Misplaced Pages

Soyuz TM-2

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
1987 Soviet crewed spaceflight to Mir This article is about the spacecraft. For the expedition which it launched, see Mir EO-2. Not to be confused with Soyuz 2, Soyuz T-2, Soyuz TMA-2, Soyuz TMA-02M, or Soyuz MS-02.
Soyuz TM-2
COSPAR ID1987-013A Edit this at Wikidata
SATCAT no.17482
Mission duration174 days, 3 hours, 25 minutes, 56 seconds
Orbits completed~2,810
Spacecraft properties
SpacecraftSoyuz 7K-STM No. 52
Spacecraft typeSoyuz-TM
ManufacturerNPO Energia
Launch mass7,100 kilograms (15,700 lb)
Crew
Crew size2 up
3 down
MembersAleksandr Laveykin
LaunchingYuri Romanenko
LandingAleksandr Viktorenko
Muhammed Faris
CallsignTaimyr
Start of mission
Launch date5 February 1987, 21:38:16 (1987-02-05UTC21:38:16Z) UTC
RocketSoyuz-U2
Launch siteBaikonur 1/5
End of mission
Landing date30 July 1987, 01:04:12 (1987-07-30UTC01:04:13Z) UTC
Landing site80 kilometres (50 mi) from Arkalyk
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude341 kilometres (212 mi)
Apogee altitude365 kilometres (227 mi)
Inclination51.6 degrees
Period91.6 minutes
Docking with Mir
Docking date7 February 1987, 23:27:40 UTC
Undocking date29 July 1987, 20:44:00 UTC
Soyuz programme
(Crewed missions)← Soyuz T-15Soyuz TM-3 →

Soyuz TM-2 was a crewed spaceflight to the Soviet space station Mir, which was uncrewed at the time. TM-2 was launched on February 5, 1987, and it was first crewed spaceflight of the Soyuz-TM spacecraft, and the second crewed spaceflight to Mir (the first being Soyuz T-15). The crew of the long duration expedition, Mir EO-2, who were launched by TM-2 consisted of Soviet cosmonauts Yuri Romanenko and Aleksandr Laveykin.

The spacecraft remained docked to Mir, functioning as a lifeboat for the EO-2 crew, until July 1987 when it returned to Earth carrying Laveykin and the two man crew of Mir EP-1. Romanenko later returned to Earth in Soyuz TM-3 at the end of EO-2.

Crew

Position Launching crew Landing crew
Commander Soviet Union Yuri Romanenko
Mir EO-2
Third and last spaceflight
Soviet Union Aleksandr Viktorenko
Mir EP-1
First spaceflight
Flight Engineer Soviet Union Aleksandr Laveykin
Mir EO-2
Only spaceflight
Research Cosmonaut None Syria Muhammed Faris
Mir EP-1
Only spaceflight

Mission parameters

  • Mass: 7100 kg
  • Perigee: 341 km
  • Apogee: 365 km
  • Inclination: 51.6°
  • Period: 91.6 minutes

Mission highlights

Main article: Mir EO-2

Early in the expedition EO-2, the module Kvant-1 was launched to automatically dock with Mir. The docking system, known as the "Igla system", was not behaving as expected. On April 5 the EO-2 crew retreated to the Soyuz TM-2 spacecraft so that they could escape in the event the module got out of control. About 200 m out, the docking system lost its lock on Mir's aft port antenna. The cosmonauts watched from within Soyuz TM-2 as the Kvant/ FSM combination passed within 10 m of the station. Following an emergency spacewalk, Kvant fully docked to the station on April 11.

References

  1. ^ "Mir EO-2". Encyclopedia Astronautica. Archived from the original on 9 April 2007. Retrieved 11 November 2010.
  2. "Mir EP-1". Encyclopedia Astronautica. Archived from the original on 29 November 2010. Retrieved 11 November 2010.
  3. "Soyuz TM-2". Spacefacts.de. Retrieved 21 March 2021.
  4. "Soyuz TM". Encyclopedia Astronautica. Archived from the original on June 24, 2002. Retrieved 11 November 2010.
Soyuz programme
Main topics
Past missions
(by spacecraft type)
Soyuz 7K-OK (1966–1970)
Soyuz 7K-L1 (1967–1970)
(Zond lunar programme)
Soyuz 7K-L1E (1969–1970)
Soyuz 7K-LOK (1971–1972)
Soyuz 7K-OKS (1971)
Soyuz 7K-T (1972–1981)
Soyuz 7K-TM (1974–1976)
Soyuz 7K-S (1974–1976)
Soyuz-T (1978–1986)
Soyuz-TM (1986–2002)
Soyuz-TMA (2002–2012)
Soyuz-TMA-M (2010–2016)
Soyuz MS (2016–present)
Current missions
Future missions
Uncrewed missions are designated as Kosmos instead of Soyuz; exceptions are noted "(uncrewed)".
The † sign designates failed missions. Italics designates cancelled missions.
Human spaceflights to Mir
1986–1990
1991–1995
1996–2000
← 1986Orbital launches in 19871988 →
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).
Categories: