Misplaced Pages

SAFARI-1

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
South African nuclear research reactor
SAFARI-1
Buildings housing the SAFARI-1 reactor
Official nameSouth African Fundamental Atomic Research Installation 1
CountrySouth Africa
LocationPelindaba, North West (South African province)
Coordinates25°48′0″S 27°57′0″E / 25.80000°S 27.95000°E / -25.80000; 27.95000
StatusOperational
Construction began1961
Commission date1965
OperatorNECSA
Power generation
Nameplate capacity20 MW
External links
Websitewww.necsa.co.za
[edit on Wikidata]

SAFARI-1 is a 20 MW light water-cooled, beryllium reflected, pool-type research reactor, initially used for high level nuclear physics research programmes and was commissioned in 1965.

The reactor is owned and operated by South African Nuclear Energy Corporation (NECSA) at their facility in Pelindaba, South Africa.

The reactor is a tank in pool type reactor and is designed to run on enriched uranium. Currently the fuel in use is the remains of the decommissioned South African nuclear weapons.

History

The reactor was built in cooperation with the Atoms for Peace program run by the US Dept Of Energy in the 1950s and '60s.

Planning started in 1960 and construction occurred between 1961 and 1965. In March 1965 the reactor was commissioned and initially operated at 6.75 MW, a limitation imposed by the capacity of the secondary cooling circuit. Output was increased to 20 MW in 1968 after the secondary cooling circuit was upgraded.

Initially the reactor was fueled with High Enriched uranium (HEU) supplied by the United States, but in 1975 exports of HEU from the USA to South Africa was suspended in protest of South Africa's nuclear weapons program and the construction of the Valindaba Y-plant. In order to conserve the available fuel supply, reactor output was reduced to 5 MW and operating hours were dramatically reduced

In 1979 the Valindaba Y-plant started producing 45% HEU and in 1981 the first fuel assemblies from Valindaba were made available to fuel SAFARI-1. Operating hours were increased, but power was kept at 5 MW until 1993 when it was increased to 10 MW and eventually 20 MW due to the commercialisation of NECSA operations.

The reactor was shut down for repairs in 1988 after a water leak was detected in the pool.

In 2005 it was announced that the reactor is to be converted from using High Enriched uranium to Low Enriched uranium as fuel.

Use

One of Safari-1s primary uses is the production of radio isotopes for radiopharmacology use in nuclear medicine, specifically the production of molybdenum-99.

Radio isotopes are distributed through NTP Radioisotopes, a subsidiary company of NECSA

See also

References

  1. "Nuclear research for a sustainable future" (PDF). South African Nuclear Energy Corporation. Archived from the original (PDF) on 19 April 2012. Retrieved 25 November 2012.
  2. "Obama praises SA on nuclear disarmament". defenceWeb. 12 April 2010. Retrieved 25 November 2012.
  3. "SAFARI-1: Conversion to LEU". South African Nuclear Energy Corporation. Archived from the original on 2011-07-24. Retrieved 2008-12-03.
  4. ^ "Minister of Minerals and Energy announces the phasing out of the use of High Enriched Uranium for the Pelindaba Research Reactor Nuclear Fuel". South African Government Information. 2005-07-18. Archived from the original on 2011-06-04. Retrieved 2008-12-03.
  5. ^ Vlok, JWH. "REACTOR OPERATIONS AT SAFARI-1" (PDF). Manager: Reactor Operations SAFARI-1 Research Reactor NECSA. Archived from the original (PDF) on 2011-07-13. Retrieved 2008-12-04.
  6. David Philip, ed. (1998). "Ch. 9. Apartheid's nuclear arsenal: Deviation from development". FROM DEFENCE TO DEVELOPMENT — Redirecting Military Resources in South Africa. CRDI. ISBN 1-55250-151-5. Archived from the original on 2006-12-03. Retrieved 2008-12-03.
  7. ^ Cochran, Thomas B. (1994). "Highly Enriched Uranium Production for South African Nuclear Weapons" (PDF). Science & Global Security. 4 (2). Gordon and Breach Science Publishers B.A.: 161–176. Bibcode:1994S&GS....4..161C. doi:10.1080/08929889408426398. Retrieved 2008-12-04.
  8. "SAFARI-1: Achieving Conversion to LEU — A Local Challenge" (PDF). South African Nuclear Energy Corporation. Retrieved 2008-12-03.
  9. Iturralde, Mario P. (December 1996). "Molybdenum-99 production in South Africa". European Journal of Nuclear Medicine and Molecular Imaging. 23 (12): 1681–1687. doi:10.1007/BF01249633. ISSN 1619-7089. S2CID 28154691.
  10. "South Africa to resume radioisotope production". World Nuclear News. 19 November 2018. Retrieved 20 November 2018.

External links

Nuclear power in South Africa
Current nuclear reactors
Enrichment plants
Waste disposal sites
Operators
Opposition
Categories: