Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
Road in Serbia
You can help expand this article with text translated from the corresponding article in German. Click for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Misplaced Pages article at ]; see its history for attribution.
You may also add the template {{Translated|de|Brzi put 11}} to the talk page.
The route is an expressway with two lanes (one in each direction). Construction of the road finished in 2022 and is in operation in full length from the connection with A1 to the Kelebija border crossing. According to the Space Plan of Republic of Serbia, there are no plans to upgrade the road to a four-lane motorway.
Sections
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can. (November 2021)