Misplaced Pages

Shen'ao line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Railway branch line of the Taiwan Railways Administration
This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.
Find sources: "Shen'ao line" – news · newspapers · books · scholar · JSTOR (January 2016)
Shen'ao Line
Overview
Native name深澳線
OwnerTaiwan Railways Administration
Termini
Stations3
Service
Operator(s)Taiwan Railways Administration
Technical
Line length4.6 km (2.9 mi)
Number of tracks1

The Shen'ao line (Chinese: 深澳線; pinyin: Shēn'ào Xiàn; Pe̍h-ōe-jī: Chhim-ò Soàⁿ) is a 4.6 km long, single-track railway branch line of the Taiwan Railways Administration. It runs through Ruifang in New Taipei and Zhongzheng in Keelung.

History

The railroad was originally built on 25 August 1967. The line was initially built to transport coal but later added a passenger service, though passenger service was suspended 1989. It then opened again in 2016, but the extending line from Badouzi Station (Chinese: 八斗子) onwards was disused.

Services

All trains have through service to the Yilan line.

Stations

Name Chinese Hokkien Hakka Transfers and Notes Location
Ruifang 瑞芳 Sūi-hong Lui-fông Taiwan Railway Yilan line Ruifang New Taipei
Haikeguan 海科館 Hái-kho-koán Hói-khô-kón The northernmost operational railway station in Taiwan Zhongzheng Keelung
Badouzi 八斗子 Pat-táu-chí Pat-teú-chṳ́

References

  1. Taiwan Railways Administration
  2. ^ "Scenic Badouzih Station opens after 27-year break". Taipei Times. December 31, 2016. Archived from the original on December 31, 2016. Badouzih Station (八斗子), on the border between New Taipei City and Keelung, known for its views of the coastline and mountain ranges on the Taiwan Railways Administration's (TRA) Shenao Branch Line (深澳), on Wednesday resumed services after a 27-year hiatus The line was built to transport coal and later added passenger services. It stopped transporting passengers in 1989, but briefly resumed passenger services in January 2014.
Taiwan Railway lines
Main lines
Branch lines
Others
Defunct
Planned & U/C
Abandoned/Unbuilt


Stub icon

This Taiwanese rail-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: