Misplaced Pages

Simplon Railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Simplon railway line) Railway connecting Switzerland and Italy
Simplon Railway
1928 poster, showing the line passing the Chateau du Chillon
Overview
Native nameSimplonstrecke or Simplonlinie
Termini
Technical
Line length232.5 km (144.5 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed160 km/h (99 mph) (Passenger trains)

140 km/h (87 mph) (Freight trains)

200 km/h (120 mph) (Planned for 2030)
Route map

Legend
km elev
SNCF from Dijon
Mont d’Or Tunnel
France
Switzerland
46.3 Vallorbe
SNCF
SBB
806.9 m
to Pontarlier,
SBB
SNCF
national and
property border
Le Day Viaduct (152 m)
43.2 Le Day 787.2 m
SBB to Le Pont
41.2 Les Grands-Bois
Nanchau Tunnel (132 m)
Combes Tunnel (100 m)
35.8 Bretonnières 673.3 m
33.7 Croy-Romainmôtier 641.8 m
27.6 Arnex 552.4 m
Moulin-Bornu Tunnel (72 m)
La Sarraz Tunnel (148 m)
22.8 La Sarraz 484.9 m
19.3 Daillens
SBB from Yverdon-les-Bains and Olten
19.1 Daillens 445.1 m
Daillens-Poste parcel distribution centre
MBC funicular from Cossonay
14.5 Cossonay-Penthalaz 428.0 m
11.0 Vufflens-la-Ville 406.8 m
9.9 siding
9.4 Vufflens-la-Ville 399.6 m
6.9
14.9
Bussigny 407.0 m
13.8 Lausanne marshalling yard north 400.0 m
Poimbœuf bridge (63 / 70 m)
Poudrière III bridge (213 m)
13.2 Les Lécheires 398.8 m
12.9
7.7
Lausanne marshalling yard D 397.0 m
SBB from Geneva
8.03
8.15
Denges
chainage correction: -0.01
to/from Lausanne marshalling yard
Larges-Pièces bridge (106 m)
6.1 Archy 404.4 m
TL from Lausanne-Flon
4.51 Renens VD   415.9 m
3.76
3.79
Renens VD-Est bifurcation   416.3 m
Galicien bridge (147 m)
2.35 Prilly-Malley since 2011 430.4 m
1.52
-0.05
Lausanne-Sébeillon freight yard 449.8 m
Olivier Français Tunnel (3796 m)
TL Lausanne Metro
3.97 Lausanne-Tridel waste incinerator 594.5 m
1.13 Lausanne junction   442.2 m
0.00
0.00
Lausanne 447.1 m
TL to Ouchy and TL: Lausanne-Flon
SBB to Palézieux and Bern
2.51 Pully 424.8 m
Paudèze bridge (162 m)
Paudex Tunnel (72 m)
5.05 Lutry 402.1 m
Tour-de-Bertholod Tunnel (126 m)
6.68 Villette VD 387.4 m
8.52 Cully 391.7 m
9.98 Epesses 383.1 m
13.55 Rivaz 377.0 m
14.55 St-Saphorin 376.9 m
chainage correction +0.02
SBB from Puidoux-Chexbres
La Veveyse
MVR from Blonay and Les Pléiades
MVR funicular from Mont Pèlerin
VMCV: Vevey funicular
18.40 Vevey 386.1 m
19.90 La Tour-de-Peilz   390.4 m
21.53 Burier   395.9 m
Crêtes Tunnel (302 m)
CCB from Blonay
23.10 Clarens   399.6 m
CCB: Clarens Lac
24.54 Montreux   395.4 m
MVR to Rochers de Naye
MOB line to Zweisimmen
TP: Trait–Planches
level junction with VMCV
MVR funicular to Glion
26.02 Territet   386.2 m
TMF to Mont Fleuri (funicular)
27.09 Veytaux-Chillon 379.8 m
VMCV
29.34 Villeneuve VD 374.8 m
33.84 Roche VD 379.6 m
37.71 Yvorne 395.0 m
TPC to Leysin-Grand-Hôtel
39.31 Aigle 403.9 m
TPC to Les Diablerets
43.60 St-Triphon former station 390.7 m
TPC to Champery
TPC from Col de Bretaye
47.56 Bex 411.0 m
49.42 Massongex bridge (87 m) over Rhone
VD
VS
SBB from Saint-Gingolph
50.07 Les Paluds 408.0 m
St-Maurice Tunnel (490 m)
51.56 St-Maurice 421.5 m
57.86 Evionnaz 449.0 m
61.51 Vernayaz 452.2 m
TMR from Le Châtelard
66.50 Martigny   467.0 m
TrMB to Martigny–Bourg
TMR to Orsières and Le Châble
70.86 Charrat-Fully 460.5 m
75.27 Saxon 465.2 m
79.57 Riddes 470.6 m
Rhône Riddes (66 m)
Zavannens Tunnel (276 m)
82.12 Chamoson-St-Pierre-de-Clages 488.2 m
85.31 Ardon 487.9 m
88.07 Châteauneuf-Conthey 488.7 m
92.43 Sion 490.6 m
98.15 St-Léonard 504.9 m
101.56 Granges-Lens former station 507.9 m
SMC to Montana-Crans (funicular)
108.13 Sierre/Siders
Gobet Tunnel (251 m)
chainage correction -0.04
Raspille Tunnel (80 m)
112.25 Salgesch 575.9 m
Salgesch–Leuk new line since 2004
Varonne Tunnel (137 / 2816 m)
Dala bridge (79 m)
Leuk Tunnel (125 / 1388 m)
Rhône bridge (180 m)
LLB to Leukerbad
117.58 Leuk 623.3 m
chainage correction -0.04
122.11 Turtmann 624.2 m
chainage correction -0.01
125.87 Gampel-Steg 631.9 m
130.09 Raron 638.8 m
BLS (Lötschberg Base Tunnel) from Spiez
130.09 St. German 646.5 m
chainage correction -0.01
Vispa bridge (45 / 45 / 45 m)
MGB from Zermatt
136.66 Visp   646.5 m
141.1 Gamsen SBB   660.9 m
BLS (Lötschberg railway line) from Spiez
MGB until 2007 via Naters
145.55 Brig car loading 677.7 m
MGB to Andermatt
147.15 Brig Tunnel 682.4 m
Simplon Tunnel (19'823 / 19'803 m)
156.24
Switzerland
Italy
156.34 Tunnel station   700.2 m
156.77 high point 701.9 m
Iselle Tunnel (169 m)
167.22
19.06
Iselle di Trasquera car loading 629.5 m
SBB
RFI
property boundary
Trasquera Tunnel (1792 m)
Varzo spiral tunnel
12.55 Varzo   529.0 m
Varzo Tunnel (81 m)
Mognatta Tunnel (422 m)
Gabbio Mollo Tunnel (568 m)
S. Giovanni Tunnel (425 m)
Diveria bridge (40 m)
Rio Confinale Tunnel (51 m)
Preglia/Rio Rido Tunnel (2327 m)
Preglia bridge (82 m)
3.83 Preglia   331.0 m
Bogna bridge (96 m)
0.00
5.06
Domodossola I   270.1 m
SSIF [de] / FART line to Locarno
Via Torino bridge (335 m)
RFI to Novara
Toce bridge (298 m)
0.00 Domodossola II marshalling yard 239.0 m
RFI to Milan
Source: Swiss railway atlas
This diagram:

The Simplon Railway is a line that links Lausanne in Switzerland and Domodossola in Italy, via Brig. The 20 km (12 mi)-long Simplon Tunnel (opened in 1906) is a major part of it. The line between Lausanne and Vallorbe is sometimes considered to form part of the line, making it 233 km (145 mi) long.

Together with the Lötschberg Railway to its north, it forms the second most important trans-Alpine railway line in Switzerland after the Gotthard Railway, which lies to its east and is about 240 km (150 mi) long.

ETCS level 2 is expected to be installed on the line between Lausanne and Brig before 2022.

History

Vallorbe–Lausanne

The CossonayBussigny-près-Lausanne section was opened in 1855 by the Compagnie de l'Ouest-Suisse (West Switzerland Company, OS) as part of the construction of the Jura Foot Railway. The Bussigny–Lausanne connecting curve was opened in 1856. The Jougne-Eclépens Railway started work on the Cossonay–Vallorbe section in 1870. A cross-border connection to the French rail network was opened in 1875 with the completion of the tunnel under the Col de Jougne. However, the trains from France to Switzerland had to make a zig zag turn until 1915, when the opening of the Mont d’Or Tunnel and the new line to Frasne created a direct route. The SNCF initially maintained the line to Pontarlier via the Tunnel de Jougne, but this suffered significant damage in the Second World War, including the blowing up of the Tunnel de Jougne by the French army, and it was not rebuilt.

Lausanne–Brig

The first section of the line went in operation on 10 June 1857 when the Compagnie de l'Ouest Suisse opened the VilleneuveBex section. The line was completed by the OS, the Compagnie de la Ligne d'Italie ("Company of the Italian line") and the Compagnie du chemin de fer du Simplon ("Simplon Railway Company") in subsequent stages, ending with the closing of the LeukBrig gap in 1878. The upgrade to two continuous tracks between Lausanne and Brig was completed in 2004.

The construction of the Lötschberg Railway was completed in 1913 and, in preparation, Brig was upgraded to be a junction station. After 1919, the Sion–Brig section was electrified at 3000 Volt 16 Hertz three phase, but between 1923 and 1927 the line was electrified throughout at the modern SBB standard single-phase 15 kV 16.7 Hz AC system.

With the opening of the Lötschberg Base Tunnel in 2007, Visp station became an interchange station between services from the Bern region to Zermatt and services towards Sion. Since then all trains to and from the Base Tunnel have run over the Simplon line between Visp and Domodossola.

Brig–Domodossola

Construction of the Simplon tunnel

The first tube of the Simplon Tunnel was completed after eight years of construction and, along with the continuation of the line to Domodossola, it was opened in 1906. The connection to Domodossola included the Varzo elicoidale, which was probably the longest spiral tunnel in the world. The Simplon tunnel was electrified with 3000 Volt 16 Hertz three-phase AC power from the beginning of operations until 1930.

The second tube of the Simplon tunnel was built between 1912 and 1921 and opened to traffic in 1922.

In 1930, the route from Brig to Domodossola was electrified throughout with the standard Swiss system of 15 kV/162⁄3 Hz AC, which with its high voltage better suited the steep south ramp than the Italian 3,000 Volt DC system. The dispatcher at the nearby Italian south ramp (Iselle–Domodossola) has worked under Swiss regulations since the establishment of the SBB. Until the electrification in 1930, the 2.5 percent grade on the section was worked by steam, using a large number of C 5/6 locomotives that had been reallocated to the Brig depot after the electrification of the Gotthard Railway. The section, which is equipped with the Swiss train protection system belongs to Ferrovie dello Stato (FS), which also provides the ground personnel. Even in the 21st century, with open access, the majority of traffic on the Italian section is hauled by Swiss locomotives.

Since 1992, there has been a single-track link, electrified on the Swiss system, from Domodossola I station to the Domodossola II marshalling yard to provide access for Swiss locomotives. The marshalling yard mainly provides changes of traction for through freight trains.

Operations

Since the closure of the Trans Europ Express service from Paris to Milan, only nightly passenger trains have run the full distance. These trains are operated by Trenitalia under the name of Thello and run on the Paris–Dijon–Milan–Venice route, which was also used by the former Venice-Simplon Orient Express. These services are operated with ETR 610 stock.

Long-distance services

Between Vallorbe and Lausanne long-distance TGV services run to/from Paris, which are extended in the winter season to Brig. Between Cossonay and Bussigny or Lausanne the route is still operated by ICN trains, which run over the Jura Foot Railway. Between Lausanne and Brig, InterRegio services run to and from Geneva Airport. Between Lausanne and Domodossola, EuroCity services run from Geneva to Milan or Venice. With the opening of the Lötschberg Base Tunnel in 2007, InterCity services running on the Romanshorn–Brig route and EuroCity services running on the Basel–Milan route use the section between the south portal in Visp and the north portal of the Simplon Tunnel in Brig.

Regional services

In the Rhone Valley Regional services run from Brig to Sion or Saint-Gingolph. In addition, five of the seven lines of the RéseauExpressVaudois run on sections of the Simplon railway between Lausanne and Renens. The S2 runs between Vallorbe and Lausanne, the S1 between Cossonay and Villeneuve, the S3 between Renens and Villeneuve, the S4 between Renens and Lausanne and the S11 between Cossonay and Lausanne.

Freight

Freight trains run on the line.

List of Inter-City/Inter-Regional services

Station French German Italian Distance (km) Lyria IR90 EuroCity IR (Lötschberger)
Vallorbe Vallorbe Vallorbe Vallorbe 46.30
Lausanne CFF Lausanne Lausanne Losanna 0.00
Vevey Vevey Vivis Vevey 18.40
Montreux Montreux Montreux Montreux 24.54
Aigle Aigle Älen Aigle 39.31
Saint-Maurice Saint-Maurice Sankt-Moritz Saint-Maurice 51.56
Martigny Martigny Martinach Martigny 66.50
Sion Sion Sitten Seduno 92.43
Sierre/Siders Sierre Siders Sierre 108.13
Leuk Loèche Leuk Leuk 117.58
Visp Viège Visp Visp(a) 136.66
Brig Brigue Brig Brig(a) 145.55
Domodossola Domodossola Domodossola Domodossola 0.00

Route

Vallorbe–Lausanne

Le Day Viaduct

The line includes the section from the border station of Vallorbe to its northern connection to the RFF line from Dijon. After crossing the Le Day Viaduct, the line reaches the station of the village of Le Day. Immediately afterwards is the junction to the Vallorbe–Le Brassus railway line to Le Brassus. Between the stations of La Sarraz and Cossonay, the Jura Foot Railway from Olten connects with the line. The two routes run together to Bussigny, where there is connection to the line to Geneva at a wye junction. This allows trains running between the Jura Foot Railway and Geneva to avoid reversing at Lausanne. The line reaches Lausanne via Renens.

Lausanne–Brig

At St. Saphorin on Lake Geneva

After Lausanne station, the line to Fribourg and Bern branches off to the left in the middle of the SBB rolling stock depot, while the Simplon line remains on the shore of Lake Geneva. Some Lavaux communities have stations on both lines, such as Pully (Pully and Pully Nord) or Lutry (Lutry and La Conversion).

Vevey is reached via Pully, Lutry and Cully. The Vevey–Chexbres railway line, which ends here, is a one-track connection to the line to Bern and can also function as a bypass of Lausanne for the Simplon Railway, but it is rarely used as such. In addition, the narrow-gauge Vevey–Les Pléiades railway line runs from here to Les Pléiades.

The line reaches Montreux via La Tour-de-Peilz, Burier, and Clarens (which is within the Montreux municipal boundary); it is the only Swiss station with three different gauges. Here, the Montreux–Glion–Rochers-de-Naye railway line branches off to Rochers de Naye and the Montreux–Lenk im Simmental line to Lenk.

After Montreux, the line runs past Chillon Castle and the former Hôtel Byron to Villeneuve. Three narrow gauge lines branch off in Aigle to Leysin, Les Diablerets and Champéry. In Bex, the narrow-gauge Bex–Villars–Bretaye Railway runs to the Col-de-Bretaye. The line from Saint-Gingolph connects with the Simplon line in Saint-Maurice. The line then reaches Martigny, where two lines branch off. Both are operated by the TMR, the narrow gauge Martigny–Châtelard Railway towards Chamonix and a standard gauge line to Orsières with a branch to Le Châble. A few kilometres later, the line reaches Sion and shortly later Sierre, before reaching the language border between French and German. The first stop in the Upper Valais is Leuk. In Visp station there is a connection to the Matterhorn-Gotthard-Bahn (MGB) from Zermatt and the Lötschberg Base Tunnel connects with the line. The MGB runs from Brig, where the Lötschberg Mountain Railway connects with the Simplon line towards the Upper Valais.

Brig–Domodossola

Although the line crosses from the property of the SBB to that of the Ferrovie dello Stato in Iselle, Domodossola is electrified with the Swiss electrical system and uses Swiss operating rules. The ground staff, however, are provided by FS. BLS class Re 485 locomotive passing through Iselle.

After Brig, the line runs into the Simplon Tunnel, in the middle of which is the national border between Switzerland and Italy. The tunnel ends at Iselle di Trasquera where, as in Brig, there is a terminal for the carriage of cars through the tunnel. This is followed by the 1.7 km-long Trasquera Tunnel and the 3.0 km-long Varzo Spiral Tunnel. The line reaches Domodossola via the halts of Varzo and Preglia. The catenary of the section on Italian territory is built to the Italian overhead line standards—but it is charged at 15 kV / 16.7 Hz AC. The signals comply with SBB standards. The trains continue from Domodossola over the Domodossola–Milan railway, which is owned by the Italian infrastructure company RFI.

References

Footnotes

  1. via Lausanne marshalling yard D
  2. from Lausanne–Archy
  3. via Prilly-Malley
  4. via Lausanne-Sébeillon
  5. "Territet–Mont Fleuri funicular" (in German). www.bahndaten.ch. Retrieved 12 August 2018.
  6. Eisenbahnatlas Schweiz [Swiss railway atlas]. Schweers + Wall. 2012. pp. 28–9, 41–3, 44–6, 54–5, 70–1. ISBN 978-3-89494-130-7.
  7. "SBB steps up ETCS rollout". Railway Gazette.com. 16 Mar 2012. Retrieved 4 August 2013.
  8. Tanner, Olivier. "Bahnstrecke Biel/Bienne – Lausanne" (in German). Retrieved 13 August 2018.
  9. Tanner, Olivier. "Bahnstrecke Lausanne – Vallorbe" (in German). Retrieved 13 August 2018.
  10. ^ Tanner, Olivier. "Bahnstrecke Lausanne – Brig" (in German). Retrieved 13 August 2018.
  11. Lämmli, Bruno (2017). "SBB CFF FFS C 5/6 Nr. 2951–2978". Betriebseinsatz 1921 - 1932 (in German). Lokifahrer.ch. Retrieved 14 August 2018.
  12. "Timetable Paris–Venice". Thello. Retrieved 14 August 2018.
  13. "Rail line to Italy reopens after derailment". worldradio.ch. 23 December 2011. Retrieved 2 July 2013.

Sources

  • Wägli, Hans G. (2010). Schienennetz Schweiz und Bahnprofil Schweiz CH+ (in German). Zürich: AS Verlag. ISBN 978-3-909111-74-9.
Categories: