Misplaced Pages

Pinaka multi-barrel rocket launcher

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Pinaka Multi Barrel Rocket Launcher) Indian long-range multiple launch rocket system

Pinaka
Pinaka multi-barrel rocket launcher
TypeMultiple launch rocket system
Place of originIndia
Service history
Used bySee Operators
WarsKargil War
Production history
DesignerArmament Research and Development Establishment (DRDO)
Designed1986-present
Manufacturer
Unit cost430 crore (equivalent to ₹506 crore or US$61 million in 2023) per regiment
Produced1994-present
VariantsSee Specifications
Specifications
Length2.91–5.17 m (9 ft 7 in – 17 ft 0 in)
Diameter122–214 mm (4.8–8.4 in)

Caliber
  • 122 mm (4.8 in) (ERR 122)
  • 214 mm (8.4 in) (Pinaka Mk-I, Mk-I Enhanced, Mk-II, Mk-II ER)
Barrels12
Elevation55°
Traverse90°
Rate of fire12 rockets per launcher or 72 rockets per battery under 44 seconds
Effective firing range37.5 km (23.3 mi) to 75 km (47 mi)
Maximum firing range90 km (56 mi)
WarheadHMX (high explosive fragmentation, cluster munition–incendiary, anti-personnel, anti-tank, mine-laying)
Warhead weight100 kg (220 lb) to 250 kg (550 lb)
Detonation
mechanism
Contact, proximity and electronic time fuze

EngineT-930 multi-fuel turbocharged V8 engine with intercooler
Payload capacity22 tonne
SuspensionLeaf spring and air suspension with telescopic shock absorbers
PropellantHigh-energy composite solid fuel
Operational
range
~800 km
Flight altitude40 km (25 mi)
Maximum speed Rocket: Mach 4
Launcher: 80 km/h (50 mph)
Guidance
system
Ring laser gyro inertial navigation with GPS/NavIC satellite guidance
Accuracy>7 m to <60 m CEP (Trajectory Correction System: <30 m)
TransportBEML-Tatra T813 8WD
BEML-Tatra T815 8WD

Pinaka (from Sanskrit: पिनाक, see Pinaka) is a multiple rocket launcher produced in India and developed by the Defence Research and Development Organisation (DRDO) for the Indian Army. It is also called India's Grad missile system as it's characteristics are derived from BM-21 Grad. The system has a maximum range of 45 km (28 mi) for Mark-I Enhanced and 90 km (56 mi) for Mark-II ER version, and can fire a salvo of 12 HE rockets per launcher in 44 seconds. The system is mounted on a Tatra truck for mobility. Pinaka saw service during the Kargil War, where it was successful in neutralising Pakistani positions on the mountain tops. It has since been inducted into the Indian Army in large numbers.

In April 2013, 1,388.80 crore (equivalent to ₹24 billion or US$280 million in 2023) was sanctioned for increasing the production capacity of Pinaka rockets from then 1,000 to 5,000 per year. Unutilised land of the Yantra India Limited was also being considered for further capacity expansion when production of advanced variants would commence. The expansion was completed by 2014.

Development

The Indian Army operates the Russian BM-21 Grad Launchers. In 1981, in response to the Indian Army's need for a long range artillery system, the Indian Ministry of Defence (MoD) sanctioned two confidence building projects. In July 1983, the Army formulated their General Staff Qualitative Requirement (GSQR) for the system. In December 1986 MoD sanctioned 26.47 crore (equivalent to ₹360 crore or US$43 million in 2023). Armament Research & Development Establishment (ARDE) was appointed the System Coordinator for the project. The project included seven other laboratories DRDO like Combat Vehicles Research and Development Establishment (CVRDE), High Energy Materials Research Laboratory (HEMRL) and Electronics and Radar Development Establishment (LRDE).

DRDO was to fabricate seven launcher vehicles, of which six were to be supplied to the Army for user trials, three replenishment-cum-loader vehicles including two for the Army’s user trials, one command post vehicle. Induction was planned at the rate of one Regiment per year from 1994 onwards. This system would eventually replace the Grads.

Mark 1

Development began in December 1986, with a sanctioned budget of 26.47 crore (equivalent to ₹360 crore or US$43 million in 2023). The development was to be completed in December 1992. As per a report the prototype was rolled out by 1992. The user trials of the system by the Army began by February 1999 after the developmental trials. A section of two launchers were deployed in June of 1999 during the Kargil War under the 121 Rocket Regiment. The user trials ended in December 1999. The first order for full-rate production was placed with Ordnance Factory in 2007.

The Pinaka is in the process of further improvement. Israel Military Industries teamed up with DRDO to implement its Trajectory Correction System (TCS) on the Pinaka, for further improvement of its CEP. This has been trialled and has shown excellent results. The rockets can also be guided by GPS to improve their accuracy. A wraparound microstrip antenna has been developed by DRDO for this system.

Pinaka-ER.

To decrease single source dependency from Ordnance Factory Board (OFB) and increase competition in product pricing front, final developmental trials of Pinaka manufactured fully by Indian private sector Solar Industries under transfer-of-technology agreement from DRDO were successfully conducted by Indian Army at Pokhran Range on 19 August 2020. The trials of rockets developed by Economic Explosives Ltd. (subsidiary of Solar Industries Group) and Yantra India Limited-Munitions India Limited (YIL-MIL) are underway for two variants, Mk-I Enhanced and Mk-I ADM. The order for these variants are to be placed with one or two of the competitors in order to replace the shorter ranged Mk-I variant rockets.

Mark 2

Pinaka rockets being fired in salvo mode on 20 December 2019.

Pinaka Mk II is being developed by Armament Research and Development Establishment (ARDE), Pune; Research Centre Imarat (RCI), Hyderabad; and Defence Research and Development Laboratory (DRDL), Hyderabad. Another variant of Mark II called Guided Pinaka is equipped with a navigation, guidance, control kit and has considerably enhanced the range and accuracy of the missile. The range of the missile is estimated to be between 60 km-75 km at all ranges.

Sagem completed delivery of its Sigma 30 laser-gyro artillery navigation and pointing system for 2 of the Pinaka MBRL systems in June 2010. The Sigma 30 artillery navigation and pointing system is designed for high-precision firing at short notice. The systems would be integrated by Tata Power SED and Larsen & Toubro. The system was ordered in February 2008.

Pinaka Mark 2 manufactured by Solar Industries completed User Assisted Technical Trial (UATT) on 8 December 2021 and will now go for user trial which will be completed by March 2022. While Yantra India Limited-Munitions India Limited (YIL-MIL) is developing prototype of Pinaka Mark 2 due to delay in transfer of technology by ARDE as of December 2021.

As of September 2022, Defence Acquisition Council (DAC) has cleared the procurement proposal of induction of Guided Pinaka variant.

The Flight Trials as part of Validation Trials were completed in November 2024.

Further development

In 2005, ARDE revealed about the development of a long range MRL similar to the Smerch MRLS. A 7.2-metre rocket for the Pinaka MBRL, which can reach a distance of 120 km and carry a 250 kg payload will be developed. These new rockets can be fired in 44 seconds, have a maximum speed of Mach 4.7, rise to an altitude of 40 km before hitting its target at Mach 1.8. Integrating UAVs with the Pinaka is also in the pipeline, as DRDO intends to install guidance systems on these rockets to increase their accuracy.

On 17 January 2024, reports revealed that DRDO is developing two new variants of Pinaka rockets, one with a range of 120 km and the other with a range of over 200 km.

On 24 January 2024, few other reports revealed that the range of the rockets shall be 120 km and 300 km, respectively. The development of new variants have been approved by the Indian Army. While the 120 km rocket is to have the same calibre as of the earlier variants (214 mm), enabling it to be fired from earlier launchers, the Preliminary Services Qualitative Requirements of the other variant is being chalked out.

In September 2024, Lieutenant General Adosh Kumar, the Director General of the Regiment of Artillery, stated that future plans for the Pinaka include first doubling the range of the rockets, and then later increasing the range to almost four times the current range.

Ramjet propulsion

A group of researchers led by Lieutenant General P.R. Shankar, a professor in the aerospace department at IIT Madras and the former Director General of Artillery for the Indian Army Combat and Combat Support Arms, are developing ramjet propulsion technology that will be incorporated into the Pinaka rockets. It is anticipated that the range of 210–214 mm rocket will increase at 225–250 km with the addition of ramjet propulsion, all the while preserving the operational flexibility of the system.

Testing

This list is incomplete; you can help by adding missing items. (September 2024)
Pinaka MBRL firing
  • The first tests of the rocket system (Pinaka Mk-I) was conducted in late 1990, around 1995.
  • User trials of the Pinaka Mk-I was carried out from February to December in 1999. It also took part in the Kargil War.
  • From 30 and 31 January 2013, at least three rounds of Pinaka Mk-II were successfully fired from the test range of Proof and Experimental Establishment (PXE) at Chandipur for developmental trials. The tests were conducted by personnel of Armament Research & Development Establishment (ARDE) between 11:00 am and 12:00 pm IST.
  • On 28 July 2013, successful firing trials of Pinaka Mk-II were conducted in the Chandan area of Pokhran by DRDO and Army personnel. The rockets destroyed the targets in Keru area, 30 km from the point of launch.
  • On 7 August 2013, tests for two rounds of Pinaka Mk-II fired from the test range of Proof and Experimental Establishment (PXE) at Chandipur failed to provide desired results.
  • On 20 December 2013, six rounds of Pinaka Mk-II were successfully fired from the test range of Proof and Experimental Establishment (PXE) at Chandipur for developmental trials. This test, conducted by ARDE personnel, was reportedly conducted post a failed attempt to test the same variant four months back in August.
  • On 30 May 2014, Pinaka Mk-II were successfully fired from the test range of PXE at Chandipur by ARDE. The rockets were launched at a range of 61 km against its then maximum range of 65 km.
  • From 20 to 23 May 2016, four rounds of the Pinaka Mk-II were successfully fired from the test range of Proof and Experimental Establishment (PXE) at Chandipur-on-sea for testing a new guidance system.
  • On 12 January 2017 and 24 January 2017, two successful tests of the Pinaka Mk-II was conducted with range of 65 km and 75 km respectively from Launch Complex-III, Integrated Test Range, Chandipur.
  • On 30 May 2018, two rounds of tests of the Pinaka Mk-II were successfully conducted from Launch Complex-III, ITR, Chandipur. Another round of tests was conducted successfully on 11 March 2019.
  • On 19 December 2019, Pinaka Mk-II version was tested at a range of 75 km.
  • On 20 December 2019, two Pinaka Mk-II variant rockets were fired in salvo mode at an interval of 60 seconds at low range of 20 km at 11:00 am IST from Integrated Test Range, Chandipur. The proximity fuse initiation and accuracy at low ranges. The newer Pinaka Mk-II ER variant was reported to be flight tested at a range of up to 90 km.
  • On 19 August 2020, Pinaka Mk I Enhanced variant rockets, manufactured by Economic Explosives Ltd. of Solar Group, were tested successfully from Pokhran Range, Rajasthan. This was the first time in India that a munition of this kind was manufactured and tested by a private sector company. On 20 August 2020, trials for Pinaka Guided was carried out for the first time.
  • On 4 November 2020, a series of 6 Pinaka Mk I Enhanced variant rockets, manufactured by Economic Explosives Ltd. of Solar Group, were tested successfully from Integrated Test Range, Chandipur. The variant is expected to replace the older Mark I variant in production. This time DRDO has decreased the size of the rockets compared to the older generation Mark I.
  • On 24 June 2021, DRDO successfully fired 25 Pinaka Mk I Enhanced variant at a range of 45 km in quick succession mode as part of saturation attack simulation. The rockets were manufactured by EEL. On 25 June 2021, DRDO successfully test fired 40 km range 122 mm calibre rocket which are made to replace the older BM-21 Grad rockets in the Indian Army.
  • December 2021 trials: A total of 24 rockets of multiple variants were fired at Pokhran Range.
    • On 8 December 2021, Pinaka Mk-I Enhanced was successfully tested at a range of 45 km. The variant was manufactured by Economic Explosives Ltd (EEL). The User Assisted Technical Trial (UATT) of Pinaka Mk-II produced by EEL was also completed the same day. Further user trials for Pinaka Mk-II variants produced by both EEL and YIL is to undergo user trials by March 2022.
    • On 10 December 2021, Pinaka Area Denial Munition (ADM) variant, equipped with Dual-Purpose Improved Conventional Munition (DPICM) was tested. The tests included the rockets manufactured by both Economic Explosives Ltd (EEL) and Yantra India Limited (YIL). While both the manufacturers claimed success of the trials, it was confirmed that for the YIL's variant 96.6% of the DPICM exploded surpassing benchmark set at 90%. During these tests, ARDE evaluated locally developed Direct-Action Self Destruction (DASD) and Anti-Tank Munition (ATM) fuses.
  • In April 2022, a total of 24 Enhanced Pinaka Rocket System (EPRS) along with Pinaka ADM were fired at Pokhran Range for different ranges. The rockets developed by Yantra India Limited-Munitions India Limited (YIL-MIL) were flight tested during the trials.
  • In the last two weeks of August 2022, user trials of Pinaka Enhanced were conducted from both Pokhran Range and Integrated Test Range, Balasore. Rockets developed by both the manufacturers MIL and EEL successfully passed the trials.
  • On 14 November 2024, DRDO completed the final Flight Tests of Guided Pinaka Weapon Systems as part of Provisional Staff Qualitative Requirements (PSQR) Validation Trials. The tests were conducted in three phases in field firing ranges. The three parameters of PSQR, which are ranging, accuracy, consistency and rate of fire to engage multiple targets in salvo mode was assessed during the trials. A total of 12 rockets from each production agencies, Economic Explosives Ltd. (EEL) and Munitions India Limited (MIL), were tested from two launchers that were upgraded by the launcher manufacturers, Tata Advanced Systems Limited (TASL) and Larsen & Toubro (L&T).

Details

Pinaka is a complete MBRL system, each Pinaka battery consists of: six launcher vehicles, each with 12 rockets; six loader-replenishment vehicles; six replenishment vehicles; two Command Post vehicle (one stand by) with a Fire Control computer, and the DIGICORA MET radar (meteorological radar, provides data on winds). A battery of six launchers can neutralise an area of 1,000 m × 800 m.

The Army generally deploys a battery that has a total of 72 rockets. All of the 72 rockets can be fired in 44 seconds, taking out an area of 1 km. Each launcher can fire in a different direction too. The system has the flexibility to fire all the rockets in one go or only a few. This is made possible with a fire control computer. There is a command post linking together all the six launchers in a battery. Each launcher has an individual computer which enables it to function autonomously in case it gets separated from the other five vehicles in a war.

Modes of operation

The launcher can operate in the following modes:

Autonomous mode. The launcher is fully controlled by a fire control computer (FCC). The microprocessor on the launcher automatically executes the commands received from the FCC, giving the operator the status of the system on displays and indicators.

Stand-alone mode: In this mode, the launcher is not linked to the FCC operator, and the operator at the console enters all the commands for laying of the launcher system and selection of firing parameters.

Remote mode: In this mode, a remote control unit carried outside the cabin up to a distance of about 200 m can be used to control the launcher system, the launcher site and to unload the fired rocket pods from the launcher.

Manual mode: All launcher operations including laying of the system and firing are manually controlled. This mode is envisaged in the situations where the microprocessor fails or where there is no power to activate the microprocessor-based operator's console.

The Pinaka was tested in the Kargil conflict and proved its effectiveness. Since then it has been inducted into the Indian Army and series production has been ordered. The Pinaka MBRL is stated to be cheaper than other systems. It costs 2.3 crore (US$280,000) per system compared to the M270 which costs ₹19.5 crore (US$2.3 million).

Salient features

  • Use of state-of-the-art technologies for improved combat performance
  • Total operational time optimised for shoot & scoot capability
  • Cabin pressurisation for crew protection in addition to blast shields
  • Microprocessor-based fully automatic positioning and fire control console
  • Night vision devices for driver and crew
  • Neutralisation/destruction of the exposed troop concentrations, B-Class military land vehicles and other such soft targets
  • Neutralisation of enemy guns/rocket locations
  • Laying of anti-personnel and anti-tank mines at a short notice.

Orders

The Pinaka project has been a significant success for the DRDO and its development partners in developing and delivering a state of the art, high value project to the Indian Army's demanding specifications. While DRDO was responsible for the overall design and development, its partners played a significant role in developing important subsystems and components. They include Tata Power SED, Larsen & Toubro, Solar Industries, Munitions India Limited and Yantra India Limited. As of August 2024, of the total Pinaka systems in service with the Army, Tata has delivered 40 launchers and 8 Command Posts. Another 36 launchers were also on order with the same firm.

  • On 29 March 2006, the Indian Army awarded Tata Power SED and Larsen & Toubro's Heavy Engineering Division a contract worth ₹200 crore (equivalent to ₹642 crore or US$77 million in 2023), to produce 40 Pinaka MBRLs each for 2 regiments. Tata Power SED declared that it would be delivering the first units within six months. The deliveries were completed by 2010.
  • On 29 October 2015, the Defence Acquisition Council (DAC) chaired by the Defence Minister of India, cleared purchase of two more Pinaka regiments at a cost of ₹3,300 crore (US$400 million). On March 18, 2016, the Cabinet Committee on Security (CCS) cleared the purchase of two additional Pinaka regiments. As a consequence, a deal worth ₹200 crore (US$24 million) was signed with Tata Power SED for delivery of one regiment (20 launchers and 8 command posts). The contract was signed with BEML (for vehicles), Tata Power SED and Larsen & Toubro (for launchers and command posts) and Ordnance Factory Board (rocket ammunition). The entire order was placed in 2016 and all units have been delivered as of 2024.
  • In November 2016, the MoD has cleared a RFP for 6 additional regiments and was followed by Defence Acquisition Council (DAC) clearance in 2018. This led to the signing of a contract on 31 August 2020 for six additional regiments worth of launcher systems at 2,580 crore (equivalent to ₹30 billion or US$360 million in 2023) from Tata Power Company Ltd. (TPCL) and Larsen & Toubro (L&T). Defence public sector undertaking Bharat Earth Movers Ltd (BEML) which will provide the vehicles will also be part of the project. The contract will include "114 launchers with Automated Gun Aiming & Positioning System (AGAPS), 45 Command Posts to be procured from TPCL and L&T, and 330 Vehicles from BEML." This order included the procurement of Pinaka Mk-II variant of the MBRL.
  • On 13 December 2023, the Ministry of Defence cleared the acquisition of 6,400 Pinaka ADM Type 2 and Type 3 rockets at a cost of over 2,800 crore (US$340 million). Two main contenders for the order are Economic Explosives Ltd. (EEL) and Munitions India Limited (MIL).

Deployment

Pinaka Mk 1 Enhanced rocket, during testing on 4 November 2020.

Each Pinaka regiment consists of three batteries of six Pinaka launchers (total of 18 launchers); each of which is capable of launching 12 rockets with a range of 40+ km in a space of 44 seconds. In addition to these, a regiment also has support vehicles, a radar and a command post.

The Pinaka will operate in conjunction with the Indian Army's Firefinder radars and Swathi Weapon Locating Radar of which 36 are in service and 6 are on order. The Indian Army is networking all its artillery units together with the DRDO's Artillery Command & Control System (ACCS), which acts as a force multiplier. The ACCS is now in series production. The Pinaka units will also be able to make use of the Indian Army's SATA (Surveillance & Target Acquisition) Units which have been improved substantially throughout the late 1990s, with the induction of the Searcher-1, Searcher-2 and IAI Heron UAVs into the Indian Army, as well as the purchase of a large number of both Israeli made and Indian made Battle Field Surveillance radars. These have also been coupled with purchases of the Israeli LORROS Long-Range Reconnaissance and Observation System which is a combination of FLIR/CCD system for long range day/night surveillance.

In February 2000, the first Pinaka regiment was raised.

The first two regiments of Pinaka were inducted by 2010. As of 2016, the Indian Army had plans to operate 10 regiments by 2022 and further increase the numbers to 22 regiments within 2032. The Pinaka system will replace the older Grad MLRS regiments are being retired.

As of November 2024, 4 regiments of Pinaka have been inducted by the Army. More than 72 launcher units are active. 6 more regiments were ordered in 2020.

It was reported in March 2024, that the Army plans to raise 2 more Pinaka regiments by the end of year along Line of Actual Control.

Pinaka, Pralay, Nirbhay and BrahMos will become part of the Integrated Rocket Force (IRF), a separate entity from Strategic Forces Command (SFC).

Exports

Armenia signed a combined deal worth ₹2,000 crore (equivalent to ₹21 billion or US$254 million in 2023) for 4 Pinaka batteries and other defense equipment. The order includes supplies of extended range and guided rocket for Pinaka system in the future. The order has been supplied in July 2023. The deliveries were concluded by November 2024.

Indonesia and Nigeria have also shown interest in Pinaka multi-barrel rocket launcher.

According to a report in 2024, some Southeast Asian and European nations has also shown interest to acquire Pinaka MBRL and Netra AEW&C.

On 9 November 2024, Brigadier General Stephane Richou confirmed to Asian News International about the French Army evaluating Pinaka MBRL system for their requirement. This was mentioned during the visit of the high-ranking official who said that that "two countries share much more than just a business relationship and want to cooperate more".

Specifications

Pinaka Mk-I Pinaka ADM Pinaka Mk-I Enhanced Pinaka Mk-II Guided Pinaka Pinaka Mk-II ER ERR 122 Pinaka Mk-III Pinaka Mk-III ER/ Mk-IV
Range 37.5 km (23.3 mi) 45 km (28 mi) 60 km (37 mi) 75 km (47 mi) 90 km (56 mi) 40 km (25 mi) 120 km (75 mi) 200–300 km (120–190 mi)
Length 4.88 m (16.0 ft) 4.72 m (15.5 ft) 5.17 m (17.0 ft) 2.91 m (9 ft 7 in) 7.2 m (24 ft) Unknown
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 214 mm (8.4 in)
Warhead weight 100 kg (220 lb) 100 kg (220 lb) + additional 15 kg (33 lb) for guidance, navigation and control kit Unknown 21 kg (46 lb) 250 kg (550 lb)
Rocket Weight 277.4 kg (612 lb) 280 kg (620 lb) 325 kg (717 lb) 66.5 kg (147 lb) Unknown
Propellant Weight 100 kg (220 lb) 111 kg (245 lb) 131.5 kg (290 lb) 26.8 kg (59 lb)
Rate of fire Approximately 44 seconds. 40 rockets in 20 seconds
Accuracy ≤ 1.5% range ≤ 60m and <30m (CEP) with Trajectory Correction System ≤ 1.5% range
Salvo reload time 4 minutes. Unknown
Warheads PF, RHE DPICM PF, RHE HEPF, RHE
Detonation mechanism Contact + Delay, Electronic time and Proximity fuze Contact and Proximity fuze
Guidance Free flight INS + SATNAV Free flight
Flight stabilization 4 curved wrapped around fins 6 flat wrapped around fins 6 flat wrapped around fins (without fin cant) 4 curved wrapped around fins
Launching pod 2 detachable pods, each carrying 6 rockets Fixed cluster of 40 rockets
Launcher
  • Based on a Kolos Tatra truck for high mobility licence produced in India by BEML.
  • The truck features a central type regulation system; the driver can adjust the tyre pressure to suit the terrain for optimum mobility.
  • Six launchers per battery.
  • Launchers are NBC protected, have their own computerized fire control system, and automatic positioning system.
  • Designed for shoot and scoot fire missions by using inertial navigation system.
  • A battery (six launchers) can neutralize an area of roughly 1,000 × 800 m at 40 km range.
  • The launcher assembly has electro-magnetic elevation and traverse, with traverse being 90° left and right of the centreline and elevation up to 55°.
Upgraded BM-21 Grad by Larsen & Toubro. Based on Ashok Leyland Super Stallion chassis.
Status (as of December 2023) Inducted; mass production. DAC cleared procurement proposal. User trials complete. Under trials. Validation Trials completed. Under trials. Under trials. Under development. Under development.

Operators

Map of Pinaka MBRL operators in blue
  •  India
    •  Indian Army – 4 regiments (72+ launchers) of Pinaka Mk-I in service as of 2023. 6 Pinaka Mk-II regiments on order. Total 22 regiments of MK-I & MK-II are planned.

Potential Operators

See also

References

  1. ^ Arya, Shishir (11 December 2021). "Pvt co, PSU test firepower of Pinaka rocket new versions". The Times of India. Retrieved 11 December 2021.
  2. "Tata Group, L&T to build six Pinaka rocket regiments for Army". The Hindu. PIB. 31 August 2020. Retrieved 25 March 2022.
  3. "Indian MoD orders six regiments' worth of Pinaka multi-barrel rocket launchers". Janes.com. September 2020.
  4. "Pinaka Multibarrel Rocket Launcher". Archived from the original on 23 December 2014. Retrieved 23 December 2014.
  5. ^ "Pinaka Rocket". PIB. Archived from the original on 27 August 2017.
  6. "Rocket science [ID18D3] | Jane's 360".
  7. ^ "Enhanced version of PINAKA Rocket System successfully Flight Tested". Press Information Bureau. 4 November 2020. Retrieved 28 September 2024.
  8. ^ "Pinaka missile successfully test-fired, extended range version hit targets at 90 kms". ANI News. 20 December 2019. Retrieved 20 December 2019.
  9. "India to increase production of indigenously developed rocket 'Pinaka'". Business Standard India. Wayback Machine. 5 April 2015. Archived from the original on 14 February 2018. Retrieved 14 February 2018.
  10. "Pinaka rocket system wins DRDO award". Sakaal Times. 22 April 2013. Archived from the original on 4 October 2013. Retrieved 24 July 2013.
  11. "Union Government cleared 1500 crore Rupees Proposal for Pinaka Rockets". Jagran Josh. 25 March 2013. Archived from the original on 8 August 2013. Retrieved 24 July 2013.
  12. "Pinaka Rockets". PIB, Govt of India. Archived from the original on 11 December 2014. Retrieved 6 December 2014.
  13. ^ Katoch (Retd), Lt. General P.C. (4 January 2020). "Upgraded Pinaka Rocket System". spslandforces.com. Retrieved 27 June 2024.
  14. ^ "214mm Pinaka MBRL". Bharat Rakshak. Archived from the original on 3 October 2024. Retrieved 3 October 2024.
  15. ^ office_zzam (2 February 2013). "Successfully test fired for the Indian-made Pinaka 214mm MLRS Multiple". armyrecognition.com. Retrieved 29 September 2024.
  16. "TCS". Archived from the original on 20 October 2008. Retrieved 23 December 2014.
  17. "DRDO::Electronics". Archived from the original on 10 December 2008. Retrieved 23 December 2014.{{cite web}}: CS1 maint: unfit URL (link)
  18. ^ Pubby, Manu. "First rockets produced by private sector successfully test fired". The Economic Times. Retrieved 22 August 2020.
  19. Defaiya, Al (16 June 2010). "Al Defaiya | Sagem Developed and Produced Sigma 30 for Artillery Navigation". defaiya.com. Retrieved 3 October 2024.
  20. "Sagem delivers Sigma 30 for Pinakarocket launchers". defaiya.com. 30 June 2010. Archived from the original on 3 October 2024. Retrieved 3 October 2024.
  21. "India orders SIGMA 95 and SIGMA 30 systems from Sagem Défense Sécurité". Frontier India Defence and Strategic News Service. 22 February 2008. Archived from the original on 21 November 2008. Retrieved 23 May 2008.
  22. Peri, Dinakar (27 September 2022). "LAC standoff | Army deploys entire range of medium range artillery and long range rockets as part of reorientation". The Hindu. ISSN 0971-751X. Retrieved 27 September 2022.
  23. ^ "`DRDO successfully completes Flight Tests of Guided Pinaka Weapon System". Press Information Bureau. 14 November 2024. Retrieved 14 November 2024.
  24. ^ Mathews, Neelam (17 September 2020). "PREMIUM: India ignites production of Pinaka II rocket systems - Land Warfare - Shephard Media". Shephard. Retrieved 27 June 2021.
  25. "Indigenously developed Pinaka multi-barrel rocket launcher test fired successfully". www.domain-b.com. Retrieved 3 October 2024.
  26. "India tests multi-barrel rocket launcher". www.rediff.com. Retrieved 3 October 2024.
  27. Pubby, Manu (17 January 2024). "DRDO rushes to build 200km rockets with China in mind". The Economic Times. ISSN 0013-0389. Retrieved 17 January 2024.
  28. "India planning to develop 120 km, 200 km rockets for Pinaka system". India Today. 17 January 2024. Retrieved 30 September 2024.
  29. Bisht, Inder Singh (26 January 2024). "India Approves 300 Km Pinaka Multi-Barrel Rocket System". The Defense Post. Retrieved 29 September 2024.
  30. "Indian Army approves advanced rocket development". Janes. 25 January 2024. Retrieved 29 September 2024.
  31. Ray, Kalyan. "New howitzers, firing ranges near the LAC for Army amidst China boundary dispute". Deccan Herald. Retrieved 30 September 2024.
  32. "Local 155mm ammunition, broader production vendor base: Army counters supply issues amid Russia-Ukraine war". The Indian Express. 27 September 2024. Retrieved 30 September 2024.
  33. Peri, Dinakar (27 September 2024). "Long-range rockets, futuristic ammunition on Army wish list". The Hindu. ISSN 0971-751X. Retrieved 2 October 2024.
  34. Pillai, Joy (21 November 2024). "Bad news for Pakistan, China as Pinaka rocket launched range to increase three times, the team working on it is from..., it's not DRDO". india.com. Retrieved 25 November 2024.
  35. Shankar (retd), Lt Gen P. R. (26 September 2022). "Ramjet technology can counter China's long-range missiles, beat Himalayan terrain limitation". ThePrint. Retrieved 25 November 2024.
  36. "Enhanced version of Pinaka Mk-1 missile successfully flight-tested". The Indian Express. 4 November 2020. Retrieved 28 September 2024.
  37. "Explained: How India's lethal Pinaka weapon system is evolving". English.Mathrubhumi. 10 August 2024. Retrieved 28 September 2024.
  38. ^ Rout, Hemant Kumar (1 March 2013). "Pinaka rockets test fired successfully from Odisha coast". The New Indian Express. Retrieved 29 September 2024.
  39. "Successful Test of Pinaka 214mm MBRL". Archived from the original on 24 December 2013.
  40. "Second generation Pinaka multi-rocket system successfully test fired in Pokhran". The Times of India. 28 July 2013. ISSN 0971-8257. Retrieved 29 September 2024.
  41. ^ Rout, Hemant Kumar (30 May 2014). "Pinaka Mark-II Rocket Hits Target". The New Indian Express. Retrieved 29 September 2024.
  42. ^ "Successful Test of Pinaka MK-II Rocket System". Defence News. 21 December 2013. Archived from the original on 24 December 2013. Retrieved 22 December 2013.
  43. "Advanced Pinaka with new technology test fired". The New Indian Express. Archived from the original on 22 May 2016. Retrieved 23 May 2016.
  44. "Pinaka rockets test fired". The New Indian Express. Archived from the original on 25 May 2016. Retrieved 25 May 2016.
  45. "Guided Pinaka test fired successfully again - Times of India". The Times of India. Archived from the original on 24 January 2017. Retrieved 24 January 2017.
  46. "Guided Pinaka rocket successfully test fired". The Economic Times. Archived from the original on 24 January 2017. Retrieved 24 January 2017.
  47. Bhat, Aditya. "India tests new improved guided Pinaka rockets ahead of Republic Day 2017". International Business Times, India Edition. Archived from the original on 26 January 2017. Retrieved 24 January 2017.
  48. "Upgraded Pinaka rocket successfully test-fired, range now 70km". hindustantimes.com/. 30 May 2018. Retrieved 1 June 2018.
  49. "Upgraded Pinaka rocket successfully test-fired". The Economic Times. 30 May 2018. Retrieved 1 June 2018.
  50. "Boost to Indian Army artillery capability! Pinaka guided weapons system successfully test fired". 11 March 2019.
  51. "Pinaka missile system successfully flight-tested for 2nd day". The Economic Times. 20 December 2019. Retrieved 21 December 2019.
  52. ^ "Successful flight test of two Pinaka missiles in salvo mode". PIB. Ministry of Defence, Government of India. 20 December 2019. Retrieved 1 September 2024.
  53. Pandey, Mohit (20 December 2019). "Pinaka Missile System With Extended 90-Km Range Successfully Testfired Off Odisha Coast". News Nation English. Retrieved 27 June 2021.
  54. "DRDO successfully test-fires Pinaka missile system at Pokhran". The Times of India. 22 August 2020. ISSN 0971-8257. Retrieved 5 October 2024.
  55. Chandra, Girish (21 August 2020). "First Rockets Produced By Private Sector Successfully Test Fired". DefenceXP - Indian Defence Network. Retrieved 5 October 2024.
  56. Waje, Hemant (4 November 2020). "DRDO successfully test-fires advanced Pinaka rockets". Rediff. ANI. Retrieved 4 November 2020.
  57. Gupta, Shishir (4 November 2020). "India test-fires long range Pinaka rocket system, will be deployed to counter China". Hindustan Times. Retrieved 4 November 2020.
  58. Gupta, Shishir (28 June 2021). "India successfully test-fires Agni P, a new missile in Agni series". Hindustan Times. Retrieved 28 June 2021.
  59. "DRDO successfully test fires Enhanced Range 122mm Caliber Rocket". Press Information Bureau. 25 June 2021.
  60. Ray, Meenakshi (26 June 2021). "India successfully test-fires Pinaka rockets, can destroy targets up to 45km". Hindustan Times. Retrieved 27 June 2021.
  61. "Successful tests carried out for Pinaka Extended Range System, Area Denial Munitions & New Indigenous Fuses". Press Information Bureau. 11 December 2021. Retrieved 5 October 2024.
  62. Kulkarni, Sushant (16 December 2021). "Developed by two Pune-based facilities of DRDO, Pinaka-ER missile and ancillary systems tested successfully". The Indian Express. Retrieved 24 August 2022.
  63. "Pinaka Mk-I (Enhanced) Rocket System and Pinaka Area Denial Munition Rocket Systems successfully flight-tested by DRDO & Indian Army". Press Information Bureau. 9 April 2022. Retrieved 5 October 2024.
  64. Kulkarni, Sushant (10 April 2022). "Enhanced Pinaka ready for user trials after tests in Pokhran". The Indian Express. Retrieved 24 August 2022.
  65. "DRDO confirms successful trials of enhanced range Pinaka rockets in Pokhran, Balasore". ANI. 29 August 2022. Retrieved 5 October 2024.
  66. Anand, Nisha (24 August 2022). "Watch: Indigenous Pinaka extended range rockets running through trials". Hindustan Times. Retrieved 24 August 2022.
  67. @ANI (24 August 2022). "Trials of the Pinaka extended range rocket are going on in the Pokharan firing ranges in Rajasthan & multiple successful test firings have been carried out during these tests..." (Tweet). Retrieved 5 October 2024 – via Twitter.
  68. "Indian Army completes successful trial of indigenous Pinaka rockets". India Today. 30 August 2022. Retrieved 5 October 2024.
  69. "Latest Pinaka System Tested As France, Armenia Line-Up To Buy Indian Rockets". www.ndtv.com. Retrieved 14 November 2024.
  70. ^ Subramanian, T (15 October 2009). "Bang on target". Frontline Magazine (The Hindu). Archived from the original on 18 December 2010. Retrieved 29 May 2011.
  71. ^ Pinaka MRLS at Indian-Military.org Archived 2 August 2012 at archive.today
  72. "Pinaka Multi Barrel Rocket Launcher". Tata Advanced Systems. Retrieved 26 August 2024.
  73. "Tata, L&T bag orders for Pinaka rocket launcher". The Indian Express. 3 April 2006. Archived from the original on 17 December 2007. Retrieved 15 November 2007.
  74. ^ "DRDO successfully completes flight tests of guided Pinaka rocket system". Business Standard. 15 November 2024. Retrieved 18 November 2024.
  75. "Big boost: Army to get ammo worth Rs 15,000 cr - Times of India". The Times of India. 19 March 2016. Archived from the original on 19 March 2016. Retrieved 19 March 2016.
  76. "Tata Power SED wins Rs 200 crore order from defence". The Economic Times. 5 December 2016. ISSN 0013-0389. Archived from the original on 18 November 2024. Retrieved 18 November 2024.
  77. Raghuvanshi, Vivek (7 December 2016). "India Orders Homemade Rocket Launchers Despite Its Faulty Ammo". Defense News. Retrieved 18 November 2024.
  78. ^ "Indian Army looking at increasing Pinaka rocket regiments to 22 within a decade". The Economic Times. Archived from the original on 9 December 2016. Retrieved 9 December 2016.
  79. ^ Singh, Mayank (9 March 2024). "Army to raise 2 Pinaka regiments". The New Indian Express. Retrieved 9 March 2024.
  80. ^ PTI (1 September 2020). "Defence Ministry Inks Rs 2,580-Crore Deal To Procure Pinaka Rocket Launchers". TheWire.in. Archived from the original on 1 September 2020. Retrieved 1 September 2020.
  81. ^ "Further boost to 'Make in India'; MoD signs contracts worth Rs 2580 Cr with Indian Companies for supply of Pinaka Regiments to Indian Army". Press Information Bureau. 31 August 2020. Retrieved 27 June 2024.
  82. ^ "Indian MoD orders six regiments' worth of Pinaka multi-barrel rocket launchers". Janes.com. September 2020. Retrieved 17 January 2024.
  83. Som, Vishnu (31 August 2020). "Government Signs Rs 2,580 Crore Pact For Pinaka Rocket Launcher Systems". NDTV. Retrieved 29 August 2022.
  84. Dubey, Ajit (13 December 2023). "Defence Ministry approves Rs 2800 crore rockets for Pinaka weapon system". ANI. Retrieved 14 December 2023.
  85. "Ministry of Defence Government of India". Archived from the original on 29 August 2010. Retrieved 23 December 2014.
  86. "Defense19". Archived from the original on 23 December 2014. Retrieved 23 December 2014.
  87. Singh, Mayank (9 March 2024). "Army to raise 2 Pinaka regiments". The New Indian Express. Retrieved 18 November 2024.
  88. "Strengthening Artillery Power: India's Pinaka Rocket System Expansion". Financialexpress. 9 March 2024. Retrieved 9 March 2024.
  89. "Will India finally have a dedicated rocket force?". The Times of India. 17 May 2023. ISSN 0971-8257. Retrieved 15 November 2023.
  90. Bommakanti, Kartik (27 May 2023). "Integrated rocket force: Imperfect but a step in the right direction". Observer Research Foundation. Retrieved 15 November 2023.
  91. Pubby, Manu (29 September 2022). "Arming Armenia: India to export missiles, rockets and ammunition". The Economic Times.
  92. ^ Pubby, Manu (27 July 2023). "Pinaka reached Armenia via Iran". ThePrint.
  93. "India starts exporting Pinaka weapon systems to Armenia". The Times of India. ISSN 0971-8257. Retrieved 24 November 2024.
  94. "Armenia to get Pinaka rockets, Nigeria, Indonesia too shown interest: Defence firm Solar Industries".
  95. "DefExpo 2022: India to export Pinaka rocket launcher to Armenia; Nigeria, Indonesia show interest". 18 October 2022.
  96. "Made in India Netra, Pinaka Systems attract European, Southeast Asian interest". ANI News. 19 June 2024. Retrieved 21 June 2024.
  97. "France evaluating Pinaka multi-barrel rocket launcher system for its requirements: Top French Army officer". Asian News International. 9 November 2024. Retrieved 9 November 2024.
  98. ^ "France evaluating Pinaka multi-barrel rocket launcher system for its requirements: Top French Army officer". The Economic Times. 9 November 2024. Retrieved 9 November 2024.
  99. "India orders SIGMA 95 and SIGMA 30 systems from Sagem Défense Sécurité". Frontier India Defence and Strategic News Service. 22 February 2008. Archived from the original on 21 November 2008. Retrieved 23 May 2008.
  100. KK, Sruthijith (6 April 2013). "Ashok Leyland-L&T consortium emerges lowest bidder for Rs 100-cr contract". The Economic Times. Retrieved 30 June 2021.
  101. "Subhash Bhamre flags off Larsen & Toubro's defence systems". The Economic Times. 20 September 2018. Retrieved 30 June 2021.
  102. "Indian army Grad BM21 upgrade The vehicle platform for Grad BM21 Multi Barrel Rocket Launcher (MBRL) is an all-wheel drive, high mobility platform built for the Grad BM21 launcher..." www.facebook.com. Retrieved 27 August 2024.
  103. @strategicfront (20 September 2020). "IA's upgraded BM-21 Grad on an Ashok Leyland Super Stallion truck. The older Russian truck(Pic4) was replaced..." (Tweet). Retrieved 27 August 2024 – via Twitter.
  104. Dominguez, Gabriel (4 November 2020). "India tests enhanced version of rocket used by Pinaka MRL". Janes. Retrieved 4 November 2020.
  105. "Defence ministry approves Rs 2,800 crore rockets for Pinaka weapon system". The Times of India. 13 December 2023. ISSN 0971-8257. Retrieved 14 December 2023.
  106. "User trials of enhanced range Pinaka rockets successfully completed at Balasore, Pokhran - VISUALS". TimesNow. 29 August 2022. Retrieved 29 August 2022.
  107. Gupta, Shishir (4 November 2020). "India test-fires long range Pinaka rocket system, will be deployed to counter China". Hindustan Times. ANI. Retrieved 4 November 2020.
  108. Negi, Manjeet (17 January 2024). "India planning to develop 120 km, 200 km rockets for Pinaka system". India Today. Retrieved 17 January 2024.
  109. "India developing hypersonic missiles; Army looking to induct long-range rockets, loitering munitions, Pralay, Nirbhay missiles: Top official". ANI. 27 September 2024. Retrieved 30 September 2024.
  110. Pubby, Manu (29 September 2022). "pinaka: First Pinaka export: Private companies to lead from front". The Economic Times. Retrieved 12 August 2023.
  111. "The Geopolitical Implications of India's Arms Sale to Armenia". 9 August 2023.
  112. Dubey, Ajit (24 November 2024). "India starts exporting Pinaka weapon systems to Armenia". ANI. Retrieved 25 November 2024.


External links

Technical:

Defence Research and Development Organisation (DRDO)
Aeronautics
Avionics
Other HAL programmes
Unmanned aerial vehicles
Armaments
Small arms
Artillery, ammunition
Armoured fighting
vehicles
Tanks
Infantry fighting vehicle
Other vehicles
Electronics,
computer science
Electronic warfare
Radars
Search
Fire-control
Airborne
Software
Missile systems
Ballistic missiles
Agni
Prithvi
SRBM
SLBM
Cruise missiles
Anti-ship missiles
Air-to-air missiles
Anti-tank missiles
Surface-to-air
Air-to-surface
Anti-ballistic
Torpedoes
Bombs
Precision guided
General purpose
People
Scientists
Engines
Important programmes
Categories: