Misplaced Pages

Sendai Subway Namboku Line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro line in Sendai, Japan
Sendai Subway Namboku Line
Overview
StatusIn operation
Owner Sendai City Transportation Bureau
LocaleSendai, Miyagi
Termini
Stations17
Service
TypeRapid transit
Rolling stock1000 series
Technical
Line length14.8 km (9.2 mi)
Number of tracks2
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC from overhead catenary
Operating speed75 km/h (45 mph)
Namboku Line
Legend
km
N01 0.0 Izumi-Chūō
Nanakita River
N02 1.2 Yaotome
Mamizawa Bridge
N03 2.5 Kuromatsu
N04 3.3 Asahigaoka
N05 4.3 Dainohara
Umeda River
Senzan Line
N06 5.4 Kita-Sendai
N07 6.6 Kita-Yobanchō
N08 7.3 Kōtōdai-Kōen
N09 7.9 Hirose-dōri
Tōhoku Main Line
& Senzan Line
Tōhoku Shinkansen
Senseki Line
Aoba-dōri/Sendai
N10 8.5 Sendai Tōzai Line
N11 9.4 Itsutsubashi
N12 10.0 Atagobashi
N13 10.9 Kawaramachi
Hirose River
N14 11.7 Nagamachi-Itchōme
N15 12.4 Nagamachi
Tōhoku Main Line, Joban
Line & Sendai Airport Line
Tōhoku Shinkansen
N16 13.3 Nagamachi-Minami
N17 14.8 Tomizawa
Zaru River
Tomizawa Depot
km
Sendai Subway JR East lines

The Sendai Subway Namboku Line (仙台市地下鉄南北線, Sendai shi chikatetsu nanbokusen) is a rapid transit line of Sendai Subway in Sendai, Japan. It connects Izumi-Chūō Station in Izumi-ku, Sendai, with Tomizawa Station in Taihaku-ku, Sendai. The line is 14.8 km (9.2 mi) long and has 17 stations. Like many mainline trains and metros in Japan, it uses the 1067 mm track gauge and runs on 1,500 V overhead line. The name "Namboku" means south–north, which is the general direction that the track runs.

The Namboku Line was the world's first public railway to use fuzzy logic to control its speed. This system (developed by Hitachi) accounts for the relative smoothness of the starts and stops when compared to other trains, and is 10% more energy efficient than human-controlled acceleration.

Stations

All stations are in Sendai.

No. Station Japanese Distance (km) from Transfers Location
previous
station
Tomizawa
N17 Tomizawa 富沢 - 0.0 Taihaku-ku
N16 Nagamachi-Minami 長町南 1.5 1.5
N15 Nagamachi 長町 0.9 2.4
N14 Nagamachi-Itchōme 長町一丁目 0.7 3.1
N13 Kawaramachi 河原町 0.8 3.9 Wakabayashi-ku
N12 Atagobashi 愛宕橋 0.9 4.8
N11 Itsutsubashi 五橋 0.6 5.4 Aoba-ku
N10 Sendai 仙台 0.9 6.3
N09 Hirose-dōri 広瀬通 0.6 6.9
N08 Kōtōdai-Kōen 勾当台公園 0.6 7.5
N07 Kita-Yobanchō 北四番丁 0.7 8.2
N06 Kita-Sendai 北仙台 1.2 9.4 ■ Senzan Line
N05 Dainohara 台原 1.1 10.5
N04 Asahigaoka 旭ヶ丘 1.0 11.5
N03 Kuromatsu 黒松 0.8 12.3 Izumi-ku
N02 Yaotome 八乙女 1.3 13.6
N01 Izumi-Chūō 泉中央 1.2 14.8

History

An entrance leading down to Dainohara Station
Tracks between Yaotome and Izumi-Chūō stations
  • 1981 – Construction started
  • July 15, 1987 – Line opened from Yaotome to Tomizawa.
  • July 15, 1992 – Line extended from Yaotome to Izumi-Chūō.
  • March 11, 2011 – Damaged in the 2011 Tōhoku earthquake and tsunami and subsequently shut down for repairs.
  • April 29, 2011 – Line reopens after repair works were finished.
  • 20 February 2024 – Newly delivered 3000 series begins testing.
  • 25 October 2024 - 3000 series begins operations.

Rolling stock

See also

References

  1. Andrew Pollack (April 2, 1989). "Fuzzy Computer Theory: How to Mimic the Mind?". The New York Times. Retrieved 2007-10-31.
  2. Philip Elmer-DeWitt (September 25, 1989). "Time For Some Fuzzy Thinking". Time. Archived from the original on October 22, 2010. Retrieved 2007-10-31.
  3. Kyodo News, "Sendai subway to fully resume operation April 29, earlier than planned", 6 April 2011.
  4. "仙台市交3000系,日中の試運転を開始". Japan Railfan Magazine Online (in Japanese). 21 February 2024. Retrieved 21 February 2024.
  5. "仙台市地下鉄南北線で新型車両「3000系」運行開始 2030年度まで順次切り替え". 仙台経済新聞. Retrieved 2024-10-24.

External links

Map all coordinates using OpenStreetMap

Download coordinates as:

Transit in Sendai
Shinkansen
JR East
Sendai Subway
Other railways
Terminals
Miscellaneous
Categories: