This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "ORP Sęp" 2002 – news · newspapers · books · scholar · JSTOR (February 2024) (Learn how and when to remove this message) |
Sęp in 2018 | |
History | |
---|---|
Poland | |
Name | Sęp |
Commissioned | 2002 |
Decommissioned | 14 December 2021 |
Homeport | Gdynia |
Status | Decommissioned |
General characteristics | |
Class and type | Kobben-class submarine |
Displacement |
|
Length | 45.2 m (148 ft 4 in) |
Beam | 4.9 m (16 ft 1 in) |
Draft | 4.7 m (15 ft 5 in) |
Propulsion |
|
Speed | 10 knots (19 km/h; 12 mph) surfaced 17 knots (31 km/h; 20 mph) submerged |
Complement | 17 |
Armament | 8 × 533 mm (21 in) torpedo tubes |
ORP Sęp, formerly HNoMS Skolpen (S306), was one of the four Kobben-class submarines in service with the Polish Navy, originally serving with the Royal Norwegian Navy.
History
Sęp was built between 1964 and 1967 for the Royal Norwegian Navy by Nordseewerke in Emden, Germany. In 2001, She was decommissioned with the rest of the Kobbens still in service. Sęp, along with Bielik (Ex-Svenner), Sokół (Ex-Stord), Kondor (Ex-Kunna) and Jastrząb (Ex-Kobben, parts boat) were given to the Polish Navy between 2002 and 2004. She was decommissioned in December 2021 alongside her sister Bielik, with their decommissioning marking the end of active service for the Kobben class.
References
- "Kobbeny nadal pozostaną w służbie". defence24.pl (in Polish). 2019-06-05. Retrieved 2024-05-14.
- "Marynarka Wojenna". 2018-01-20. Archived from the original on 2018-01-20. Retrieved 2024-05-14.
- "The End Of An Era – The "Bielik" And "Sęp" Submarines Decommissioned". MILMAG. 2021-12-25. Retrieved 2024-05-14.
This Polish military article is a stub. You can help Misplaced Pages by expanding it. |
This submarine-related article is a stub. You can help Misplaced Pages by expanding it. |