Misplaced Pages

Quzhou–Ningde railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Quzhou-Ningde railway) Railway line in China
Quzhou–Ningde railway
Overview
StatusOperational
Termini
Stations13
Service
TypeHeavy rail
History
Opened27 September 2020
Technical
Line length379 km (235 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

The Quzhou–Ningde railway is a single-track electrified railway in China. The combined passenger and freight line is 379 kilometres (235 mi) long and has a design speed of 160 kilometres per hour (99 mph). The journey time is 5 hours and 27 minutes.

History

Initially, the railway was expected to begin construction in 2011 and to have double-track with a line-speed of 200 kilometres per hour (120 mph). Construction on a single-track railway began in 2015. The line began operation on 27 September 2020.

Stations

The line has the following passenger stations:

References

  1. ^ "衢宁铁路9月27日开通运营 浙闽8县市结束不通铁路历史 - 南平新闻 - 东南网". np.fjsen.com. Retrieved 2020-10-01.
  2. "浙江福建明年开建"衢宁铁路"(图)_网易新闻中心". 2014-11-07. Archived from the original on 2014-11-07. Retrieved 2020-10-01.


Stub icon

This People's Republic of China rail-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: