Misplaced Pages

Nuclear power in Sweden

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Nuclear power in Sweden is located in Southern SwedenBarsebäckBarsebäckForsmarkForsmarkOskarshamnOskarshamnR4R4RinghalsRinghalsÅgestaÅgestaclass=notpageimage| Nuclear power plants in Sweden (view)
 Active plants
 Closed plants
 Unfinished plants

The electricity sector in Sweden has three operational nuclear power plants with 6 operational nuclear reactors, which produce about 30% of the country's electricity. The nation's largest power station, Forsmark Nuclear Power Plant, has three reactors producing 3.3 GW and 14% of Sweden's electricity.

Sweden formerly had a nuclear phase-out policy, aiming to end nuclear power generation in Sweden by 2010. On 5 February 2009, the Government of Sweden announced an agreement allowing for the replacement of existing reactors, effectively ending the phase-out policy.

In June 2023, the new Kristersson Cabinet established after the country's 2022 election voted to switch the national energy target from 100% renewable electricity by 2045 to 100% fossil fuel-free electricity by 2045, a move seen as supporting and extending the ongoing use of nuclear power in the country. At the time, hydro, nuclear, and wind power already produced 98% of Sweden's electricity, with the government aiming to increase electricity production from carbon-free sources to meet an estimated doubling of national electricity consumption by 2040.

History

Electricity production in Sweden by type
Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org.
Nuclear power production in Sweden by reactor

Early history

Sweden began research into nuclear energy in 1947 with the establishment of the Atomic Energy Company, AB Atomenergi, which originated in the ongoing military research and development at the Defence Institute FOA. In 1954, the country built its first small research heavy water reactor, the R1 nuclear reactor. The R1 was dismantled in 1970. It was followed by two heavy water reactors: Ågesta or R3 nuclear reactor, a small heat and power reactor in 1964, and Marviken or R4 nuclear reactor which was finished but never operated (was never loaded with nuclear fuel), due to several safety issues. The R3 reactor stopped operations in 1974 and is to be demolished with work beginning in 2020 and ending 2025. The R4 project was cancelled in 1970, with the site being used in non-nuclear capacity since. Also a reactor named the R2 nuclear reactor, the second nuclear reactor in Sweden, was built in Studsvik, east of Nyköping. Studsvik also hosted a reactor named R2-0 nuclear reactor. Both R2 and R2-0 were small research reactors, and both were decommissioned in 2005. Furthermore there was also a third research reactor in Studsvik called FR-0 nuclear reactor which was a zero-power fast reactor with low power output. It was operated 1964–1971 and was then dismantled.

On 1 May 1969, the prototype nuclear cogeneration plant Ågestaverket (R3) suffered an incident in which secondary cooling water flooded through a broken valve and caused a number of electrical problems in the plant, resulting in a 4-day shutdown.

R1, R3, and particularly the never finished R4 project at Marviken were heavy water reactors, motivated by the option to use Swedish uranium without isotope enrichment and by the possibility to use the reactors to produce weapons grade plutonium for Swedish nuclear warheads. The Swedish nuclear weapons program was eventually shut down, however, and Sweden signed the nuclear non-proliferation treaty in 1968.

Six nuclear reactors began commercial service in the 1970s, and another six through 1985. Nine of the reactors were designed by Allmänna Svenska Elektriska Aktiebolaget (ASEA), and three supplied by Westinghouse.

Plans for nuclear phase-out

After the Three Mile Island accident in 1979, there was a national referendum in Sweden about the future of nuclear power. As a result of this, the Riksdag decided in 1980 that no further nuclear power plants should be built, and that a nuclear power phase-out should be completed by 2010. Some observers have condemned the referendum as flawed because people could only vote "NO to nuclear", although three options were basically a harder or a softer "NO".

After the 1986 Chernobyl accident in USSR, the question of security of nuclear energy was again raised. In July 1992 an incident at Barsebäck 2 showed that the five older boiling water reactors had had potentially reduced capacity in their emergency core cooling systems since they started operation. Mineral wool was dislodged and ended up in the suppression pool where it clogged the suction strainers. It was classified as a grade 2 incident in the IAEA INES scale, due to the degradation of defence-in-depth. All five reactors were ordered down by the Nuclear Inspectorate for remedial action where backwash and additional strainers were installed. Most of the reactors were back in operation by next Spring, but Oskarshamn 1 remained down until January 1996 due to other work being carried out.

During the late 1990s a unique capacity tax on nuclear power (effektskatten) was introduced. It was initially set at 5514 SEK per MWth per month, and only applied to nuclear power plants, thus penalizing them relative to other energy sources. In January 2006 it was almost doubled (at 10,200 SEK per MWth per month). An agreement struck in June 2016 among other things meant the capacity tax would be phased out by 2019. By then the tax constituted about one third of the cost of operating a nuclear reactor.

In 1997 the Riksdag decided to shut down one of the reactors at Barsebäck nuclear power plant by 1 July 1998 and the second before 1 July 2001, although under the condition that their energy production would be compensated. The next conservative government tried to cancel the phase-out, but, after protests, decided instead to extend the time limit to 2010. At Barsebäck, block 1 was shut down on 30 November 1999 and block 2 on 1 June 2005.

In August 2006 three of Sweden's ten nuclear reactors were shut down due to safety concerns following an incident at Forsmark Nuclear Power Plant, in which two out of four emergency power generators failed causing a power shortage. It was classified as a grade 2 incident in the INES scale, due to the degradation of defence-in-depth.

In 2006 the Centre Party of Sweden, an opposition party that until then had supported the phase-out, announced that it was dropping its opposition to nuclear power, at least for the time being, claiming that it is unrealistic to expect the phase-out in the short term. It said it would now support the stance of the other opposition parties in Alliance for Sweden, which were considerably more pro-nuclear than the then Social Democratic government.

Phase-out abandoned

On 17 June 2010, the Riksdag adopted a decision allowing the replacement of the existing reactors with new nuclear reactors, starting from 1 January 2011.

In June 2016, the coalition government decided to abolish the nuclear power output tax in 2019 and to successively replace the existing reactors with new ones. In October 2022, the new Swedish governing decided to have Ringhals 1 and 2 reactors restarted and the construction of further reactors examined.

Nuclear revival

In June 2023, the new Kristersson Cabinet established after the country's 2022 election voted to switch the national energy target from 100% renewable electricity by 2045 to 100% fossil fuel-free electricity by 2045, a move seen as supporting and extending the ongoing use of nuclear power in the country. At the time, hydro, nuclear, and wind power already produced 98% of Sweden's electricity, with the government aiming to increase electricity production from carbon-free sources to meet an estimated doubling of national electricity consumption by 2040.

In November 2023, more details about the new nuclear policy, which is to enter into force on 1 January 2024, were revealed. The current 10 reactor cap will be dropped, permitting process will be shortened and new nuclear reactors will be allowed also on new sites and not just existing ones. A target of 2500 MWe of nuclear power by 2035 was announced, as electricity consumption is expected to rise to 300 TWh by 2045. In 2024, a Swedish government study proposed a new financing and risk sharing model providing a sufficient return on investment for the private sector to invest in new nuclear power. The proposal involved three elements: government loans, contract for difference guaranteed electricity pricing financed by consumers, and a mechanism ensuring a minimum return for equity investors.

List of electricity producing nuclear reactors

Main article: Nuclear power in Sweden
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ågesta 1 PHWR R3 Shut down/in decommissioning 10 1 Dec 1957 1 May 1964 2 Jun 1974
Barsebäck 1 BWR ASEA-II Shut down/in decommissioning 600 1 Feb 1971 1 Jul 1975 30 Nov 1999
2 BWR ASEA-II Shut down/in decommissioning 600 1 Jan 1973 1 Jul 1977 31 May 2005
Forsmark 1 BWR ASEA-III, BWR-2500 Operational 986 1 Jun 1973 10 Dec 1980
2 BWR ASEA-III, BWR-2500 Operational 1116 1 Jan 1975 7 Jul 1981
3 BWR ASEA-IV, BWR-3000 Operational 1167 1 Jan 1979 18 Aug 1985
Oskarshamn 1 BWR ASEA-I Shut down/in decommissioning 473 1 Aug 1966 6 Feb 1972 19 Jun 2017
2 BWR ASEA-II Shut down/in decommissioning 638 1 Sep 1969 1 Jan 1975 22 Dec 2016
3 BWR ASEA-IV, BWR-3000 Operational 1450 1 May 1980 15 Aug 1985
Marviken 1 BHWR R4 Unfinished 196 1 Apr 1965 27 May 1970
Ringhals 1 BWR ASEA-I Shut down/in decommissioning 881 1 Feb 1969 1 Jan 1976 31 Dec 2020
2 PWR WH 3-loops Shut down/in decommissioning 904 1 Oct 1970 1 May 1975 30 Dec 2019
3 PWR WH 3-loops Operational 1062 1 Sep 1972 9 Sep 1981
4 PWR WH 3-loops Operational 1104 1 Nov 1973 21 Nov 1983

Decommissioned reactors

The decommissioned nuclear reactors of Sweden are:

Public opinion

The nuclear energy phase-out is controversial in Sweden. The energy production of the remaining nuclear power plants has been considerably increased in recent years to compensate for the Barsebäck shut-down.

In May 2005, a poll of residents living around Barsebäck found that 94% wanted it to stay. The subsequent leak of radioactive water from the nuclear waste store in Forsmark did not lead to a major change in public opinion. According to a poll of January 2008, 48% of Swedes were in favour of building new nuclear reactors, 39% were opposed and 13% were undecided. However, the 2011 Fukushima Daiichi nuclear disaster in Japan reversed prior support of nuclear power, with polls showing that 64% of Swedes opposed new reactors while 27% supported them. However, in a poll November 2019 the public opinion has changed with 78% in favor of nuclear power and only 11% against.

Prior public support for nuclear power stood in contrast to the stances of the major political parties in Sweden, but after the polls in late 2019 the debate changed and the parties that want to build new nuclear power in Sweden (SD, M, KD, L ) put forth a demand to the leading government party, the Social Democrats to choose a path forward, otherwise they might break with the standing energy agreement and work to reform the policy towards nuclear power, outside of the influence of the minority government.

Nuclear waste

Sweden has a well-developed nuclear waste management policy. Low-level waste is currently stored at the reactor sites or destroyed at Studsvik. The country has dedicated a ship, M/S Sigyn, to move waste from power plants to repositories. Sweden has also constructed a permanent underground repository, SFR, final repository for short-lived radioactive waste, with a capacity of 63,000 cubic meters for intermediate and low-level waste. A central interim storage facility for spent nuclear fuel, Clab, is located near Oskarshamn. The government has also identified two potential candidates for burial of additional waste (high-level), Oskarshamn and Östhammar.

Anti-nuclear activists

Environmental activists in front of the Barsebäck nuclear power plant. These road signs were put up on roads around the power plant two weeks after the Chernobyl disaster.

In June 2010, Greenpeace anti-nuclear activists invaded Forsmark nuclear power plant to protest the then-plan to remove the government prohibition on building new nuclear power plants. In October 2012, 20 Greenpeace activists scaled the outer perimeter fence of the Ringhals nuclear plant, and there was also an incursion of 50 activists at the Forsmark plant. Greenpeace said that its non-violent actions were protests against the continuing operation of these reactors, which it says are unsafe in European stress tests, and to emphasise that stress tests did nothing to prepare against threats from outside the plant. A report by the Swedish nuclear regulator said that "the current overall level of protection against sabotage is insufficient". Although Swedish nuclear power plants have security guards, the police are responsible for emergency response. The report criticised the level of cooperation between nuclear site staff and police in the case of sabotage or attack.

Photo gallery

See also

Notes

  1. The full reactor model name is R3/Adam.
  2. The full reactor model name is ASEA-ATOM Gen II.
  3. The full reactor model name is ASEA-ATOM Gen II.
  4. The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.
  5. The full reactor model name is ASEA-ATOM Gen III, BWR-2500, BWR 69.
  6. The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.
  7. The full reactor model name is ASEA-ATOM Gen I.
  8. The full reactor model name is ASEA-ATOM Gen II.
  9. The full reactor model name is ASEA-ATOM Gen IV, BWR-3000, BWR 75.
  10. The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.
  11. The full reactor model name is ASEA-ATOM Gen I. Closed at midnight on New Year's Eve.
  12. The full reactor model name is Westinghouse 3-loops.
  13. The full reactor model name is Westinghouse 3-loops.
  14. The full reactor model name is Westinghouse 3-loops.

References

  1. "PRIS - Country Details".
  2. Borgenäs, Johan (November 11, 2009). "Sweden Reverses Nuclear Phase-out Policy". Nuclear Threat Initiative.
  3. Florence Jones (2023-06-22). "Sweden adopts new fossil-free target, making way for nuclear". Power Technology. Retrieved 2023-06-28.
  4. Simon Johnson (2023-06-20). "Swedish parliament passes new energy target, easing way for new nuclear power". Reuters. Retrieved 2023-06-28.
  5. T. Jonter: Nuclear Weapon Research in Sweden. The Co-operation Between Civilian and Military Research, 1947-1972, SKI Report 02:18
  6. Jonter ibid
  7. The Flooding Incident at the Ågesta Pressurized Heavy Water Nuclear Power Plant (pdf)
  8. "Neutral Sweden Quietly Keeps Nuclear Option Open", The Washington Post, 25 November 1994
  9. Nils-Olov Jonsson and Carl Berglöf (2016). "Nuclear Power Plants in Sweden during the Last 40 Years". European Nuclear Society. Archived from the original on 2018-10-02. Retrieved 2018-10-01.
  10. E. Denton (Jr.), Robert (2000). Political Communication Ethics: An Oxymoron?. Greenwood Publishing Group. p. 159. ISBN 9780275964832.
  11. "Bulletin 96-03: Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-".
  12. "Nuclear Energy in Sweden - World Nuclear Association".
  13. "Sweden strikes deal to continue nuclear power". The Local. 10 June 2016.
  14. M. Griffin, James (2003). Global Climate Change: The Science, Economics and Politics. Edward Elgar Publishing. p. 238. ISBN 9781843767138.
  15. Centre dumps nuclear deal Archived 2008-03-02 at the Wayback Machine, The Local, 30 May 2006
  16. "New phase for Swedish nuclear". World Nuclear News. 18 June 2010. Retrieved 18 June 2010.
  17. "Sweden abolishes nuclear tax". World Nuclear News. 2016-06-10. Retrieved 2022-11-08.
  18. "New Swedish government seeks expansion of nuclear energy". World Nuclear News. 2022-10-17. Retrieved 2022-10-18.
  19. Florence Jones (2023-06-22). "Sweden adopts new fossil-free target, making way for nuclear". Power Technology. Retrieved 2023-06-28.
  20. Simon Johnson (2023-06-20). "Swedish parliament passes new energy target, easing way for new nuclear power". Reuters. Retrieved 2023-06-28.
  21. "Sweden plans 'massive' expansion of nuclear energy". www.world-nuclear-news.org. Retrieved 2023-11-22.
  22. "Financing model proposed for new Swedish reactors". World Nuclear News. 13 August 2024. Retrieved 15 August 2024.
  23. ^ "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 2007-03-31. Retrieved 12 Jan 2023.
  24. ^ "IAEA Sweden reactors". IAEA. 2023-01-11. Retrieved 12 Jan 2023.
  25. ^ "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). Apr 2016. Retrieved 12 Jan 2023.
  26. "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 Jan 2023.
  27. "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 Oct 2020. Retrieved 29 Dec 2020.
  28. Vindkraftverk möter största motståndet i Skåne Archived 2005-12-26 at the Wayback Machine, Sydsvenskan, 15 August 2005
  29. Swedes oppose new nuclear power: poll, The Local, 19 March 2011
  30. Rekordfå är emot kärnkraft i Sverige, NyTeknik, 22 November 2019
  31. Tar strid för mer kärnkraft – kräver att S väljer väg, Aftonbladet, 29 October 2019
  32. "Nuclear Energy in Sweden". World Nuclear Association. April 2010. Retrieved 20 June 2010.
  33. "The antis attack!". Nuclear Engineering International. 5 April 2013.

Further reading

  • William D. Nordhaus, The Swedish Nuclear Dilemma — Energy and the Environment, 1997 Hardcover, ISBN 0-915707-84-5.
  • Arne Kaijser / Jan-Henrik Meyer, “The World's Worst Located Nuclear Power Plant”: Danish and Swedish perspectives on the Swedish nuclear power plant Barsebäck. Journal for the History of Environment and Society 3 (2018): 71-105. Full Text
  • Arne Kaijser, Sweden. Short Country Report (History of Nuclear Energy and Society Project) Update 2018. http://www.honest2020.eu/sites/default/files/deliverables_24/SW.pdf.

External links

News
Energy in Sweden
Companies
Nuclear plants
Active
Closed
Hydroelectric plants
Transmission
Within Sweden
To other countries
Related topics
Nuclear energy in Europe
Sovereign states
States with limited
recognition
Dependencies and
other entities
Other entities
Category: