Freeway in Ontario
Conestoga Parkway | |
---|---|
Kitchener–Waterloo Expressway | |
Conestoga Parkway highlighted in red | |
Route information | |
Maintained by Ministry of Transportation of Ontario | |
Length | 20.7 km (12.9 mi) |
Existed | September 19, 1968–present |
Major junctions | |
West end | Trussler Road |
Major intersections | Highway 8 – Cambridge Highway 7 – Guelph |
North end | 350 metres (383 yd) north of King Street North interchange |
Location | |
Country | Canada |
Province | Ontario |
Major cities | Kitchener, Waterloo |
Highway system | |
The Conestoga Parkway, officially the Kitchener–Waterloo Expressway, is a controlled-access highway in the Canadian province of Ontario, located entirely within the Regional Municipality of Waterloo. The 20.7-kilometre (12.9 mi) route travels east and then north through the cities of Kitchener and Waterloo, and is connected to Highway 401 via Highway 8 and King Street East. The name Conestoga Parkway is not a formal designation, but rather a local name applied to the divided expressway portions of Highway 7, Highway 8 and Highway 85 through Kitchener and Waterloo. The Ministry of Transportation of Ontario (MTO), which built and maintains the route, refers to it as the Kitchener–Waterloo Expressway.
Originally conceived as a ring road in the 1940s, the concept evolved into a pair of at-grade four lane boulevards known as Henry Sturm Boulevard (east–west) and Dryden Boulevard (north–south), for which land was gradually purchased through the 1950s and into the early 1960s. The completion of Highway 401 between Toronto and Highway 8 in 1960 resulted in businesses relocating closer to it; consequently, traffic planners redesigned the boulevards into a continuous four lane expressway in 1962.
Construction of the Kitchener–Waterloo Expressway began in 1966 with the rebuilding of King Street East into a divided highway. This project also resulted in the construction of the interchange with the future expressway, which was named the Conestoga Parkway in 1967. The northern and western legs were built outwards from this interchange simultaneously over the following five years, opening in sections between 1968 and 1971. At that time, the route extended west to Fischer-Hallman Road and north to the southern interchange with King Street North. Two lane extensions opened in 1973 and 1977 to connect the parkway with New Hamburg and St. Jacobs, respectively. Portions of these were expanded to four lanes in the early 1990s. A series of projects saw the parkway completely rebuilt through its central section between the mid-1990s and early 2010s, including a concrete median barrier, additional lanes, and a new flyover ramp at Highway 8.
An ongoing but frequently delayed project to construct a new freeway between Kitchener and Guelph will see a new interchange built at the existing Wellington Street interchange, in addition to the numerous bridges that have already been lengthened in the vicinity. There is currently no projected timeline for the construction of completion of this project as of 2022.
Route description
The Conestoga Parkway is a 20.7-kilometre (12.9 mi) controlled-access freeway serving the twin cities of Kitchener and Waterloo. The route, which forms the rough shape of a backwards "L", serves as the backbone of the two cities. As the concurrency of Highway 7 and Highway 8 enters the city of Kitchener as a freeway from the west, it takes on the name Conestoga Parkway at the Waterloo Regional Road 70 (Trussler Road) exit at the western edge of the city. The parkway travels east until Highway 8 diverges southeast toward Cambridge. Now carrying only the Highway 7 designation, the Conestoga Parkway curves northward. At the Frederick Street and Victoria Street interchange, Highway 7 exits the parkway and follows Victoria Street east toward Guelph; the parkway henceforth is signed as Highway 85 to its northern end, which lies approximately 750 metres (820 yd) north of the Waterloo city limits. The Conestoga Parkway is maintained by the Ministry of Transportation of Ontario (MTO), which officially refers to it as the Kitchener–Waterloo Expressway. The speed limit on the parkway is 90 kilometres per hour (55 mph) throughout its length.
Western leg
At the Kitchener city limits at Trussler Road the concurrency of Highway 7/8 continues west as a four lane freeway towards Stratford. Within Kitchener, the Conestoga Parkway consistently acts as the boundary for neighbourhoods to either side of it. Initially, it is sandwiched between the suburban residential neighbourhoods of Forest Heights and Laurentian West neighbourhoods, to the north and south respectively, as it travels east to Regional Road 58 (Fischer–Hallman Road). There the median switches from grass to a concrete barrier, and the parkway widens to six lanes. It passes north of the Sunrise Shopping Centre before once again bisecting residential neighbourhoods, namely Forest Hill and Meinzinger Park to the north and Laurentian Hills to the south.
Approaching the Regional Road 28 (Homer Watson Boulevard) interchange – which provides access to Regional Road 4 (Ottawa Street) – retail and light industry in the Alpine neighbourhood begin to flank the southern side of the Conestoga Parkway. It then crosses over the Canadian National Railways Huron Park spur, the adjacent ION LRT line, and Schneider Creek immediately west of an interchange with Regional Road 53 (Courtland Avenue). Now serving as the boundary between the residential neighbourhoods of Rockway to the north and Vanier to the south, the route curves north-northeast to reach an interchange with the Freeport Diversion (also known as the King Street Bypass or Highway 8 expressway).
Northern leg
The portion of the Conestoga Parkway that travels perpendicular to King Street East follows alongside Montgomery Creek. Now eight-lanes wide, it passes over Weber Street and then curves north-northwest to avoid the Stanley Park Conservation Area, with the neighbourhoods of Eastwood to the west, and Stanley Park to the southeast. The parkway follows the former alignment of Edna Street north to Frederick Street, with the neighbourhoods of Auditorium and Central Frederick to the west, and Rosemount to the east. It briefly swerves northwards, passing under Frederick Street, Victoria Street and the Kitchener GO line in quick succession. An interchange serves both Frederick Street and Victoria Street, via the parallel roads of Regional Road 62 (Edna Street) and Regional Road 61 (Bruce Street); an interchange with Wellington Street follows soon thereafter. Due to the close proximately of these two interchanges, the Conestoga Parkway utilizes a brief local–express system for approximately 1.7 kilometres (1.1 mi).
Now passing through light industry in the Northward neighbourhood, the Conestoga Parkway makes a broad curve to the west to avoid the Grand River and meets Regional Road 29 (Lancaster Street), which features a partial interchange. The median barrier ends immediately after, and a grass median begins. To the south is the neighbourhood of Fairfield, while Bridgeport lies to the north. The route gradually curves back to the north and enters the city of Waterloo at Regional Road 9 (Bridgeport Road), with which there is an interchange.
The Conestoga Parkway enters into Waterloo with the suburban neighbourhood of Lincoln Heights to the west and greenfields and Betchel Park to the east. After 1.5 kilometres (0.93 mi), it crosses Laurel Creek and encounters an interchange with Regional Road 57 (University Avenue) before curving gradually to the west-northwest. With the neighbourhoods of Lincoln West to the south and Foxhunt to the north, the parkway encounters the first of two interchanges with Regional Road 15 (King Street North); Conestoga Mall lies to the northeast. It becomes parallel to Forwell Creek as it curves back northward, after which the parkway travels parallel to and east of the Waterloo Central Railway for the remainder of its length. An interchange with Regional Road 50 (Northfield Drive) also carries the ION LRT line over the route as it travels through an area of light industry. Just prior to the second interchange with King Street North, the Conestoga Parkway exits Waterloo into the township of Woolwich. Both the parkway and Highway 85 end approximately 350 metres (1,150 ft) north of King Street North, after which the four lane freeway narrows and is known as Waterloo Regional Road 85.
History
Planning and construction
Although the concept of a ring road around Kitchener and Waterloo originated from the Kitchener-Waterloo and Suburban Planning Board in 1948, actual consideration was not given to it until it was recommended by a 1961 traffic study. By then, the opening of Highway 401 was attracting business away from the rapidly growing twin cities. Land was gradually purchased over the intervening years and picked up considerably when plans for the expressway system were first raised in late 1962. The ring road prior to this point had evolved to a proposed pair of east–west and north–south four lane boulevards known as Henry Strum Boulevard and Dryden Boulevard. However, Kitchener planning director Bill Thompson changed this to a single controlled-access highway. The Department of Highways had already begun construction in the fall of 1961 on the Freeport Diversion, providing a new divided crossing of the Grand River along Highway 8. The diversion, connecting with King Street south of the Grand River and at Fergus Street, was completed in 1963.
The provincial government reached a funding arrangement with Kitchener and Waterloo to cover 75% of the expected C$22 million ($211 million in 2023 dollars). cost, and officially announced the Kitchener–Waterloo Expressway on May 21, 1964. The province eventually took over authority for the entire project in August 1965. Construction began in February 1966 with the awarding of a C$3 million ($26.9 million in 2023 dollars). contract to rebuild 2.7 kilometres (1.7 mi) of King Street into a four lane divided highway from Fairway Road (renamed from Block Line Road in 1965) to Doon Road, including the half cloverleaf interchange that would serve the western and northern legs of the expressway system. A ground-breaking ceremony was held in the fall of that year, with dignitaries taking turns driving a bulldozer. In anticipation of the long-term construction, Highway 8 was redirected along Fairway Road, Mill Street (now Vanier Drive) and the short section of Henry Sturm Boulevard that was constructed from Ottawa Street and Highland Road to Mill Street. The reconstruction of King Street was completed and opened in November 1967.
The Kitchener–Waterloo Expressway was unofficially renamed the Conestoga Parkway in January 1967 by a joint committee of the two cities. A shortlist of 12 publicly-submitted names was prepared, and included Mackenzie King, John Patrick, Eby-Erb (early Mennonite settlers), Dan Detweiller (a founder of the Ontario hydroelectric system), Frederick Banting, Centennial, Pioneer, Grand Valley, Golden Triangle, The Kingsway, and Conestoga. The name, a reference to the Mennonite conestoga wagon used by early settlers, was chosen unanimously by the committee.
On the northern leg of the parkway, early works construction along Edna Street, including the removal of several dozen homes, began in 1966, and tenders were called for construction of the route from King Street to Frederick Street in September. Full construction on the C$1.9 million ($16.5 million in 2023 dollars). contract began in April 1967. It was completed and opened to traffic on September 19, 1968. Another contract, to build the parkway from Frederick Street and Bridgeport Road, was awarded that month for C$5.1 million ($42.6 million in 2023 dollars)., with construction beginning in October. On the western leg of the parkway, construction began in October 1967 on a C$3.6 million ($31.2 million in 2023 dollars). contract to build a 2.9-kilometre (1.8 mi) segment of the parkway from King Street to west of Homer Watson Boulevard. This section, which was built along the alignment of Henry Strum Boulevard, was opened to traffic between Courtland Avenue and King Street on November 25, 1968.
Work continued on the Conestoga Parkway into the early 1970s. On the northern leg, the segment under construction between Frederick Street and Bridgeport Road was completed and opened on October 5 or 6, 1970. Just over a month later, on November 13, the first portion of the expressway within Waterloo was opened ceremoniously by Minister of Highways George Gomme. Construction of this section, through undeveloped farmland between Bridgeport Road and the southern interchange with King Street North, took place beginning in 1969. On the western leg, a section between Courtland Avenue and Fischer-Hallman Drive opened on September 1, 1971, completing the Kitchener–Waterloo Expressway project.
By this time, construction was underway on a new two lane alignment of Highway 7/8, first announced in 1963, to connect the New Hamburg Diversion with the Conestoga Parkway at Fischer-Hallman Drive. It opened on August 13, 1973, bypassing the community of Baden. To the north, construction of a two lane alignment of Highway 85 to connect the Conestoga Parkway, at the southern intersection of King Street North, with the St. Jacobs Bypass began in 1974. The extension, which featured an at-grade intersection with Northfield Road and a grade-separation with the northern King Street North, was opened in late August, 1977.
Since completion
As each section of the Conestoga Parkway opened, the DHO moved portions of Highways 7, 8 and 85 onto it. By 1972, the current configuration of the three highways was established. However, in 1980 or 1981, Highway 85 was renumbered as Highway 86. It remained as such until the spring of 2003, when several highways in Ontario were renumbered to improve route number continuity and aid navigation. Among them was the renumbering of Highway 86 back to Highway 85, restoring the original numbering scheme of the parkway.
The two lane segment of Highway 7/8 from Fischer-Hallman Road west to Baden was originally slated to be twinned to four lanes in the 1980s, but the project was put off for a decade. Early works tree clearing got underway in 1991 before being put on hold for archeological excavations. Construction began to widen the route as far west as Waterloo Regional Road 12 (Queen Street), south of Petersburg, on July 6, 1992, with a planned completion by August 1993.
The Conestoga Parkway interchange with the Freeport Diversion. The flyover was constructed to remedy a half-cloverleaf infamous for weaving.The lack of a median barrier between the opposing lanes of the parkway led to numerous crossover collisions; between May 1990 and July 1993, eight deaths were directly attributed to vehicles crossing the grass median and striking vehicles in the opposing lane head on. Following the death of Laurie Brain on April 8, 1990, a coroners jury on October 9, 1991, recommended several immediate improvements to the parkway, including the installation of a median barrier as well as lowering the speed limit from 100 kilometres per hour (62 mph) to 90 kilometres per hour (56 mph). The speed limit was reduced to 90 km/h on January 11, 1994, while construction to install a barrier between Frederick Street and Lancaster Street began in July 1994. The work, which also included the construction of storm drainage, was completed by the summer of 1995. Construction of a barrier between Homer Watson Boulevard and Frederick Street began in July 1997, and was completed by November.
In the early 1990s, the provincial government announced plans to widen the Conestoga Parkway and Freeport Diversion, as well as to improve the interchange between the two. The project was broken into several phases, and included rebuilding the Ottawa Street and Franklin Street overpasses. Construction began in August or September 1998 to widen the Conestoga Parkway from four to six lanes between Courtland Avenue and King Street, from four to eight lanes between King Street and Ottawa Street, and from four to six lanes between Ottawa Street and Frederick Street. This stage of the project was completed in July 2000.
The expansion of Highway 8 from four lanes to eight lanes between the Conestoga Parkway and Fergus Avenue was originally scheduled to begin in 2001, but was delayed as businesses along Weber Street fought expropriation. Construction instead began in April 2002, which involved shifting one of the retaining walls further north and a new Franklin Street bridge to accommodate the eight lane cross-section freeway. Included with this project was a reconstruction of the bottle-necked interchange of the Conestoga Parkway and Highway 8, including a new flyover ramp from westbound Conestoga Parkway to eastbound Highway 8 to replace one of the two loop ramps, and realignment of the northbound to eastbound ramp. Both were completed and opened on June 11, 2004.
Construction began in 2012 to widen the parkway to six lanes from east of Courtland Avenue to west of Fischer-Hallman Road, including the installation of a median barrier. The C$130 million project was completed in 2016.
Future
Long term plans have called for the construction of a freeway link between Kitchener and Guelph, linking the Conestoga Parkway with the Hanlon Expressway (Highway 6). Although proposed in the 1980s, construction did not begin until 2015. Opposition arose due to the new alignment of this Highway 7 freeway passing through environmentally sensitive lands. In particular, the $25 million cost of the interchange between the new freeway and the Conestoga Parkway; the high cost is partly due to land acquisition to accommodate the proposed flyover ramps. This represents a quarter of the projected C$100 million budget for the total Highway 7 project. The Victoria Street overpass was demolished overnight on February 23–24, 2018, and was replaced with a new structure that reopened to traffic on October 28; the new bridge is longer and has a higher elevation to accommodate the future ramps between Highway 7 and the Conestoga Parkway.
Exit list
The following table lists the major junctions along the Conestoga Parkway, as noted by the Ministry of Transportation of Ontario. The entire route is located in the Regional Municipality of Waterloo. All exits are unnumbered.
Location | km | mi | Destinations | Notes | |
---|---|---|---|---|---|
Kitchener | 0.0 | 0.0 | Highway 7 west / Highway 8 – Stratford | Kitchener city limits; continuation of Highway 7 / Highway 8 | |
Regional Road 70 (Trussler Road) | |||||
2.9 | 1.8 | Regional Road 58 (Fischer-Hallman Road) | |||
5.5 | 3.4 | Regional Road 28 (Homer Watson Boulevard) Regional Road 4 (Ottawa Street) | |||
6.8 | 4.2 | Regional Road 53 (Courtland Avenue) | |||
8.2 | 5.1 | Highway 8 east (Freeport Diversion) to Highway 401 | Eastern end of Highway 8 concurrency | ||
9.5 | 5.9 | Regional Road 4 (Ottawa Street) | |||
11.0 | 6.8 | Highway 7 east (Victoria Street / Regional Road 55) Frederick Street (Regional Road 6) Highway 85 begins | Eastern end of Highway 7 designation; Highway 85 southern terminus; access to Victoria Street and Frederick Street via Bruce Street (northbound) and Edna Street (southbound) | ||
11.3 | 7.0 | Wellington Street | Future realignment of Highway 7 as part of the proposed Kitchener–Guelph freeway | ||
12.8 | 8.0 | Regional Road 29 (Lancaster Street) | Southbound exit and northbound entrance | ||
Waterloo | 13.7 | 8.5 | Regional Road 9 (Bridgeport Road) | ||
15.2 | 9.4 | Regional Road 57 (University Avenue) | |||
17.6 | 10.9 | Regional Road 15 (King Street North) | |||
18.9 | 11.7 | Regional Road 50 (Northfield Drive) | |||
Woolwich Township | 20.4 | 12.7 | Regional Road 15 (King Street North) | ||
20.7 | 12.9 | Highway 85 ends Regional Road 85 north | Highway 85 northern terminus; continues as Regional Road 85 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ Ministry of Transportation of Ontario (2016). "Provincial Highways Traffic Volumes 2016: King's Highways / Secondary Highways / Tertiary Roads". pp. 7–8, 28. Retrieved March 16, 2022.
- ^ "Conestoga Parkway – Length and Route" (Map). Google Maps. Retrieved May 7, 2022.
- ^ Ontario Back Road Atlas (Map). Cartography by MapArt. Mapart Publishing. 2022. p. 22. §§ D2–E3. ISBN 1-55198-226-9.
- "Ontario Moving Forward With New Highway 7" (Press release). Mike Harris. July 21, 2021. Retrieved March 15, 2022.
- Ministry of Transportation of Ontario Geomatics Office; Land Information Ontario (December 10, 2020). "Ontario Road Network - Ontario Provincial Highways". ArcGIS.com. Retrieved March 29, 2021.
- ^ Planning Communities (PDF) (Map). Cartography by Geospatial Data and Analytics, Technology Innovation and Services, Corporate Services. City of Kitchener. March 19, 2022. Retrieved March 20, 2022.
- "Drivers get feel of parkway". Waterloo Chronicle. June 19, 1968. p. 13. Retrieved March 20, 2022 – via Waterloo Public Library.
- "Nearby Neighbourhoods". City of Waterloo. Retrieved March 30, 2022.
- ^ "Expect Expressway Opening Soon". Waterloo Chronicle. December 13, 1962. pp. 1, 4. Retrieved March 4, 2022 – via Waterloo Public Library.
- "Expressway Objections Continue To Increase". Waterloo Chronicle. April 11, 1963. p. 1. Retrieved March 4, 2022 – via Waterloo Public Library.
- "Expressway Has Top Priority". Waterloo Chronicle. February 14, 1963. p. 1. Retrieved March 4, 2022 – via Waterloo Public Library.
- Outhit, Jeff (December 13, 2014). "Road Ahead: Father of expressway explains how it got built". The Record. Retrieved March 16, 2022.
- Outhit, Jeff (March 8, 2002). "Freeport Bridge to get $1.6-million overhaul". The Record. p. B1. ProQuest 266974851 (subscription required).
- Annual Report (Report). Ontario Department of Highway. March 31, 1962. p. 32. Retrieved March 6, 2022.
Work on the dual highway diversion of Highway 8 at Freeport, with structures, was begun in the fall of 1961.
- Annual Report (Report). Ontario Department of Highway. March 31, 1963. p. 31. Retrieved March 6, 2022.
- ^ 1688 to 1923: Geloso, Vincent, A Price Index for Canada, 1688 to 1850 (December 6, 2016). Afterwards, Canadian inflation numbers based on Statistics Canada tables 18-10-0005-01 (formerly CANSIM 326-0021) "Consumer Price Index, annual average, not seasonally adjusted". Statistics Canada. Retrieved April 17, 2021. and table 18-10-0004-13 "Consumer Price Index by product group, monthly, percentage change, not seasonally adjusted, Canada, provinces, Whitehorse, Yellowknife and Iqaluit". Statistics Canada. Retrieved 2024-05-08.
- "Expressway Unveiled For Kitchener Region". The Globe and Mail. May 22, 1964. p. 4. ProQuest 1282688633 (subscription required).
- "D Of H Take Over K-W Expressway". Waterloo Chronicle. August 11, 1965. p. 3. Retrieved March 4, 2022 – via Waterloo Public Library.
- "Start Soon On Kitchener Expressway". The Brantford Expositor. February 15, 1966. p. 3. Retrieved March 4, 2022 – via Newspapers.com.
- "'67 Parkway Construction Hits $11 Million". Waterloo Chronicle. December 27, 1967. p. 3. Retrieved March 4, 2022 – via Waterloo Public Library.
- ^ Thompson, Bill (2014). "Commencement of Construction for the Expressway". The Conestoga Parkway vision to reality: with some stories and events along the way. Pandora Print Shop. p. 61.
- Kitchener - Breslau (Kitchener East), Ontario. Map Sheet 40P/08E (Map) (1 ed.). 1:25,000. Cartography by Surveys and Mapping Branch. Department of Energy, Mines and Resources. 1968. Retrieved March 4, 2022 – via Scholars GeoPortal.
- Mills, Rych (October 22, 2016). "Flash From the Past". The Record. Retrieved March 4, 2022.
- Annual Report (Report). Ontario Department of Highway. March 31, 1968. p. 10.
In November the first major contract for the Kitchener-Waterloo Expressway, a two-mile section of King Street in Kitchener, was completed.
- Mills, Rych (June 21, 2019). "History preserved: The story of the Detweiler meetinghouse". The Record. Retrieved March 20, 2022.
- "Choose Name For Expressway". Waterloo Chronicle. January 25, 1967. p. 1. Retrieved March 4, 2022 – via Waterloo Public Library.
- "Expressway News". Waterloo Chronicle. September 21, 1966. pp. 1, 6. Retrieved March 28, 2022 – via Waterloo Public Library.
- "Expressway News". Waterloo Chronicle. May 10, 1967. p. 11. Retrieved March 28, 2022 – via Waterloo Public Library.
- "Cabinet Pair Will Open X-Way Strip". The Record. September 10, 1968.
- "3-Day Delay on X-Way". The Record. September 14, 1968.
- "Oakville firm to build parkway to Bridgeport Rd". Waterloo Chronicle. September 19, 1968. p. 6. Retrieved March 28, 2022 – via Waterloo Public Library.
- "Parkway work progresses". Waterloo Chronicle. October 10, 1968. p. 3. Retrieved March 29, 2022 – via Waterloo Public Library.
- "Kitchener–Waterloo Expressway Design: King street to west of Homer Watson blvd". Waterloo Chronicle. October 11, 1967. p. 9. Retrieved March 4, 2022 – via Waterloo Public Library.
- "No Fanfare As X-way Link Opens". The Record. November 25, 1968.
- "Parkway links open". Waterloo Chronicle. October 1, 1970. p. 13. Retrieved March 29, 2022 – via Waterloo Public Library.
- "Another X-Way Link Opening Next Week". The Record. September 29, 1970.
- "Parkway opens". Waterloo Chronicle. November 12, 1970. p. 3. Retrieved March 29, 2022 – via Waterloo Public Library.
- "Expressway detours planned". Waterloo Chronicle. September 25, 1969. p. 15. Retrieved March 29, 2022 – via Waterloo Public Library.
- "All X-Way Open Now". The Record. September 1, 1971.
- "X-way link to Hamburg opens today". The Record. August 13, 1973.
- "To Build New Road". The Kingston Whig-Standard. Vol. 37, no. 217. August 17, 1963. p. 18. Retrieved March 14, 2022 – via Newspapers.com.
- "The finishing touch". Waterloo Chronicle. August 3, 1977. p. 8. Retrieved April 1, 2022 – via Waterloo Public Library.
- Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1972. Kitchener Waterloo inset. Retrieved April 1, 2022 – via Archives of Ontario.
- Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1980–81. South-Central Ontario inset. Retrieved April 1, 2022 – via Archives of Ontario.
- Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1982–83. South-Central Ontario inset. Retrieved April 1, 2022 – via Archives of Ontario.
- "Highway 86 on Parkway to be Changed to 86". The Record. February 12, 2002. p. B3. ProQuest 266993085.
- Ministry of Transportation (February 11, 2002). "Ontario government improves provincial highway numbering". Newswire. Archived from the original on August 4, 2002. Retrieved January 10, 2012.
- "Finishing the job". Kitchener - Waterloo Record. January 7, 1991. p. A6. ProQuest 275155011 (subscription required).
- "Archeologists scrape away time in Baden". Kitchener - Waterloo Record. May 30, 1991. p. B3. ProQuest 275240090 (subscription required).
- "Highway 7-8 "bottleneck" annoys Wilmot councillor". Kitchener - Waterloo Record. October 15, 1991. p. A15. ProQuest 275245441 (subscription required).
- "Highway widening to start on Monday". Kitchener - Waterloo Record. July 4, 1992. p. B1. ProQuest 275422550 (subscription required).
- Reinhart, Tony (July 23, 1993). "Parkway safety plea reaches legislature". The Record. p. B1. ProQuest 275529630 (subscription required).
- Reinhart, Tony (October 10, 1991). "Widen parkway, add barriers, jury says". The Record. p. B1. ProQuest 275338463 (subscription required).
- "Speed limit drops to 90 on parkway". The Record. January 11, 1994. p. A1. ProQuest 275445480.
- Roe, John (July 28, 1994). "Parkway median construction begins". The Record. p. B2. ProQuest 275338569 (subscription required).
- "Clear driving on parkway this summer". The Record. June 16, 1995. p. B3. ProQuest 275395447 (subscription required).
- "Work starts on safer parkway". The Record. July 23, 1997. p. B2. ProQuest 275476697 (subscription required).
- Cannon, Steve (October 23, 1997). "Barriers nearly up on parkway". The Record. p. B10. ProQuest 275504042 (subscription required).
- Crone, Greg (February 11, 1992). "Province must find alternative to road widening, Wagner says". The Record. p. B2. ProQuest 275282812 (subscription required).
- Crowley, Kevin (February 13, 1998). "Parkway plans miff neighbors". The Record. p. B1. ProQuest 275522021 (subscription required).
- "Parkway upgrade begins". The Record. July 9, 1998. p. B2. ProQuest 275553956 (subscription required).
- Goodwin, Carol (July 21, 2000). "Overpass woes will blossom in spring". The Record. p. B01. ProQuest 266880910 (subscription required).
- Burtt, Bob (October 12, 2001). "Highway 8 project on back burner". The Record. p. A01. ProQuest 266960877 (subscription required).
- Caldwell, Brian (April 27, 2002). "Highway bottleneck surgery starts". The Record. p. A1. ProQuest 266981212 (subscription required).
- "Enjoy the ride". The Record. June 10, 2004. p. A12. ProQuest 267094832 (subscription required).
It cost $29 million and took three years of construction work, but the most loathed and clearly one of the most dangerous interchanges in Waterloo Region is being closed and replaced by a new flyover. If the weather co-operates, this two-lane, 800-metre long engineering marvel which boasts its own automatic, de-icing system will open in time for tomorrow morning's rush hour.
- "Bridges to be replaced during upgrade". The Record. April 8, 2013. p. A1. Retrieved April 8, 2022.
- "Sign off? Overhead billboard will light up when Highway 7/8 widening finishes". The Record. January 22, 2016. p. B3. ProQuest 1758853564 (subscription required).
- "4 lane Kitchener-Guelph link 32 years in the making". CBC News. September 7, 2017. Retrieved April 5, 2022.
- Outhit, Jeff (September 7, 2017). "New Highway 7 delayed again as 28 years of planning drags on". The Record. Retrieved April 5, 2022.
- "Design and Construction Report – Detailed Design Study to Advance Construction for Highway 7 New: Victoria Street Widening and Bridge Replacement and Shirley Avenue Extension and Widening" (PDF). MMM Group. February 3, 2016. Retrieved April 5, 2022.
- Phillips, Hayden (February 25, 2018). "Victoria Street bridge gone, Conestoga Parkway open". CTV News. Retrieved April 5, 2022.
- "Kitchener's Victoria Street bridge reopening for Monday commute". CBC News. October 25, 2018. Retrieved April 5, 2022.
- "New Highway 7 – Kitchener to Guelph". New Highway 7. Ontario Ministry of Transportation. Retrieved May 6, 2024.
- The Regional Municipality of Waterloo (June 2020). Region of Waterloo [Region Base Map] (PDF) (Map). 1:100,000. Cartography by Information & Technology Services. The Regional Municipality of Waterloo.
External links
KML file (edit • help) Template:Attached KML/Conestoga ParkwayKML is not from WikidataNumbered roads in Waterloo Region | |
---|---|
Regional roads | |
Highways and expressways | |
Roads in Ontario |
Controlled-access highways of Ontario | |||||||
---|---|---|---|---|---|---|---|
400-series highways | |||||||
Other provincial freeways | |||||||
Municipal expressways |
| ||||||
Limited access | |||||||
Future & Proposals |
|
Kitchener, Ontario | |
---|---|
History | |
Geography | |
Politics | |
Public services | |
Culture | |
Museums | |
Transportation | |
Sports | |
List of municipalities in Ontario |