T6 (Sirkeci - Kazlıçeşme) Tram Line | |
---|---|
The starting station of the line, Sirkeci | |
Overview | |
Status | Opened |
Owner | Turkish State Railways |
Line number | T6 (IMM) U3 (UAB) |
Locale | Istanbul, Turkey |
Termini | |
Stations | 8 |
Service | |
Type | Rail system |
System | Istanbul Metro |
Services | 1 |
Operator(s) | TCDD Taşımacılık |
Rolling stock | TCDD E32000 |
History | |
Opened | 26 February 2024 |
Technical | |
Line length | 8.394 km (5.216 mi) |
Number of tracks | 1 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The T6 Sirkeci–Kazlıçeşme Tramway Line or U3 Sirkeci–Kazlıçeşme Rail Line (Turkish: Sirkeci – Kazlıçeşme Raylı Sistemi/Tramvay Hattı) is a tram line, rail line or light rail line that operates between the Sirkeci Terminal and Kazlıçeşme Station.
The T6 line uses approximately 8.3 kilometres (5.2 mi) of track previously used by the Istanbul Sirkeci-Pythio Railway and Istanbul suburban closed since August 12, 2013 as part of construction of the Marmaray, running on refurbished tracks through Sirkeci and Kazlıçeşme. The line currently uses repainted TCDD E32000 units used on the Marmaray line, but is expected to have modernized nostalgic tram vehicles, although when these nostalgic tram vehicles will be put into operation remains unclear.
With the completion of this project, it is once again possible for regional and international trains to depart from Sirkeci as before, and for trains carrying dangerous goods that could not use the Marmaray Tunnel to be transported from Sirkeci to Haydarpaşa by train ferry.
The line is defined as a rail line by the Ministry of Transport and Infrastructure, but defined as a light rail or tram system by the Istanbul Metropolitan Municipality (IMM).
Stations
No | Station | Type | Transfer | District | Notes |
---|---|---|---|---|---|
1 | Sirkeci | At-Grade | ・・ İETT Bus: BN1 |
Fatih | Sirkeci Station・Sirkeci Railway Museum・Gülhane Park・Istanbul Governorate・Eminönü |
2 | Cankurtaran | İETT Bus: BN1 | Cankurtaran Social Facility | ||
3 | Kumkapı | İETT Bus: BN1 | |||
4 | Yenikapı | Viaduct | ・・・ İETT Bus: 30D, 31, 31Y, 50Y, 70FY, 70KY, 71AT, 72YT, 76A, 77, 88A, 146T, 366Y |
Yenikapı Square・Dr. Kadir Topbaş Exhibition & Art Center・Yenikapı İETT Platform The station will be 750m from the Aksaray tram station with a transfer opportunity. | |
5 | Cerrahpaşa | At-Grade | İETT Bus: 80, 80T | Cerrahpaşa Hospital | |
6 | Kocamustafapaşa | İETT Bus: 35, 35A, 35C, 35D, 80, 80T, BN1 | |||
7 | Yedikule | İETT Bus: 80, 80T, BN1 | Yedikule Dungeons | ||
8 | Kazlıçeşme | Viaduct | İETT Bus: 48A, 50K, 80, 80T, 85C, 97E, MR10, MR11, MR20 |
Zeytinburnu |
References
- "Sirkeci-Kazlıçeşme Raylı Sistem Hattı bugün açılacak". TRT (in Turkish). 2024-02-25. Retrieved 2024-02-26.
- ^ "Ulaştırma Bakanı Karaismailoğlu: Kazlıçeşme-Sirkeci̇ Raylı Sistem Hattı İstanbul'a Değer Katacak". Ministry of Transport and Infrastructure (in Turkish). Archived from the original on 2023-08-30. Retrieved 2022-09-30.
- "Kazlıçeşme-Sirkeci Kentsel Ulaşım ve Reakreasyon Odaklı Dönüşüm Projesi'nin tanıtımı yapıldı". www.aa.com.tr. Retrieved 2022-09-30.
- Uysal, Onur (2021-09-26). "Sirkeci projesi açıklandı". Rail Turkey Tr (in Turkish). Retrieved 2022-09-30.
- "12 Ağustos 2013 tarihinden itibaren İstanbul-Yedikule banliyö trenleri işletilmeyecektir". Turkish State Railways (TCDD) (in Turkish). 2013-08-06. Archived from the original on 2013-08-13. Retrieved 2021-12-01.
- "Sirkeci-Kazlıçeşme hattında ilk test sürüşü". CNN Türk (in Turkish). 2023-08-19. Archived from the original on 2024-01-20. Retrieved 2024-04-05.
- "Underconstruction Lines Network Map v.3 rev.17.3" (JPG). Metro Istanbul (in Turkish and English). Metro Istanbul. 2023 . Archived from the original on 2023-08-31. Retrieved 2023-08-31.
- General
- "İETT bus lines". İETT. Retrieved 2024-04-05.
External links
Media related to Istanbul Tramway line T6 at Wikimedia Commons
Mass transit in Istanbul | |||||
---|---|---|---|---|---|
Metro |
| ||||
Tram |
| ||||
Commuter rail |
| ||||
Funicular |
| ||||
BRT | |||||
Bus | |||||
Ferry | |||||
Aerial lift | |||||
Payment |
| ||||
Operators | |||||
Lines in italic are under construction with planned opening year in parentheses. |