Misplaced Pages

St. Lucie Canal

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from St. Lucie Canal (C-44)) Canal in Martin County, Florida
This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.
Find sources: "St. Lucie Canal" – news · newspapers · books · scholar · JSTOR (October 2015)
St. Lucie Canal
The St. Lucie Canal as seen from US 98 looking east
LocationMartin County, Florida
CountryUnited States
Coordinates27°02′22″N 80°23′00″W / 27.0394°N 80.3832°W / 27.0394; -80.3832
Specifications
Length26 miles (42 km)
Locks2
Total rise11–12.5 feet (3.4–3.8 m)
Navigation authorityU.S. Army Corps of Engineers
History
Construction began1916
Date completed1924
Geography
Start pointLake Okeechobee
End pointIndian River Lagoon
Route map
Legend
St. Lucie River
to Indian River Lagoon
Florida 714.svg SR 714
Southwest Martin Highway
South Branch St. Lucie River
I-95.svg I-95
Florida's Turnpike
St. Lucie Lock and Dam
CR 76A jct.svg CR 76A
Florida 710.svg SR 710
Auburndale Subdivision (CSX)
K Branch (SCXF)
US 98.svg US 98
Port Mayaca Lock and Dam
Lake Okeechobee
Okeechobee Waterway
to San Carlos Bay
This diagram:

The St. Lucie Canal, also known as the C-44 Canal or simply C-44, is a man-made canal in Martin County, Florida, connecting Lake Okeechobee to the Indian River Lagoon. The canal was built between 1916 and 1924 to divert floodwaters from the lake into the St. Lucie Estuary via the South Fork of the St. Lucie River. Deepened in 1937 to enable the passage of boats, the St. Lucie Canal is now the eastern segment of the Okeechobee Waterway.

The C-44 has been a source of contention since its construction. The canal has had significant environmental impacts—restoration projects in the St. Lucie River are the northernmost component of the Comprehensive Everglades Restoration Plan.

Description

The St. Lucie Canal connects to Lake Okeechobee at Port Mayaca, Florida. The canal is 8 feet (2.4 m) deep as a result of its second deepening in 1949. It has a rate of flow of 9,000 cubic feet (250 m) per second. In 1933, 16 fixed spillways were approved for construction to reduce shoaling.

The C-44 has a drainage basin of 185 square miles (480 km), equivalent to 117,000 acres (47,000 ha).

Water flow

In 1924, the canal′s original flow capacity was 5,000 cubic feet (140 m) per second. In 1937, the canal was deepened to 6 feet (1.8 m) increasing its flow capacity. In 1949, it was deepened to 8 feet (2.4 m), which increased the flow capacity to 9,000 cubic feet (250 m) per second.

According to the Florida Department of Environmental Protection, the St. Lucie Canal flows both east to the St. Lucie Estuary and west to Lake Okeechobee "on about an equal basis."

Navigation

The St. Lucie Canal connects to the Caloosahatchee Waterway, which connects Lake Okeechobee to the Gulf of Mexico at Fort Myers, Florida.

Locks and structures

There are two locks on the St. Lucie Canal. The Port Mayaca Lock and Dam (also known as S-308) is located at the western end of the canal at its outlet to Lake Okeechobee. Its rise is typically 0.5–2 feet (0.15–0.61 m). The St. Lucie Lock and Dam (S-80) divides the canal from sea level on the eastern side, a rise of about 10.5 feet (3.2 m).

A structure known as S-153 regulates water flow from the Levee 65 Borrow Canal into the St. Lucie Canal.

Environmental and navigation problems

Fresh water discharge

One of the major problems resulting from the construction of C-44 is that control of the water levels of Lake Okeechobee causes too much fresh water to discharge from the canal into the St. Lucie Estuary. Large discharges from Lake Okeechobee into C-44 cause salinity levels to drop rapidly, killing many species in the estuary.

Turbidity

High flow rates in the canal result in erosion and the transport of sediment into the St. Lucie Estuary that can smother benthic habitats. The increased turbidity of high flow rates also results in sediment filling navigation channels.

Drainage basin

Drainage from the canal′s drainage basin into the St. Lucie Canal creates water quality problems in the St. Lucie Estuary.

History

Construction of the C-44 Canal began in 1916 and was completed in 1924. The original purpose of the canal was to allow for an improved way to divert floodwaters from Lake Okeechobee. The canal was originally designed to flow into Manatee Pocket instead of the South Fork of the St. Lucie River.

The C-44 has been a source of contention since its construction in 1916. Records indicate that people have been complaining about the negative impacts of the canal since the early 1950s.

Timeline

  • 1916: Construction begins on canal C-44.
  • 1924: Construction is completed, providing a flow capacity of 5,000 cubic feet (140 m) per second.
  • 1937: The C-44 is deepened to 6 feet (1.8 m) to allow for the navigation of vessels to and from Lake Okeechobee.
  • 1949: The C-44 is deepened to 8 feet (2.4 m), increasing the flow capacity to 9,000 cubic feet (250 m) per second.

References

  1. ^ "Florida Department of Environmental Protection -- Ecosummary: C-44 Canal, Martin County, Florida" (PDF). Florida Department of Environmental Protection. Florida Department of Environmental Protection. March 2001. Archived from the original (PDF) on 30 December 2016.
  2. "Florida Department of Environmental Protection -- Significance of North Fork St. Lucie River Aquatic Preserve".
  3. "Jacksonville District – Port Mayaca Lock and Dam". www.saj.usace.army.mil. U.S. Army Corps of Engineers. Retrieved 19 February 2022.
  4. "Jacksonville District – St. Lucie Lock and Dam". www.saj.usace.army.mil. U.S. Army Corps of Engineers. Retrieved 19 February 2022.
Significant waterways of Florida
Larger rivers
Lakes
Smaller rivers
Creeks and
streams
Canals
See also
Categories: