million |
2023–24 | 4.325 million |
– interchange | 0.907 million |
Railway companies | |
Original company | London & Croydon Railway |
Key dates | |
5 June 1839 | Opened as Jolly Sailor |
October 1846 | Renamed Norwood |
1 June 1859 | Resited |
1865 | LBSCR Goods Shed built |
1 October 1910 | Renamed Norwood Junction and South Norwood for Woodside |
13 June 1955 | Renamed Norwood Junction |
Other information | |
External links | |
Coordinates | 51°23′50″N 0°4′30″W / 51.39722°N 0.07500°W / 51.39722; -0.07500 |
London transport portal |
Norwood Junction is an interchange station between the Windrush line of the London Overground and National Rail services operated by Southern and Thameslink, located in South Norwood in the London Borough of Croydon. Situated in Travelcard Zone 4, it is 8 miles 55 chains (8.69 miles, 13.98 km) down the line from London Bridge.
History
This section needs additional citations for verification. Please help improve this article by adding citations to reliable sources in this section. Unsourced material may be challenged and removed. (February 2015) (Learn how and when to remove this message) |
The station has occupied two sites under three names.
Jolly-sailor and Norwood stations
In 1839 the London and Croydon Railway opened Jolly-sailor station — "Jolly-sailor near Beulah Spa" on fares lists and timetables — at the north end of the High Street, adjacent to the Portland Road level crossing. From 1841 the lines through Norwood were used by the London and Brighton Railway and from 1842 the South Eastern Railway, but neither of these companies used the station. (The Jolly Sailor is a pub — originally the Jolly Sailor Inn — on the corner of Portland Road and High Street. The original pub was rebuilt around the late 1860s.)
In 1844 the L&CR was given parliamentary authority to test an experimental atmospheric railway system on the railway. A pumping station was built on Portland Road to create a vacuum in a continuous pipe located centrally between the rails. A piston extended downwards from the trains into a slit in the pipe, with trains blown towards the pumping station by atmospheric pressure. The pumping station was in a Gothic style, with a very tall ornate tower that served both as a chimney and as an exhaust vent for air pumped from the propulsion tube.
As part of the works for the atmospheric system, the world's first railway flyover was constructed beyond the south end of the station to carry the atmospheric line over the conventional London & Brighton Railway steam line. At the same time the level crossing at Portland Road was replaced by a low bridge across the road.
In July 1846 the L&CR merged with the L&BR to form the London Brighton and South Coast Railway, and the station was renamed Norwood in the same year - it became Norwood Junction by 1856. The LB&SCR abandoned atmospheric propulsion in 1847.
Following construction of lines to Crystal Palace the station closed on 1 June 1859 and was replaced by the current station located at the end of a short approach road off the south side of the A213 road. The original station building was used as a private house until the 1960s, when it was demolished.
Norwood Junction rail accident
Main article: Norwood Junction rail accidentThe Norwood Junction railway crash occurred on 1 May 1891, when the cast-iron bridge over Portland Road fractured under an express train from Brighton to London.
The present station
This section does not cite any sources. Please help improve this section by adding citations to reliable sources. Unsourced material may be challenged and removed. (July 2013) (Learn how and when to remove this message) |
The station opened on 1 June 1859 by the LB&SCR. It was renamed Norwood Junction and South Norwood on 1 October 1910 but reverted to its original name on 13 June 1955 though some tickets and publications continued to use the pre-1955 name for sometime thereafter. There are seven platforms but only five are in use. Ticket barriers control access to all platforms. The LB&SCR goods shed built in 1865 remains in place, now used as railway offices.
Platforms 1 & 2
Platform 1 is the first platform when entering via the main entrance and is the only platform accessible without having to negotiate the subway via stairs. Its main use is for trains northwards to Highbury & Islington, London Bridge and London Victoria; most stop at all stations. They mainly come from West Croydon, Caterham, Sutton and Epsom. The platform is also used for Windrush line (London Overground) and Southern trains.
Platform 2 serves the same track as Platform 1 but passengers are not able to join or alight as the doors open only on the Platform 1 side. This is due to the live rail being on the side nearest to Platform 2. Platform 2 also is used for platform alteration.
Platform 3
Platform 3 is mainly used for northbound trains terminating at Bedford via London Bridge. Many passengers use this platform to go to central London, London St Pancras International & Luton Airport Parkway. The platform serves both fast and stopping services, and is mainly used by Thameslink.
Platform 4
Platform 4 is mainly used for southbound trains terminating at Gatwick Airport. The platform serves both fast trains and stopping services, and is also mainly used by Thameslink.
Platform 5
Platform 5 is mainly used for southbound trains terminating at West Croydon, Epsom and Sutton. Most trains stop at this platform and many travellers from London alight here. Services come from London Bridge, Highbury & Islington and London Victoria. The platform is used by both Southern and London Overground.
Platform 6
Platform 6 is mainly used for southbound trains terminating at Coulsdon Town, West Croydon, Caterham and Tattenham Corner; it is also used for platform alterations. Trains come from London Victoria and London Bridge. Platform 6 is chiefly used by Southern.
Platform 7
Platform 7 is disused and the line is covered by vegetation. However, with the planned two-year blockade of Thameslink trains through Central London while London Bridge station was being reconstructed, Network Rail considered reinstating and electrifying this line as a 'dead-end'. The object was to terminate some additional services arriving via Crystal Palace which would otherwise have needed to go on to Beckenham Junction to terminate, thus obviating unnecessary occupation of the 1+3⁄4 miles (2.8 km) of single bi-directional line east of Birkbeck Junction and also save a carriage set. To achieve the change the lead to the down spur at Bromley Junction would have been being removed to the up line and a facing crossover put into place west of it. To provide the necessary pathing northbound the trains would have used the same spur line, which would have become reversible to the resited point on the up line at Bromley Junction. Despite safety problems for the user-operated level crossing into the track maintenance depot on the former steam shed site (because of restricted sighting under Goat House bridge) having apparently been resolved, the changes have been postponed until the work at London Bridge is complete. This is mainly because it was judged that the cost did not justify the change, at least until a general renewal of the signal and control installation is undertaken.
Services
Norwood Junction is located on the Windrush line of the London Overground. Additional services are operated by Southern and Thameslink.
The typical off-peak service in trains per hour is:
- 4 tph to London Bridge (non-stop)
- 2 tph to London Victoria via Crystal Palace
- 2 tph to Epsom via Sutton
- 2 tph to Caterham and Tattenham Corner, dividing and attaching at Purley
- 2 tph to West Croydon
On Sundays, the services to Epsom and Tattenham Corner do not run. Passengers for Tattenham Corner have to change at Purley.
Trains to London Victoria do not run after 8pm, or at all on Sundays.
During peak hours, some trains between London Bridge and Caterham & Tattenham Corner do not stop at this station.
Southern services at Norwood Junction are operated using Class 377 EMUs.
The typical off-peak service in trains per hour is:
- 2 tph to Bedford via London Bridge
- 2 tph to Three Bridges via Redhill
During peak hours and football match days, some trains to Peterborough, Horsham, Cambridge, Brighton and East Grinstead also stop at this station.
Thameslink services at Norwood Junction are operated using Class 700 EMUs.
Windrush line (London Overground)
The typical off-peak service in trains per hour is:
- 4 tph to Highbury & Islington via Surrey Quays
- 4 tph to West Croydon
London Overground services at Norwood Junction are operated using Class 378 EMUs
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
London Bridge | SouthernBrighton Main LineStopping Services | East Croydon | ||
AnerleyLimited Service | ||||
Crystal Palace | SouthernCrystal Palace Line | West Croydon | ||
London Bridge | SouthernSutton & Mole Valley Lines | |||
ThameslinkBrighton Main Line | East Croydon | |||
Preceding station | London Overground | Following station | ||
Anerleytowards Highbury & Islington | Windrush lineEast London line | West CroydonTerminus |
Marshalling yard
The LB&SCR constructed a large marshalling yard to the south of the station during the 1870s, extended in the early 1880s. At their height the yards on both sides of the line each had over 30 carriage roads. Because of the narrow nature of the site they were laid in clusters of six to eight, one beyond another, with the lead to each forming an individual headshunt. With dwindling freight traffic the yard fell into disuse by the 1980s and the tracks were relaid to accommodate an enlarged Selhurst Depot.
Motive Power Depot/Norwood Cable Depot
The Southern Railway opened a five-road motive power depot with a 65 ft (19.8 metre) turntable in 1935, to serve the marshalling yard. It replaced a shed at West Croydon. This depot was closed in 1964 and demolished in 1966.
Following the demolition of the locomotive depot British Rail then redeveloped the site into a traction cable depot for maintaining the railway.
Connections
Norwood Junction is well served by bus routes, with three bus stops including two bus stands close by. On the Portland Road side are two stops for routes 197 (Croydon Town Centre – Norwood Junction – Peckham) and 312 (South Croydon bus garage – East Croydon – Norwood Junction). The High Street 'Clocktower' stop serves routes 75 (Croydon Town Centre – Penge – Lewisham Station), 157 (Morden – West Croydon – Crystal Palace) and 410 (Wallington – Croydon – Crystal Palace). The Grosvenor Road stop serves routes 130 (New Addington – Addington Village – Thornton Heath, Parchmore Road) and 196 (Norwood Junction – Brixton – Elephant and Castle).
Route 75 was formerly a 24-hour route but that facility was withdrawn in favour of a higher frequency of buses on a Sunday by Selkent when it took the service over from Stagecoach London. Metrobus won the contract from April 2009 and works the route from its Croydon garage. Nowadays the route is operated by Stagecoach London. The stop on Night Bus route N68 is half a mile away on Whitehorse Lane. Other service operators are Arriva London, Metrobus and Transport UK London Bus.
Latest Improvements
Thameslink Programme
Main article: Thameslink ProgrammeThe Thameslink Programme (formerly known as Thameslink 2000), is a £3.5 billion major project to expand the Thameslink network from 51 to 172 stations extending northwards to Bedford, Peterborough, Cambridge and King's Lynn and southwards to Guildford, Eastbourne, Horsham, Hove to Littlehampton, East Grinstead, Ashford and Dartford. The project includes the lengthening of platforms, station remodelling, new railway infrastructure (e.g. viaducts) and additional rolling stock. The new Thameslink timetable for Norwood Junction started 20 May 2018. "Norwood Junction gain an all-day-long Thameslink service to Bedford via Blackfriars and St Pancras, with two trains per hour to Epsom via Sutton" and timetables will continue being expanded and adjusted into 2019.
Future
Norwood Junction station Upgrade.
Network Rail have made proposals to upgrade Norwood Junction. The scheme is a key part of Network Rail's long-term plans to unblock the railway bottleneck in the Croydon area, enabling the operation of more frequent and more reliable services on the Brighton Main Line and its branch lines.
Network Rail proposals
- Modify the existing track and platform layouts
- Provide a track layout that allows more trains to run through and stop at the station
- Reconfigure the platforms to provide dedicated island platforms for northbound and southbound services
- Provide dedicated tracks away from the platforms, for fast non‑stopping trains.
Lengthen and widen platforms
- Lengthen platforms to allow full length (12-car) trains to stop and open all their doors at the station.
- Widen all platforms to provide more space for passengers.
Provide step-free access
- Provide two new footbridges, one with lifts to provide step-free access to all platforms.
Upgrade the signalling
- Upgrade the signalling system to give signallers the ability to recover the service more quickly when delays occur.
The benefits
The proposals for Norwood Junction station would deliver regional and local benefits.
More frequent and more reliable services
The proposals form a key part of the wider plans to unblock the Croydon bottleneck, but they would also have benefits as a standalone project, helping to improve reliability and run more frequent services.
Increased station capacity
Widening and lengthening the platforms would provide more space for passengers to wait and get on and off train services. Providing two footbridges would reduce congestion and allow passengers to move more freely through the station.
Network Rail's plans
Proposals are for the station to be constructed entirely within the railway boundary, and Network Rail would seek consent for these changes through the usual planning process.
The works are not proposed to form part of the Transport and Works Act Order application for other proposed upgrade works between East Croydon station and the “Selhurst triangle”, which Network Rail has been consulting on. Further consultations on the Norwood proposals were due to take place in 2020.
The proposals for Norwood Junction station are unfunded, as are the wider proposals to upgrade the Brighton Main Line. Over the months and years ahead Network Rail will continue to make the case for investment in the Brighton Main Line railway 2020.
In literature
It is from this station that Jonas Oldacre takes his train to London Bridge in Arthur Conan Doyle's Sherlock Holmes story "The Adventure of the Norwood Builder" (1903).
References
- "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
- ^ "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
- ^ "London's Last Goods Sheds". The London Railway Record. 91: 233. April 2017.
- Butt, R.V.J. (1995). The Directory of Railway Stations, Patrick Stephens Ltd, Sparkford, ISBN 1-85260-508-1, p. 175.
- Standard Tube Map (PDF) (Map). Not to scale. Transport for London. April 2024. Archived (PDF) from the original on 28 May 2024. Retrieved 3 June 2024.
- "Jolly-sailor Station". The Pictorial Times. 1845.
- "The Long Way Home by Liane Lang". Archived from the original on 21 August 2016. Retrieved 20 August 2016.
- Connor, J.E. (2006). London's Disused Stations: The London Brighton & South Coast Railway. Colchester: Connor & Butler. p. 70. ISBN 978-0-947699-39-0.
- London Brighton and South Coast Railway
- Chronology of London Railways by H.V.Borley
- Table 171, 172, 175, 177, 178, 180, 181, 183 National Rail timetable, May 2022
- Table 171, 172, 175, 177, 178, 180, 181, 183 National Rail timetable, May 2022
- Table 171, 172, 175, 177, 178, 180, 181, 183 National Rail timetable, May 2022
- "London Overground Timetable: Highbury & Islington to New Cross, Clapham Junction, Crystal Palace and West Croydon" (PDF). London Overground. Retrieved 14 September 2022.
- Turner, John Howard (1979). The London Brighton and South Coast Railway 3 Completion and Maturity. Batsford. p. 76. ISBN 0-7134-1389-1.
- Hawkins, Chris; Reeves, George (1979). An historical survey of Southern sheds. Oxford Publishing Co. p. 60. ISBN 0-86093-020-3.
- ^ "Buses from Norwood Junction" (PDF). Transport for London. 16 June 2014. Retrieved 22 February 2015.
- ^ Norwood Junction Rail Station - Bus
- London Bus Route 75 – Croydon Town Centre – Selhurst – Anerley – Penge – Newlands Park – Sydenham – Mayow Road – Woolstone Road – Catford – Lewisham Shopping Centre (Route History)
- "Bus Route N68". Transport for London. Retrieved 12 April 2007.
- "Good news for South London as £3.5BN Thameslink project clears major hurdle" (Press release). 18 October 2006. Archived from the original on 28 September 2007. Retrieved 12 April 2007.
- "The new timetable will radically change Croydon's rail services - The Croydon Citizen". The Croydon Citizen. 11 April 2018. Retrieved 15 July 2018.
- "Train Timetables | Train Times & Timetables | Thameslink". www.thameslinkrailway.com. Retrieved 15 July 2018.
- Duncan, Alistair (2009). Close to Holmes: A Look at the Connections Between Historical London, Sherlock Holmes and Sir Arthur Conan Doyle. London: MX Publishing. ISBN 1-904312-50-0.
External links
- Train times and station information for Norwood Junction railway station from National Rail
London Overground | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||
| |||||||||||||||||||||
London transport portal |
Transport in London | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Companies and organisations |
| ||||||||||||||||||
Airports |
| ||||||||||||||||||
Major stations |
| ||||||||||||||||||
Roads |
| ||||||||||||||||||
Ticketing | |||||||||||||||||||
Other | |||||||||||||||||||
Former BR sectors | |||||||||||||||||||
Buildings and structures in Croydon | |
---|---|
Highrises |
|
Notable lowrises |
|
Major railway stations | |
Major complexes | |
Sports venues | |
Thameslink, Great Northern, Southern and Southeastern routes | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
Stations in italics are served on limited occasions, at peak hours or on Sundays only. | |||||||||||
- Rail transport stations in London fare zone 4
- DfT Category C2 stations
- Railway stations in the London Borough of Croydon
- Former London, Brighton and South Coast Railway stations
- Railway stations in Great Britain opened in 1839
- Railway stations in Great Britain closed in 1859
- Railway stations in Great Britain opened in 1859
- Railway stations served by London Overground
- Railway stations served by Govia Thameslink Railway
- Windrush line stations