Misplaced Pages

Perth Stadium railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Railway station in Perth, Western Australia

Perth Stadium
Perth Stadium station in December 2017
General information
LocationVictoria Park Drive, Burswood, Western Australia
Australia
Coordinates31°57′00″S 115°53′34″E / 31.94995°S 115.892876°E / -31.94995; 115.892876
Owned byPublic Transport Authority
Operated byTransperth Train Operations
Line(s)     Armadale line
Distance3.2 kilometres (2.0 mi) from Perth
Platforms6 platform faces on 3 island platforms
Tracks6
Construction
Structure typeGround
AccessibleYes
Other information
Fare zone1
History
Opened2 December 2017
Services
Preceding station Transperth Transperth Following station
ClaisebrookFree Transit Zonetowards Perth Armadale line Burswoodtowards Armadale
Events
PerthFree Transit ZoneTerminus Armadale lineStadium Shuttle Terminus
Terminus Yanchep line Leedervilletowards Yanchep, Clarkson or Whitfords
Fremantle line City Westtowards Fremantle
Location
Location of Perth Stadium railway station

Perth Stadium railway station is a railway station in Burswood, Western Australia, next to Perth Stadium (known under sponsorship as Optus Stadium). It is located on the Armadale Line With six platforms, the station is the second largest on the Transperth network, after Perth railway station.

Before and after events, there are special services which run direct for the Fremantle line and Yanchep line.

Description

Perth Stadium station is along the South Western Railway, which links Perth to Bunbury. The northern 30.4 kilometres (18.9 mi) of this railway, between Perth and Armadale, is used by Armadale line suburban rail services as part of the Transperth network. The line and the station is owned by the Public Transport Authority (PTA), an agency of the Government of Western Australia.

Perth Stadium station is to the east of Perth Stadium and to the west of the Graham Farmer Freeway, underneath Victoria Park Drive within the Perth suburb of Burswood, Western Australia. Adjacent stations are Claisebrook station to the west and Burswood station to the south-east.

The station has two concourses: the western concourse and the eastern concourse. The western concourse is north-west of Victoria Park Drive, and is only accessible on event days. That concourse is used to access platforms three and four. The eastern concourse is south-east of Victoria Park Drive and can be accessed from the stadium using an underpass under that road. That concourse can be used to access all platforms. Both concourses have stairs and lifts down to ground level, and toilets at their entrance.

The station is designed to move over 28,000 people following an event, nearly half of the stadium's 60,000 person capacity.

The station is listed as an independent access station on the Transperth website as the platform can be accessed using lifts, the platform gap is small, and tactile paving is in place.

History

Perth Stadium station under construction, May 2016
Panorama of the southern concourse

On 18 October 2013, Belmont Park railway station was closed to make way for the Perth Stadium railway station.

In October 2014, three parties were shortlisted to bid for the construction of the station:

The contract was awarded to Laing O'Rourke/AECOM in March 2015, with a targeted completion date of late 2017.

In January 2015, a 1.4 kilometre section of the line between Goongoongup Bridge and Burswood station was moved closer to the Graham Farmer Freeway to facilitate construction of the station.

Construction of the station commenced in August 2015

Construction was completed in December 2017, before the stadium's opening in January 2018.

The station was announced as complete in a media statement from the state government on 2 December 2017.

The station hosts its first major event - the free Community Open Day on Sunday January 21, 2018

The station dropped its status as a 'Special Event Station' as trains on the Armadale Line began stopping at the station during the week from Tuesday, 2 April 2024

Platforms and services

Track layout
Legend
51
62
3
4
Source

Trains serving Perth Stadium station are operated by Transperth Train Operations, a division of the PTA.

On days with no events, the station is served by Armadale line services. This means a frequency of four trains per hour during the day, with a lower frequency at night. Perth-bound trains use platforms 1 and 2, and Armadale-bound trains use platforms 5 and 6, with only platforms 2 and 5 operating on days with no events

For full-capacity events at Perth Stadium, the station is also served by direct services from the Fremantle and Yanchep lines, which operate in addition to regular services along those lines. Fremantle line trains use platform 3 and Yanchep line trains use platform 4. There is also a shuttle which goes from Perth Stadium station to Perth station, which can be used to transfer to and from the Mandurah line, Midland line and the previously mentioned lines. Before events, the station is served by Thornlie line services, but after events, the Thornlie line does not operate, so patrons have to catch the Armadale line to Cannington railway station and then catch a rail replacement bus. Services may vary for events not projected to be full capacity. Prior to the station opening, the proportion of passengers for each line was predicted to be 3,000 for the Armadale line, 2,800 for the Fremantle line, 7,500 for the Yanchep line (then known as the Joondalup line) and 10,700 for the Mandurah line.

Platforms currently in use are as follows:

Perth Stadium station platforms
Stop Platform Line Stopping pattern Destination Notes
99031 1 Armadale Perth Stadium shuttle Perth Events only.
99032 2 Armadale All stations Perth
99033 3 Armadale Perth Stadium shuttle Terminus Events only.
Fremantle Fremantle Events only.
99034 4 Armadale Perth Stadium shuttle Terminus Events only.
Yanchep Yanchep Events only.
99035 5 Armadale All stations Victoria Park
99036 6 Armadale Perth Stadium shuttle Terminus Events only.

See also

References

  1. Arnold, John (2006). A History of Bringing the Rails to Pinjarra : The Southwest Railway of Western Australia. p. 12. ISBN 0646142283.
  2. "Manual – Rail Access" (PDF). Public Transport Authority. 30 August 2021. Archived from the original (PDF) on 21 September 2021. Retrieved 20 September 2021.
  3. ^ "Armadale/Thornlie Line Train Timetable" (PDF). Transperth. 15 July 2024. Retrieved 3 August 2024.
  4. "Public Transport Authority: Railway System: April 2019" (PDF). Public Transport Authority. April 2019. Archived (PDF) from the original on 24 July 2019. Retrieved 8 April 2022.
  5. ^ "Perth Stadium Station – Access Map" (PDF). Transperth. Retrieved 30 April 2022.
  6. ^ "Getting to and from Optus Stadium: A guide to using the new public transport system" (PDF). AFL.com.au. Retrieved 30 April 2022.
  7. ^ Freestone, Jamie (2 December 2017). "Perth Stadium Station officially open ahead of ground's first event in January". The West Australian. Retrieved 30 April 2022.
  8. "Perth Stadium Station". Transperth. Retrieved 30 April 2022.
  9. "Belmont Park stop to give way to Stadium Station". Government of Western Australia. 28 August 2013. Archived from the original on 5 November 2016. Retrieved 5 November 2016.
  10. "Perth's Belmont Park station to close in October in preparation for new stadium station". Urbanlyst. 2 September 2013. Retrieved 5 November 2016.
  11. Trio competes for Perth stadium rail contract Construction Industry News 27 October 2014
  12. Three groups shortlisted to build Perth's new stadium station Urbanlyst 28 October 2014
  13. Perth stadium station contract let The West Australian 19 March 2015
  14. "Armadale line moved to allow Perth Stadium station construction to commence" Railway Digest March 2015 page 26
  15. Stadium Station New Perth Stadium
  16. Cookson, Jasmine. "Perth Stadium train station complete ahead of venue's January opening". Australian Broadcasting Corporation. Retrieved 4 October 2018.
  17. ^ "Perth Stadium Station now complete". Media Statements. 2 December 2017. Archived from the original on 11 December 2021. Retrieved 30 April 2022.
  18. "Trains now stopping at Perth Stadium precinct seven days a week | Western Australian Government". www.wa.gov.au. Retrieved 3 August 2024.
  19. "Manual – Rail Access" (PDF). Public Transport Authority. 19 August 2022. Archived (PDF) from the original on 1 September 2022. Retrieved 10 September 2022.
  20. "Transperth". Public Transport Authority. Retrieved 30 April 2022.
  21. Farrell, Michael. "SmartRider". Metrodroid Wiki. GitHub. Archived from the original on 12 November 2020. Retrieved 3 August 2022.
  22. "Stops Near You (99031)". Transperth. Government of Western Australia. Archived from the original on 3 August 2022. Retrieved 3 August 2022.

External links

Public Transport Authority of Western Australia railway stations
Transperth services and stations
Armadale line
Transwa services and stations
  • Stations and services in italics are planned or under construction
  • Stations in (brackets) are uncommon stops for the listed service
Categories: