This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Sim Gideon Power Plant" – news · newspapers · books · scholar · JSTOR (December 2023) (Learn how and when to remove this message) |
Sim Gideon Power Plant | |
---|---|
Country | United States |
Location | Bastrop County, Texas, near Bastrop, Texas |
Coordinates | 30°08′44″N 97°16′13″W / 30.14556°N 97.27028°W / 30.14556; -97.27028 |
Status | Operational |
Commission date | Unit 1: 1965 Unit 2: 1968 Unit 3: 1971 |
Owner | Lower Colorado River Authority |
Thermal power station | |
Primary fuel | Natural gas |
Cooling source | Lake Bastrop |
Power generation | |
Nameplate capacity | 620 MW |
[edit on Wikidata] |
The Sim Gideon Power Plant is a 639 megawatt (MW), natural gas fired power plant located near Bastrop, Texas in Bastrop County, Texas. It is owned and operated by the Lower Colorado River Authority. The Sim Gideon Power Plant consists of three generating units that operate via simple cycle combustion turbine utilizing natural gas. The plant, along with Lost Pines Power Project 1, is part of the Lost Pines Power Park.
Three generating units compose the Sim Gideon Power Plant:
- Unit 1, completed in 1965, with a generating capacity of 140 MW
- Unit 2, completed in 1968, with a generating capacity of 140 MW
- Unit 3, completed in 1971, with a generating capacity of 340 MW
Cooling water is provided by Lake Bastrop, a 900-acre (360 ha) freshwater reservoir, and four wells that produce groundwater from the Simsboro Aquifer.
See also
References
- kgi-admin (2022-01-05). "Power plant profile: Sim Gideon Power Plant, US". Power Technology. Retrieved 2023-12-11.
External links
This article about a United States power station is a stub. You can help Misplaced Pages by expanding it. |