Misplaced Pages

Spokane, Portland and Seattle class A1

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from SP&S Class A1)
SP&S class A-1
Type and origin
Power typeSteam
BuilderManchester Locomotive Works
Build dateJuly 1907
Specifications
Configuration:
 • Whyte0-6-0
Gauge4 ft 8+1⁄2 in (1,435 mm)
Driver dia.51 in (1.30 m)
Loco weight150,000 lbs (68 metric tonnes)
Fuel typeOil
Boiler pressure180 lbf/in² (1,723 kPa)
Cylinders2
Cylinder size20x26 inches
Performance figures
Tractive effort31,200 lbf
Career
OperatorsSpokane, Portland and Seattle Railway
ClassA-1
LocaleUnited States
Retired1946 - 1952

The SP&S Class A-1 steam locomotives were a group of 5 identical locomotives. They were used in the rail yards at Portland, Oregon, and Vancouver, Washington, from 1907 to 1952. They were replaced with diesel-electric switch locomotives.

Background

In 1907, the new SP&S needed equipment for regular operations. Company officials wanted 25 freight locomotives and two switch locomotives to start with. The president of the Great Northern Railway advised SP&S officials that his railroad could contribute excess engines. Because of this, only five switch locomotives were purchased for use in the terminal yards in Portland and Vancouver.

Construction history

All five locomotives in Class A-1 were built by the Manchester plant of American Locomotive Company. Because of the availability of spare parts from the Northern Pacific Railway in Portland, OR, and Pasco and Vancouver, WA, these locomotives were identical to Northern Pacific class L-9 switch locomotives.

Operational history

All five locomotives were delivered to the SP&S in February 1908. They were initially used in work service completing the North Bank line from Portland to Spokane. Upon completion of the main line, these locomotives were transferred to the terminals for switching service. In late 1942 and early 1943 all 5 locomotives were assigned to the Portland Terminal yards as switch locomotives. In 1946 locomotive number 2 was sold to the City of Prineville Railway. With the arrival of SW9 switch engines 43-45 in 1951, the remaining A-1 class steamers were retired in 1952.

Numbering

These locomotives were numbered 1 to 5

Disposition

Locomotive number 1 was scrapped April 25, 1952. Locomotive number 2 was sold to the City of Prineville Railway and renumbered as their number 7 on July 31, 1946. Locomotive number 3 was scrapped January 24, 1952. Locomotive number 4 was scrapped April 25, 1951. Locomotive number 5 was scrapped January 24, 1952.

References

  1. ^ Gartner 1990, p. 206.
  2. ^ Gartner 1990, p. 14.
  3. Wood & Wood 1974, p. 151.
  4. ^ Gartner 1990, p. 16.
  5. The Northwest's own Railway. Vol. numbers 3 and 4. The Spokane Portland and Seattle Railway Historical Society. 1998. p. 9. {{cite book}}: |volume= has extra text (help)
  6. Gartner 1990, p. 70.
  • Gartner, John T (1990). North Bank Road, The Spokane Portland and Seattle Railway. WSU Press.
  • Wood, Charles R; Wood, Dorothy (1974). Spokane Portland and Seattle Railway. Superior Publishing Co. p. 151.
Spokane, Portland and Seattle Railway Locomotives
Steam Locomotives
0-6-0:
4-4-0:
4-6-0:
2-6-0:
2-8-0:
2-6-2:
2-8-2:
4-4-2:
4-6-2:
4-8-4:
4-6-6-4:
Diesel Locomotives
Alco:
EMD:
Baldwin:
Categories: