State Highway 224 | ||||
---|---|---|---|---|
Map of Adams County in north central Colorado with SH 224 highlighted in red | ||||
Route information | ||||
Maintained by CDOT | ||||
Length | 3.634 mi (5.848 km) | |||
Major junctions | ||||
West end | US 36 on Sherrelwood–Twin Lakes line | |||
Major intersections |
| |||
East end | US 6 / US 85 in Commerce City | |||
Location | ||||
Country | United States | |||
State | Colorado | |||
Counties | Adams | |||
Highway system | ||||
| ||||
|
State Highway 224 (SH 224) is a 3.634-mile (5.848 km) state highway in Adams County, Colorado, United States, that connects U.S. Route 36 (US 36) on the Sherrelwood–Twin Lakes line with U.S. Route 6/U.S. Route 85 (US 6/US 85) in Commerce City. SH 224 is locally signed as East 70th Avenue and East 74th Avenue.
Route description
SH 224 begins at Broadway's three-ramp interchange with US 36 (Denver–Boulder Turnpike) just west of US 36's interchange with Interstate 25 and I-270 (Dwight D. Eisenhower Highway); there is no ramp from Broadway to eastbound US 36. SH 224 heads south along four-lane undivided Broadway through the unincorporated area of Twin Lakes. At Broadway's intersection with 70th Street, SH 224 turns east onto 70th Avenue; SH 53 begins at the intersection and heads south along Broadway. SH 224 heads east on 70th Avenue as a four-lane divided highway that has a partial interchange with I-25 allowing access to I-25 to and from Denver; the route also intersects a ramp toward Denver for the I-25 express lanes.
SH 224 continues into unincorporated Welby and curves northeast parallel to Clear Creek, reduces to two lanes, and passes under I-270 with no access. The route briefly expands to a four-lane divided highway around its intersection with York Street, where the route continues as 74th Avenue and veers away from Clear Creek. East of its bridge across the South Platte River north of its confluence with Clear Creek, SH 224 expands to a four-lane divided highway and crosses over the Regional Transportation District (RTD) N line rail line within its partial interchange with I-76, which allows access to I-76 to and from Denver. The highway enters the city of Commerce City and intersects Colorado Boulevard, which leads to the N Line's Commerce City/72nd station, on its way to its eastern terminus at US 6 and US 85 (Vasquez Boulevard).
Major intersections
This section is missing mileposts for junctions. Please help by adding them. |
The entire route is in Adams County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Sherrelwood–Twin Lakes line | 0.000 | 0.000 | Broadway north | Continuation north from western terminus | |
US 36 west (Denver-Boulder Turnpike) – Broomfield, Boulder | Western terminus; US 36 westbound on and off ramp and eastbound off ramp only; The interchange is also the western end of I-270 | ||||
Twin Lakes | 0.268 | 0.431 | SH 53 south (Broadway) – North Washington, I-25/US 87 | Northern end of SH 53 | |
I-25 south / US 87 south (North Valley Highway) – Denver | I-25 exit 216B, southbound onramp | ||||
Welby | I-25 south | Southbound HOV only | |||
I-25 south / US 87 south (North Valley Highway) | I-25 exit 216B, northbound off ramp | ||||
Bridge over the South Platte River | |||||
2.750 | 4.426 | I-76 west – I-270/US 36, I-25/US 36, I-70 | Westbound on and eastbound off only; I-76 exit 8 | ||
Commerce City | 3.634 | 5.848 | US 6 north / US 85 north (CanAm Highway/Vasquez Boulevard) – Derby, I-76, Henderson, Brighton US 6 south / US 85 south (CanAm Highway/Vasquez Boulevard) – Denver | Eastern terminus T intersection | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
See also
References
- "Segment list for SH 224". Retrieved 2011-01-22.
- ^ "CO-224" (Map). Google Maps. Retrieved 2023-02-17.
External links
KML file (edit • help) Template:Attached KML/Colorado State Highway 224KML is from WikidataMedia related to Colorado State Highway 224 at Wikimedia Commons
This Colorado road-related article is a stub. You can help Misplaced Pages by expanding it. |